Loading...
HomeMy WebLinkAbout619 STOVER ST - SPECIAL INSPECTIONS - 5/7/2021@rourn if ngin.e.ering, llr. May 7 , 2021 Strncture, Inc. Doug Sinclair 723 E. 5th Street Loveland, CO 80537 §ku.dural 1£nginuring & ]nsp.edinns ✓ Re: Excavation Observation for Addition at 619 Stover Street, Fort Collins , C O Crmvn Engineering, lie. Project No. 250-01-11-02 Dear Mr. Sinclair: As requested, we have visually observed the excavation at the above referenced location. The purpose of this observation was to verify that the bearing capacity of the soil is adequate for the support of the foundation and structure as shown on the foundation and framing plans drawn by Crown Engineering, lie., project number 250-01-11-0 I. At the time of our observation, the excavation had been completed. The excavation revealed sandy clays to the depths excavated, for a crawl space foundation. It is our opinion that the subsurface conditions exposed in the excavation appear to be suitable for the placement of the foundation as de::;igned by Crown Engineering, Ile. Thank you for consulting with us on this phase of the project. If you have any questions, please do not hesitate to contact me at (970) 691-423 9. Sincerely, C!J:r-.ourn Main Offict• 524 Stove.rStrect Fort Collins. Colorado 80524 !'hone: (970) 498-9537 Cell: (970) 691-4239 Fax: (970) 22 1-1521 e-mail: n ·v,•ss(:,M m~11 . .-,,111