Loading...
HomeMy WebLinkAbout1005 W HORSETOOTH RD - PERMITS - 3/25/2021Owner:SC PVP HOLDINGS LLC 7385 GREENDALE RD #104 WINDSOR,CO 80550 Phone:970-223-4593 Zoning:Front setback:Rear setback:Right setback:Left setback: Minor Amend #:Plat File #:ZBA Case #: Zoning district:NC -NEIGHBORHOOD COMMERCIAL DISTRICT Legal:Subdivision/PUD:Filing #:Lot #:Block #: Code:Res sq ft:0 Com sq ft:Ind sq ft:Basement sq ft: #of stories:Occ Group:Const Type: Fire Sprklr:Stock plan #:Stock plan options: Contractor:AARCO WIRELESS &ELECTRICAL SOLUTIONS 4650 Dahlia St. Denver,CO 80216 License #:WTS-45 Phone:303-467-6872 Supervisor cert #:3937-WTS Subcontractor(s)Phone License Number Electrical:AARCO WIRELESS AND ELECTRI 720-447-7046 ME-1771 WTS:AARCO WIRELESS &ELECTRICA 303-467-6872 WTS-45 Work Description:AT&T:Tower:Replace 6 antennas,12 coax cables and antenna Shrouds.Remove 3 additional antennas.Ground: Replace 6 radios and DC power rack.Add 3 radios and surge suppressor.Remove battery rack.Job Contact:Kenneth Kelly 303-467-6872 SCHEDULE INSPECTIONS:**via Text Message:888-406-6394 **By Phone:970-221-6769 **Online Portal:fcgov.com/CitizenAccess **Online Portal via Mobile Device:fcgov.com/CitizenAccess/mobile Possible Inspections Required:205 102 402 207 101 202 401 100 303 206 105 104 203 201 200 204 301 300 302 103 400 TOTAL FEES PAID AS OF 03/25/21:$1,185.25 Payment method:Credit Card 8079 **Fee Detail Displayed on Next Page As a condition for the issuance of a permit,I hereby declare that I am the owner or owner's agent,authorized to perform the proposed work on the property described herein. I agree to comply with all the requirements contained herein,and City ordinances,and State laws associated with such work.I understand that such permit may be revoked in the event that issuance was based on incorrect information.This permit shall become null and void if the work authorized by such permit is not commenced, suspended,abandoned or not inspected within 180 days from the date of such permit. Community Development &Neighborhood Services 281 N.College Ave Fort Collins,CO 80522 970.221.6760 970.224.6134 -fax Building Permit #:B2100816 Issued Full:03/25/2021 Permit Type:Com,Ind or Mixed Use Alteration Site Address:1005 W HORSETOOTH RD Job Valuation:$25,000.00 Category:WTS/Telecommunications Signature:Print Name:Date: Form Revised Oct 2010 Transactions Method Check Number Date Paid Amount Paid Comments Credit Card CK #8079 03/25/2021 $988.95 Credit Card CK #8079 02/03/2021 $196.30 Receipt issued:03/25/2021 Total Paid to Date:$1,185.25 Fee Description Account Code Fee Amount Amount Paid Date Paid Amount Due Building Permit Fee w/Subs 1000.422010 $407.70 $407.70 03/25/2021 $0.00 City Sales/Use Tax 251.122030 $481.25 $481.25 03/25/2021 $0.00 County Sales/Use Tax 100.217030 $100.00 $100.00 03/25/2021 $0.00 Plan Check Fee 1000.444010 $196.30 $196.30 02/03/2021 $0.00 TOTAL FEES:$1,185.25 $1,185.25 $0.00 TOTAL BALANCE DUE AS OF 03/25/2021:$0.00 Community Development &Neighborhood Services 281 N.College Ave Fort Collins,CO 80522 970.221.6760 970.224.6134 -fax Building Permit #:B2100816 Issued Full:03/25/2021 Permit Type:Com,Ind or Mixed Use Alteration Site Address:1005 W HORSETOOTH RD Job Valuation:$25,000.00 Category:WTS/Telecommunications Fee Amounts are valid for date of this document only.Fees subject to change without notice. Form Revised Oct 2010 B2100816 02.04.2021 B2100816 1505 Westlake Ave N, Seattle, WA 98109 Phone: (503) 708 -9200 www.crowncastle.com January 29, 2021 City of Fort Collins Building Department 281 N. College Ave., Po Box 580 Fort Collins, Co 80522-0580 Via Electronic Submittal **********NOTICE OF ELIGIBLE FACILITIES REQUEST********** RE: Request for Minor Modification to Existing Wireless Facility – Section 6409 Site Address: 1005 WEST HORSETOOTH, FORT COLLINS, CO 80526 Crown Site Number: 857499 / Crown Site Name: HORSETOOTH AND TAFT Customer Site Number: COL03090 / Application Number: 521146 Dear Building Staff: On behalf of AT&T Mobility (“Applicant”), Crown Castle USA Inc. (“Crown Castle”) is pleased to submit this request to modify the existing wireless facility noted above through the collocation, replacement and/or removal of the Applicant’s equipment as an eligible facilities request for a minor modification under Section 64091 and the rules of the Federal Communications Commission (“FCC”).2 Section 6409 mandates that state and local governments must approve any eligible facilities request for the modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station. If a state or local government, fails to issue any approvals required for this request within 60 days, these approvals are deemed granted. The FCC has clarified that the 60 day deadline begins when an applicant: (1) takes the first step required under state or local law; and (2) submits information sufficient to inform the jurisdiction that this modification qualifies under the federal law. Please note that with the submission of this letter and enclosed items, the sixty day review period has started. Based on this filing, the deadline for issuance of approval is March 30, 2021. 