Loading...
HomeMy WebLinkAbout910 HILL POND RD - SPECIAL INSPECTIONS - 9/16/2021A CHAYAH u CO N S _U 1 L '. I N G September 16, 2021 David Alavarado Construction Manger Schuman Compaines Subject: Duplex wall framing '114 Hill Pond Duplexes Lots 8 Project No. 186601 Mr. Alavarado: WWW.CHAYAH-CG.COM Chayah Co ns ulting was onsite 09/09/2021 to observe the as-built condition of the duplexes living room wall framing -specifica lly the header above the window on the rear living room wall. It is Chayah Consulting Group's professional opinion that moving the header from directly above the window to the top o f the wall is acceptable. Since there is a minimum of two packed stud posts full length on either s ide of the window. However, to e nsure structural stability where all full-length studs are broken in living room -contractor should add 30 inch Simpson CS22 or equal fully nailed straps directly over header where studs break with 8 penny n ails. The same strap shou ld be used at a ll broken studs at the exterior wal l in the living room. If you have any questions or if you require further information regardi ng this project, please ca ll at (970) 578-0184. Sincerely, CHAYAH CONSULTING GROUP, LLC Cody A. Geisendorfer, PE Principal Engineer NORTH FLOR IDA -(90 4) 447-78 60 COLOR ADO FRONT RANGE -(970) 578-0 184 SOUTHW EST FLORIDA -(941) 270 -4486 'i to ti;(\ POltd.. i t..e + i 6 2 'd.,J f.J'o PAGE 2