Loading...
HomeMy WebLinkAboutMOSAIC SUBDIVISION (SINGLE FAMILY AND ALLEY LOADS) - SPECIAL INSPECTIONS - 6/2/2020 CTL I THOMPSON June 2,2020 Hartford Construction, LLC 4801 Goodman Street Timnath, Colorado Mr.Adam Hess Subject: Stair Framing Connection at Garage Mosaic Subdivision (Single-Family and Alley Loads) Mosaic Subdivision, Fort Collins, CO CTL Thompson Project Number: FC07735.000—L11 Mr. Hess, You have requested that an attachment for pre-assembled stairs at the garage be provided for the Mosaic Subdivision. This attachment will satisfy 2018 IRC design loads for both the single- family residences and alley load plans at the subdivision. The attached sheet shows an attachment to the garage sill plate for pre-assembled stairs with four risers or less. The attachment uses SDWS screws drilled through plywood from the pre- assembled stairs to the garage sill plate. Please note the stringer resting on the garage slab in the stair assembly does not need to be moisture treated. Thank you for selecting CTL Thompson for your engineering needs.When we can be of additional service, please contact our office. Very truly yours, CTL Thompson, INC. 00 u�s� TYLF 00 670 Jun 2 2020 1:14 PM Devin Hougard, EIT Nicholas Reuter, PE Staff Engineer Project Engineer Attached: (1) Stair Attachment at Garage 400 North Link Lane I Fort Collins,Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 ATTACH PRE-ASSEMBLED STAIR TO 2x P.T.SILL PLATE w/MIN.(6).22"0 x 3" SDWS SCREWS NOTE:CONNECTION APPLIES ONLY TO PRE-ASSEMBLED ! � STAIRS WITH 4 RISERS OR LESS GARAGE SLAB HEM FIR STRINGER MATERIAL ALLOWED TO BEAR ON SLAB WITH NO MOISTURE TREATMENT TITLE: STAIR CONNECTION AT GARAGE DRAWN: SHEET CT L I T H O M PS O N PROJECT0 FC07735.000 DATE. OF CLIENT: HARTFORD HOMES 06=020 SITE: MOSAIC SUBDIVISION CTL I THOMPSON,INC.FT COLLINS,LLC P:970-2059455 SCALE: FORT COLLINSCO 400 North Link Lane,Fort Collins,CO 80524 F:970-2059441 NTS C..`y