Loading...
HomeMy WebLinkAboutCOUNTRY CLUB RESERVE - Filed P-PERMITS -City of ,ktColli� Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970 .221.6378 -fax fcgov. com/engineering REVOCABLE ENCROACHMENT PERMIT APPLICATION in the Public Right-of-Way (Minimum of 5 business days required for approval) ENCROACHMENT SUBMITTAL INFO: All submittals MUST include the following with this application: 1. A sketch plan that shows the proposed location(s) of the encroachment(s) and locations of the property line(s),sidewalk(s), and street(s). A licensed surveyor may be required to accurately locate property boundary(s).2.Applicants for an encroachment permit that will occupy any parking spaces in the downtown area must notify the Cityof Fort Collins Parking Services Department, at 215 N. Mason Street, (970) 221-6617. Applicant Name: Cou ntry Club Rese r ve company: Count ry Club Reserve, LLC Address: 144 N. Ma son St., Suite 4 Sub-Contractor: Coyote Ridge Constructi on Address: 6648 County Rd. 56 Phone: (970) 407-7808 Email: jd@postm oderndevelopment.com City : Ft. Collins State: C O Zip: 80524 City : Johnstown Phone: (970) 776 -9165 State: CO Zip: 80534 Location of Encroachment (Address): 250 LF South of Ballyneal Dr. crossing Turnberry Road (West to East) Type of Right-of-way Impacted: I!!! Street □ Alley □ Sidewalk □ Other: _______ _ Purpose of Encroachment: _s_t _o _r _m_O_u_tf_a_l_l _________________________ _ Dates of Encroachment: From: 3 / 15 / 2022 To : 1 / 15 / 2023 or Until Revoked (permanent type items) This permit is non-transferable , is personal to the Applicant and is non-assignable. Applicant agrees that any transfer of ownership of the business holding the permit will terminate this permit and require a new application to be filed by the new owner. Applicant has read this permit and agrees to abide by the City of Fort Collins Municipal Codes, Standard Plans and Specifications and to such special conditions, restrictions, and regulations as may be imposed by the Engineering Department. APPLICANT SIGNATURE: 9° p� JD Pad· Encroachment Permit Type: □ Minor �Major DATE: 12/20/2022 Permit Fees: Application Fee: $ _____ _ Inspection Fee: $ _____ _ Total Due: $ _____ _ Conditions: ____________________________________ _ CITY OF FORT COLLINS APPROVAL:---..,�� =>""'----,....�--:r:::. .... �=--:r-------□ATE: ___,1'1--/ ..... s=<---J./.,..d:::....O--=;;)"'-,'S_,___ Revised: 10/15/2018 '<eAI\_ cel;e... Permit Number: __________ _ 23-9000 LOCAL RESIDENTIAL (53' ROW) 2-LANE ARTERIAL STREET (78' ROW) EAST DOUGLAS ROADBETHPAGE DR. WINGED FOOT DR. BALLYNEAL DR. CARNOUSTIE DR. ROYAL TROON AVE. 2-LANE ARTERIAL STREET (72' ROW) TURNBERRY ROAD Sheet of 76COUNTRY CLUB RESERVE301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRON RNPHONE: 970.221.4158www.northernengineering.com02/25/21 CS1 COVER SHEET1 CONTACT INFORMATION PROJECT TEAM: GAS-----------------Xcel Energy---------------------------------------------------------(970) 225-7828 ELECTRIC-------- City of Fort Collins Light & Power-----------------------------(970) 224-6152 CABLE------------- Comcast-------------------------------------------------------------(970) 567-0245 TELECOM.