Loading...
HomeMy WebLinkAbout1300 YOUNT STREET - SPECIAL INSPECTIONS - 5/25/2021May 25, 2021 Attn: NoCo RMP W E! E! f-115 B: El55CC:J:EITE!5 STR U CT U RA L.. E NGINEER S Re: Footing and Foundation Wall Steel -Addition 1300 Yount Street Fort Collins, Colorado Project No. 221049 Gentlemen: On May 14th and 1 g tti, 2021, a representative of Weeks & Associates observed footings and foundation wall steel at the referenced site. Observations indicate the footing size and foundation steel reinforcement are in substantial accordance with the engineered foundation plan for the project by Weeks & Associates. In addition, the electrode had been placed in accordance with the recommendations by NEC. If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. Patrick Sanders, P.E. Staff Engineer Digitall y signed by Gary Weeks DN: (n,,,G.lry Wee ks. o•Weeks & G Weeks Anociat•~ln<,ou. a ry ema~ry.wcck.s@weeksinc.co m,cz US Da1e: 2021,0S.25 13:57:08 -06'00' Gary G . Weeks, P.E. Structural Engineer 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 -Fax (970) 225.2622