1 Middle Class Tax Relief and Job Creation Act of 2012, Pub. L. No. 112 -96, § 6409 (2012) (codified at 47 U.S.C. § 1455). 2 Acceleration of Broadband Deployment by Improving Wireless Facility Siting Policies, 29 FCC Rcd. 12865 (2014) (codified at 47 CFR § 1.6100); and Implementation of State & Local Governments’ Obligation to Approve Certain Wireless Facility Modification Requests Under Section 6409(a) of the Spectrum Act of 2012, WT Docket No. 19-250 (June 10, 2020). 857499 - 1005 WEST HORSETOOTH, FORT COLLINS, CO 80526 The proposed scope of work for this project includes: Add or replace antennas, ancillary equipment and ground equipment as per plans for an existing carrier on an existing wireless communication facility. No tower height extension or compound expansion proposed. At the end of this letter is a checklist of the applicable substantial change criteria under Section 6409. Additionally, please find enclosed the following information in support of this request: (1) Building Permit Application; (2) Construction Drawings; (3) Structural Analysis; and (4) Section 6409 Substantial Change Checklist. As these documents indicate, (i) the modification involves the collocation, removal or replacement of transmission equipment; and (ii) such modification will not substantially change the physical dimensions of such tower or base station. As such, it is an “eligible facilities request” as defined in the FCC’s rules to which the 60 day deadline for approval applies. Accordingly, Applicant requests all authorization necessary for this proposed minor modification under Section 6409. Our goal is to work with you to obtain approvals earlier than the deadline. We will respond promptly to any request for related information you may have in connection with this request. Please let us know how we can work with you to expedite the approval process. We look forward to working with you on this important project, which will improve wireless telecommunication services in your community using collocation on existing infrastructure. If you have any questions, please do not hesitate to contact me. Regards, Zach Phillips Site Acquisition Specialist Crown Castle Agent for Applicant (503) 708-9200 Zach.Phillips@crowncastle.com 857499 - 1005 WEST HORSETOOTH, FORT COLLINS, CO 80526 Section 6409 Substantial Change Checklist Towers Outside of the Public Right of Way The Federal Communications Commission has determined that a modification substantially changes the physical dimension of a wireless tower or base station under 47 U.S.C. § 1455(a) if it meets one of six enumerated criteria under 47 C.F.R. § 1.6100. Criteria for Towers Outside the Public Rights of Way YES/NO NO Does the modification increase the height of the tower by more than the greater of: (a) 10%; or (b) the height of an additional antenna array plus separation of up to 20 feet from the top of the nearest existing antenna? YES/NO NO Does the modification add an appurtenance to the body of the tower that would protrude from the edge of the tower more than 20 feet or more than the width of the tower structure at the level of the appurtenance, whichever is greater? YES/NO NO Does the modification involve the installation of more than the standard number of new equipment cabinets for the technology involved or add more than four new equipment cabinets? YES/NO NO Does the modification entail any excavation or deployment outside the current site by more than 30 feet in any direction, not including any access or utility easements? YES/NO NO Does the modification defeat the concealment elements of the eligible support structure? YES/NO NO Does the modification violate conditions associated with the siting approval with the prior approval the tower or base station other than as specified in 47 C.F.R. § 1.6100(c)(7)(i) – (iv)? If all questions in the above are area answered “NO,” then the modification does not constitute a substantial change to the existing tower under 47 C.F.R. § 1.6100.