--------CenturyLink---------------------------------------------------------(970) 490-7501 WATER------------ East Larimer County Water District---------------------------(970) 221-6700 WASTEWATER--Boxelder Sanitation District-------------------------------------(970) 498-0604 STORMWATER- City of Fort Collins Utilities--------------------------------------(970) 221-6700 FIBER OPTICS-- Colorado State University---------------------------------------(970) 491-0187 UTILITY CONTACT LIST: * UTILITY COMPANY FEBRUARY 2021 SHEET INDEX FINAL UTILITY PLANS FOR A TRACT OF LAND BEING THE NORTH HALF OF THE NORTHEAST QUARTER OF SECTION 30, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO COUNTRY CLUB RESERVE PHONE NUMBER Blaine Mathisen, EI Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 Bob Tesley, PLS Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 VICINITY MAP NORTH I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: Northern Engineering Services, Inc.Additional Topo Project No. 103-005 1324-001 Date: July 11, 2006 May 2, 2017 ORIGINAL FIELD SURVEY BY: Earth Engineering Consultants, Inc. Preliminary Geotechnical Exploration - Boma Farm Development Fort Collins, Colorado EEC Project No. 1062013 Date: February 22, 2006 SUBSURFACE EXPLORATION BY: PROJECT BENCHMARKS: E N G I N E E R N GI EHTRON RN E N G I N E E R N GI EHTRON RN CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R SITE ENGINEER SURVEYOR CS1 COVER SHEET CS2 - CS3 GENERAL AND CONSTRUCTION NOTES EX1 - EX2 EXISTING CONDITIONS AND DEMOLITION PLAN PH1 PHASING PLAN OG1 OVERALL GRADING PLAN G1 - G6 GRADING PLAN EC1 EROSION CONTROL PHASE 1 EC2 EROSION CONTROL PHASE 2 EC3 EROSION CONTROL DETAILS OU1 OVERALL UTILITY PLAN U1 - U6 UTILITY PLAN OS1 - OS4 OFFSITE SANITARY SEWER PLAN AND PROFILE SS1 - SS3 SANITARY SEWER A PLAN AND PROFILE SS4 SANITARY SEWER A5 PLAN AND PROFILE SS5 - SS6 SANITARY SEWER A5-1 PLAN AND PROFILE SS7 SANITARY SEWER A5-1.5 & A5-1.6 PLAN AND PROFILE SS8 SANITARY SEWER B PLAN AND PROFILE SS9 SANITARY SEWER B4 PLAN AND PROFILE SD1 SUBDRAIN A AND B PLAN AND PROFILE SD2 SUBDRAIN A PLAN AND PROFILE SD3 SUBDRAIN C AND C2 PLAN AND PROFILE ST1 STORM LINE A AND F PLAN AND PROFILE ST2 STORM LINE B, C, AND E PLAN AND PROFILE ST3 STORM LINE D PLAN AND PROFILE R1 BETHPAGE DR. PLAN AND PROFILE R2-R3 WINGED FOOT DRIVE PLAN AND PROFILE R4 BALLYNEAL DRIVE PLAN AND PROFILE R5 CARNOUSTIE DRIVE PLAN AND PROFILE R6 BALTUSROL DRIVE/BALTUSROL COURT PLAN