Loading...
HomeMy WebLinkAbout621 WOOD ST - SPECIAL INSPECTIONS - 7/28/2021 CTL I THOMPSOM July 22, 2021 Mr. Steve Josephs Craftsmen Builders 319 E Magnolia Street Fort Collins, CO Subject: Sttu?P.ral Review of Front Porch Roof Framing 621 Wood Street Fort Collins, Colorado -7, CTLIT Project Number: FC09879 / Dear Mr. Josephs, Per your request, personnel from our office have reviewed the front porch roof framing on the structural plans provided (CTL I T Job No. FC09879, dated 04/05/2021). The as-built roof framing deviated from the roof framing specified on the structural plans mentioned above, in the following ways: 1. 6x10 dropped roof beam installed instead of 8x10. Attachment of the 6x10 beam to 6x6 posts was secured with (4) 16-inch lag bolts. Rafters were attached to the beam with (2) 10-inch lag bolts each. Rafters were attached to the existing roof via 2x4 plate, secured with (1) 10-inch lag bolt. The 2x4 plate was secured to the existing roof with 3-5/8 lag bolts at 24" O.C. :77 I� r , t F 400 North Link Lane I Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 Based on our review of the front porch roof framing, it was determined that the as-built conditions are sufficient to carry the design loads, and no additional changes need to be made to the structure. Thank you for selecting CTLITHOMPSON for your engineering needs. When we can be of additional service, please contact our office. Very truly yours, CTLITHOMPSON, INC. Q .ao cic� - �,••�s 57132 Alex Davis, PE Project Engineer STEVEJOSEPHS 621 WOOD STREET CTL I T PROJECT NO.FC09879 2