Loading...
HomeMy WebLinkAbout2938 CONQUEST ST - SPECIAL INSPECTIONS - 7/30/2021 CTL I THONIP.SON November 16,2020 Hartford Construction, LLC 4801 Goodman Street ��� 7 �✓� rh, Colorado M .Ad Mr.Adam Hess Subject: Pre-assembled Stair Framing Connection Mosaic Subdivision (Single-Family and Alley Loads) Mosaic Subdivision, Fort Collins, CO CTL Thompson Project Number: FC07735.000—L12 Mr. Hess, You have informed us that some pre-assembled stairs at the garage have been constructed with 5 risers, located in the Mosaic Subdivision.The previously provided detail states the my allowed connection is o with 4 risers or less. i The stair framing for the case of 5 risers has been reviewed,and the previously submitted connection with (6) SDWS screws has been determined to have adequate strength to resist the design loads. The pre-assembled stair framing detail at the garage may be used for cases with up to 5 risers. Thank you for selecting CTL Thompson for your engineering needs.When we can be of additional service, please contact our office. Very truly yours, CTL Thompson, INC. MQ�.Ur� 00 679 Nov 16 2020 9:04 AM Devin Hougard, EIT Nicholas Reuter, PE Staff Engineer Project Engineer 400 North Link Lane I Fort Collins,Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441