Loading...
HomeMy WebLinkAbout2802 BARNSTORMER ST - 06 - SPECIAL INSPECTIONS - 7/16/2021T'. CT:LITHOMPSON ,11').l ~~/i>fpAef »:_6 lJ ~101°35 '8,,vul ,7--,1J:, r-~) July 15, 2021 Adam Hess Hartford Homes, LLC 4801 Goodman Street Timnath, Colorado so·54.7 Subject: Mr . Hess, Stair Landing Beam Size 2802 Barnstormer Street Los 19"24 -Mosaic Subdivision Fort Colllns , Colorado CTLIT Project Number: FC07735.405 Devin Hougard Jul 15 2021 5:23 PM It is our understanding that the stair landing framing in all qnits differs tban the design drawings provided by CTL Thompson (proJectnumber FC0773-5.405, dated 02/04/2021). Where a (2) 2x12 beam is ca Med out on plans at the stair landings, (2) .2x8 beams were lnstalled. Per your request; personnel from our office hav:e reviewed the installe.d framing at the main floor ·stair landing. The installed (2)2X:8 beams have adequate strength to ·carry the demand stair loads. The {.2}2x12 peam was specified to allow for a greater beam depth for the stair stringers to attach to-. The installed stringers have a C8'16 strap oorrnectioh with a minimum length of5i' to the (2) 2X8 be.ams therefore not requiring the 2x12 beam deptt,, No changes to the in:stalled stair framing is required. Thank you for Mlecting CTLITHOMPSON for your engine.erlng needs. When we can be of cldditiDhal seNice, ple-ase contact the undersigne.d. Very tr'Uly yours, CTLITHOMPSON, INC. Devin Hougard, P.E. Pro1ect Engineer 400 No rth LinJ< Lane I Fort Coll ins •. Colorado 80524 Telephone: 970-,206-9455 Fa x: 970-206-944\