HomeMy WebLinkAbout2938 CONQUEST ST - SPECIAL INSPECTIONS - 7/30/2021 CTL I THONIP.SON
November 16,2020
Hartford Construction, LLC
4801 Goodman Street ��� 7 �✓�
rh, Colorado M .Ad
Mr.Adam Hess
Subject: Pre-assembled Stair Framing Connection
Mosaic Subdivision (Single-Family and Alley Loads)
Mosaic Subdivision, Fort Collins, CO
CTL Thompson Project Number: FC07735.000—L12
Mr. Hess,
You have informed us that some pre-assembled stairs at the garage have been constructed
with 5 risers, located in the Mosaic Subdivision.The previously provided detail states the
my allowed
connection is o with 4 risers or less.
i
The stair framing for the case of 5 risers has been reviewed,and the previously submitted
connection with (6) SDWS screws has been determined to have adequate strength to resist the
design loads. The pre-assembled stair framing detail at the garage may be used for cases with
up to 5 risers.
Thank you for selecting CTL Thompson for your engineering needs.When we can be of
additional service, please contact our office.
Very truly yours,
CTL Thompson, INC.
MQ�.Ur�
00 679
Nov 16 2020 9:04 AM
Devin Hougard, EIT Nicholas Reuter, PE
Staff Engineer Project Engineer
400 North Link Lane I Fort Collins,Colorado 80524
Telephone:970-206-9455 Fax:970-206-9441