AND PROFILE R7 BALTUSROL DRIVE PLAN AND PROFILE R8 ROYAL TROON AVENUE PLAN AND PROFILE R9-R11 EAST DOUGLAS ROAD PLAN AND PROFILE R12-R13 TURNBERRY ROAD PLAN AND PROFILE XS1-XS3 EAST DOUGLAS ROAD ROADWAY CROSS SECTIONS XS4-XS5 TURNBERRY ROAD ROADWAY CROSS SECTIONS SP1 EAST DOUGLAS ROAD STRIPING PLAN SP2 EAST DOUGLAS ROAD INTERIM STRIPING AND GRADING PLAN SP3 TURNBERRY ROAD STRIPING PLAN INT1-INT4 INTERSECTION DETAILS DR1 DRAINAGE EXHIBIT D1-D8 DETAILS PROJECT LOCATION The Birdsall Group, LLC 444 Mountain Avenue Berthoud, CO 80513 (970) 532-5891 PLANNER/ LANDSCAPE ARCHITECT DEVELOPER/APPLICANT Crystal Cove Development, LLC 8020 S County Road 5, Unit 200 Fort Collins, CO 80528 (970) 204-9393 PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 92-14 NORTHEAST CORNER OF DOUGLAS ROAD AND TURNBERRY ROAD, ON TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 5075.10 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 92-15 DOUGLAS ROAD AND COUNTY ROAD 13, ON A LARIMER COUNTRY BRASS CAP, ON THE SOUTHWEST CORNER OF A BRIDGE OVER LARIMER CANAL DITCH. ELEVATION = 5123.89 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED(PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.17 BASIS OF BEARING: THE BASIS OF BEARINGS IS THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 30-T8N-R68W AS BEARING SOUTH 89°21'11" EAST. 02/25/21 2 110.21.2022JUNITA LANE WATERLINE CONNECTIONBPM212.20.2022STORM LINE A OUTFALL INTO NO. 8 DITCHBPM1 * * The City is approving the revised plans for purposes of the City’s land use regulations on the condition that the developer has a valid easement for the infrastructure, with the City not taking any position on whether the developer currently has such an easement. DocuSign Envelope ID: 0C18BBA3-957C-4EA6-A113-8B96CFB4DFD1 NA NA CS1,ST1 CS1,ST1 NA Revised NA Revised 12/25/2022 Ken Sampley 12/27/2022 Marc Virata V.P.XWWWWWWW14"W 1976 (AC)FOFOFOFOFOFOFOGGGGGGGIRRIRRIRRIRR15" SS15" SS15" SS15" SS15" SSSDSDSDSDSD16" W16" W16" W16" W16" W16" WSDFES A1 STA 10+00.00 N: 149389.48 E: 205496.52 54.45 LF 24" RCP @ 5.00% OUTLET A4 STA 11+80.46 N: 149403.60 E: 205317.59 NO. 8 DITCHNO. 8 D ITCH DEPTH GAUGE SUBDRAIN B SEE SHEET SD2 TURNBERRY ROAD72' R.O.W 15' UTILITY EASEMENTSANITARY OFFSITE SEWER SEE SHEET OS3 SUBDRAIN A SEE SHEET SD1 STORM LINE B SEE SHEET ST2 LOT 1LOT 2LOT 3 BLOCK 3 TRACT C ACCESS & DRAINAGE EASEMENT 2' CONCRETE PAN POND 1 TURNBERRY RD. WATER LINE SEE "UTILITY PLANS FOR COUNTRY CLUB RESERVE - OFFSITE WATER LINES" RIP-RAP (TYPE M) TO BE INSTALLED FROM CONCRETE RUNDOWN TO BOTTOM OF THE NO. 8 DITCH (10'x10'). CONTRACTOR TO PLACE GEOFABRIC DOWN PRIOR TO TYPE M RIP-RAP. ADDITIONALLY, CONTRACTOR TO INSTALL A 6" LAYER OF 3" MINUS (TYPE II) BEDDING BETWEEN TYPE M RIP-RAP AND GEOFABRIC. 