Loading...
HomeMy WebLinkAbout619 STOVER ST - SPECIAL INSPECTIONS - 5/7/2021 (3)Olro-urn tf ngin.e.ering, llr. May 7, 2021 Structure, 1nc . Doug Sinclair 723 E. 5th Street Loveland, CO 80537 §lru.rhtrnl 1Engin.eet·ing & ]ttsp.rdhnts Re: fm;ndation Wall Steel Reinforcement Observation at '619 S tov er Street , Fort Coll ins, CO Crown Engineering, lie. Project No. 250-01-11-04 Dear Mr. S inclair: We have visually observed the foundation wall steel reinforcing placed in the wall forms at the residential addition under construction at the above referenced location. This observation was perfom1cd on Apri l 13, 2021. It is our opinion that the reinforcement was placed in general conformance with the foundation plans, drawn by Crown Engineering, lie ., Job No. 250-01-11-0 J. Thank you for consulting with us on this phase of the project. If you have any questions, please do not hesitate to contact me at (970) 691-4239. Sincerely, C!Jr.own 1£ nginPPcing, Ur. ~J~-----· ·~44/\ to, P.B. "' Strnctw·al Engineer • Main Office 5 24 Stover S treet Fort Collins, Colorndo 80524 Phone: (970) 498-9537 CeU: (970) 691-11239 Fax: (970) 221-152 1 t•-mail: n•n•ssf:;,,. 1n.sn .n,m