Loading...
HomeMy WebLinkAbout906 BATTSFORD CIR - SPECIAL INSPECTIONS - 7/19/2021July 19,2021 Project No: 2713-84-21 Rocky Mountain Fence & Decks 614 West 29th Street Loveland, Colorado 80538 i;).. \ 0 3 G ~ ?..- Attn: Travis Kerns Re: Lot 63, Provincetowne PUD, Filing One (906 ~tsford Circle); Ft. Collins, CO Deck Addition -Foundation and Framing Modifications Dear Mr. Kerns, Shear Engineering Corporation was involved with certain foundation and framing modifications during deck addition construction at the above reference site. Deck addition plans were prepared by others and are attached for immediate reference. The following describes the specific foundat ion and framing modifications accommodated during construction, It is our understanding that due to existing site conditions, the center deck post/pier was moved over approximately 3'-0", which results in modified deck beam spans of 6'-0" and 12'-0", respectively. Shear Engineering Corporation verified that the double (2) 1 1/2" x 11 1/4" PWT treated L VL deck beam is sufficient for the modified deck beam spans. Shear Engineering Corporation also provided recommendations for deck pier foundat ion sizes. It was recommended to provide a 14" diameter pier at the end post with the 6' deck beam span, a 22" diameter pier at the intermediate post, and an 18" diameter pier at the end post with the 12' deck beam span. All deck pier foundations to be a minimum of 30" below finished grade. Shear Engineering Corporation also performed excavation observations for the deck pier foundat ions on Wednesday, July 7, 2021. These observations were made in order to confirm that deck pier foundation excavations were completed in substantial compliance with the recommendations provided by Shear Engineering Corporation during construction. Following our observation, it is the opinion of Shear Engineering Corporation that deck pier foundations were completed in substantial compliance with the recommendations provided by Shear Engineering Corporation during construction. If you have any questions concerning this letter, please call us at (970) 226-5334. Sincerely, Brian A. Bruckbauer, P.E. Shear Engineering Corporation BAB /bws attachment cc: City of Fort Collins Building Department 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearenginee ring.com 10'-6" C 5' -6"~""9-,,-+.....,,....-t-----"lc---0 A I ....... ----"<--~ -0 I -N ~ D~E I 07'' OFF GRADE COMPOSITE DECK G 18'-0" EXISTING CONG. PATIO BELOW A-1 ~ x 11 ¾ LEDGER-PRESSURE TREATED LVL, WITH DTT12 HARDWARE, GALVANIZED STEEL Z FLASHING WITH 2 LEDGER LOKS PER BAY (ALL LEDGERS) 8-DOUBLE 1 1 x 11 ¾ BEAM -PRESSURE TREATED LVL C-1 ~ x 11 f JOISTS FRAMED ON 16" CENTERS-PRESSURE TREATED LVL D-6 x 6 DOUGLAS FIR POSTS WITH HARDWARE E-14 x 30 CONCRETE CAISSON F-20 x 30 CONCRETE CAISSON G-36" STEEL RAILING STAIR STRINGER ATTACHED WITH LSTA24 STAIR HANGERS/CONNECTORS ABU66-Z SET WITH ~" X 3 ¾" CONCRETE WEDGE ANCHOR AC6-Z POST TO BEAM CONNECTION ON BOTH SIDES LUS28-Z OR LUS210-Z-SINGLE JOIST HANGERS CORNER ATTACHMENT WITH LS70-Z OR LS90-Z ALL BEAMS AND JOISTS WILL BE WRAPPED WITH VYIRCO BEAM AND WRAP WATERPROOF TAPE GENERAL NO TES: GALVANIZED ZMAX JOIST HANGERS TO MEET JOIST SIZE. CORNER BRACKETS, POST TO BEAM BRACKETS, POSTS BASE WITH CONCRETE ANCHORS, HURRICANE CUPS IF REQUIRED, TWO LEDGERLOKS PER BAY, ROLL BLOCKING IF REQUIRED, GALVANIZED NAILS AND SPECIAL GOA TED SCREWS FOR ACQ TREATED LUMBER. LAURIE HUTTON 906 BATTS CIRCLE FORT COLLINS, CO 80525 (305)796-3605 SCALE: 1" = 10'-0"