29.10 LF 24" RCP @ 0.50% STRM MH A2 STA 11+19.70 N: 149403.02 E: 205378.35 INLET A3 STA 11+48.79 N: 149403.26 E: 205349.26 31.67 LF 24" RCP @ 0.48% 16" ELCO WATERLINE (SEE PLANS BY OTHERS) GAS AND OIL BUFFER 6'Ø DROP MH A STA 10+54.45 N: 149402.26 E: 205443.60 65.25 LF 24" RCP @ 0.50% 20' DRAINAGE EASEMENT 10' 10' CONTRACTOR TO PROTECT DROP SUBMERGED STRUCTURE OUTLET FROM DAMAGE DURING CONSTRUCTION 20' 20'x10'x6" (LxWxD) CONCRETE RUNDOWN (SEE DETAIL ON THIS SHEET) (45.9 % ) 10' FROM EOA 5030 5035 5040 5045 5050 5055 5060 5065 5070 5075 5080 5085 5030 5035 5040 5045 5050 5055 5060 5065 5070 5075 5080 5085 9+5010+0011+0012+0013+00 OUTLET A4STA 11+80.46FL. EL 5058.0±INV. OUT 5054.50 (E)54.45 LF 24" RCP @ 5.00%FES A1STA 10+00.00INV. 5045.78 (W)PROPOSED GROUND EXISTING GROUND 2.6'STRM MH A2STA 11+19.70RIM 5070.6±INV. IN 5054.20 (W)INV. IN 5054.20 (NW)INV. IN 5054.20 (SW)INV. OUT 5054.20 (E)29.10 LF 24" RCP @ 0.50% 16" PVC WATERLINE STA.=10+94.61 INV.=5064.30 EXISTING 14" AC WATERLINE STA.=11+03.36 INV.=5065.34 15" PVC SANITARY SEWER STA.=10+84.45 INV.=5058.91INLET A3STA 11+48.79RIM 5065.8±INV. IN 5054.35 (W)INV. OUT 5054.35 (E)31.67 LF 24" RCP @ 0.48% 65.25 LF 24" RCP @ 0.50%6'Ø DROP MH ASTA 10+54.45RIM 5068.2±INV. IN 5053.88 (W)INV. OUT 5048.50 (E)CONCRETE RUNDOWN TO TOE OF SLOPE (20'x10'x6") TYPE M RIPRAP (10'x10') EXISTING 18" IRRIGATION STA.=10+91.18 INV.=5060.72 XXXXXXXX X X X X X XXOHEOHEOHEOHEOHE/ / / / / / / /ST ST ST ST / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /WWWWWWW/ / / / / / / /W FOFOFOFOFOFOFOGGGGGGG15" SS15" SS15" SS15" SS15" SS8" SS 8" SS 8" SS 8" SS 8" SS 8" SS SD SD SD SDSDSDSDSD16" W16" W16" W16" W16" W16" WTURNBERRY ROADEXISTING 24" CMP 2' CONCRETE PAN POND 1 SANITARY SEWER A SEE SHEET SS1 SUBDRAIN A SEE SHEET SD1 SANITARY OFFSITE SEWER SEE SHEET OS3 72' R.O.W EXISTING 14" ELCO AC WATERLINE 30' SANITARY SEWER EASEMENT TO BE DEDICATED BY SEPARATE DOCUMENT 15' UTILITY EASEMENTSTORM LINE E SEE SHEET ST2 TRACT C ACCESS & DRAINAGE EASEMENT FES F1 STA 10+60.12 N: 148738.90 E: 205350.08 FES F2 STA 10+00.00 N: 148787.89 E: 205315.23 60.12 LF 24" HDPE @ 2.00% TURNBERRY RD. WATER LINE SEE "UTILITY PLANS FOR COUNTRY CLUB RESERVE - OFFSITE WATER LINES" GAS AND OIL BUFFER 5045 5050 5055 5060 5065 5070 5075 5080 5085 5045 5050 5055 5060 5065 5070 5075 5080 5085 9+50 10+00 11+00 11+50FES F2STA 10+00.00INV. 5061.74 (SE)60.12 LF 24" HDPE @ 2.00%FES F1STA 10+60.12INV. 5062.94 (NW)PROPOSED GROUND EXISTING GROUND 8" PVC SANITARY SEWER STA.=10+45.30 INV.=5056.60 Sheet of 76COUNTRY CLUB RESERVE301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.com02/25/21 ST1 PLAN AND PROFILESTORM LINE A AND F40 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R STORM LINE A KEYMAP DOUGLAS RD TURNBERRY RDPROFILE SCALE: NORTH STRM A 8" W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORMLINE LEGEND: NOTES: W OHE OHE T E EXISTING STORM SEWER ST PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERDRAIN SUBDRAIN CLEANOUT SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT PROPOSED LOTLINE RIGHT OF WAY PROPERTY BOUNDARY SS PROPOSED SUBDRAIN UD SD EXISTING FIRE HYDRANT PROPOSED STORMLINE NATURAL HABITAT BUFFER ZONE (NHBZ) EASEMENT LINE EXISTING SANITARY SEWER GEXISTING GAS 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 7.ALL SUBDRAINS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 8.SEE STORM LINE PROFILES FOR CLARIFICATION ON OWNERSHIP AND MAINTENANCE RESPONSIBILITIES. 9.RAIN GARDENS AND PONDS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 10.PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORTS FOR TEMPORARY AND PERMANENT CONTROL MEASURES. 11.SEE DETAIL SHEET EC3 FOR RIPRAP SCHEDULE. INLET SUMMARY INLET ID TYPE A3 TYPE C C1 CURB INLET-4 FT D1 DOUBLE CURB INLET D2 DOUBLE CURB INLET D3 DOUBLE CURB INLET D5 CURB INLET-4 FT D6 CURB INLET-4 FT E1 CURB INLET-4 FT ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 PROFILE SCALE: STORM LINE F STRM F PUBLICLY OWNED AND MAINTAINED 212.20.2022STORM LINE A OUTFALL INTO NO. 8 DITCHBPM1 PRIVATELY OWNED AND MAINTAINED 2 2 GEOTECHNICAL REQUIREMENT NOTES: 1.COMPACTION TESTING, MAXIMUM LIFT, AND SOIL KEY SPECIFICATIONS FOR BACKFILLING AROUND 6'Ø DROP MH A SHALL FOLLOW REQUIREMENTS SET FORTH BY THE MODIFIED EMBANKMENT/EARTHWORK RECOMMENDATION (SEE NOTE 3) ORIGINALLY SET FORTH BY "PRELIMINARY GEOTECHNICAL EXPLORATION - BOMA FARM DEVELOPMENT" BY EARTH ENGINEERING CONSULTANTS, INC. TO ENSURE PROPER REBUILDING OF THE EMBANKMENT. 2.SEE COVER SHEET OF APPROVED DRAWINGS FOR ADDITIONAL INFORMATION ABOUT "PRELIMINARY GEOTECHNICAL EXPLORATION - BOMA FARM DEVELOPMENT" 3."THE SITE LEAN CLAY SOILS COULD BE USED FOR BACKFILLING IN OVEREXCAVATION BACKFILL AREAS AND THE EMBANKMENTS ASSOCIATED WITH THE No. 8 DITCH. OTHER APPROVED FILL MATERIALS WHICH ARE FREE FROM ORGANIC MATTER AND DEBRIS AND CONTAINING SUFFICIENT FINES TO PREVENT PONDING OF WATER IN THE SUBGRADES COULD ALSO BE USED. PLACEMENT OF BACKFILL MATERIAL WITHIN THE No. 8 DITCH EMBANKMENT ZONE SHOULD BE PLACED IN LOOSE LIFTS NOT TO EXCEED 9 INCHES THINK WITH MOISTURE CONTENTS IN THE RANGE OF -1 TO +3% OF STANDARD PROCTOR OPTIMUM MOISTURE CONTENT AND COMPACTED TO AT LEAST 95% OF STANDARD PROCTOR MAXIMUM DRY DENSITY AS DETERMINED BY (ASTM SPECIFICATION D698) TESTING PROCEDURES. 4.NOTE 3 CONFORMS TO LCUASS AND ASTM REQUIREMENTS. 4 2 10' 6" 1"CONCRETE 1.67%1.67% 6x6 - W14xW14 CONCRETE RUNDOWN STANDARD CONCRETE NOTES NOTE: PROVIDE CONTROL JOINTS AT 10' INTERVALS Ø24" INVERT = 5045.78 6" 24" 6" (TYP.) KEY TRENCHES (TYP.) 10' 10' EXTEND REINFORCEMENT TO KEY TRENCHES 24" RCP NATIVE SOIL TYPE M RIP-RAP TYPE II BEDDING 6" OVERLAP (MIN.) DocuSign Envelope ID: 0C18BBA3-957C-4EA6-A113-8B96CFB4DFD1