HomeMy WebLinkAbout1050 HOBBIT ST - R - SPECIAL INSPECTIONS - 2/16/2021
Soilogic, Inc.
3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144
February 16, 2021
ARCO Construction Company
9494 Manchester Road
St. Louis, Missouri 63119
Attn: Mr. Patrick Hagen
Re: Construction Materials Testing and Observation Services Report
Landmark Apartments Building R
Fort Collins, Colorado
Soilogic #20-2026
Mr. Hagen:
During the period, June 25 through July 22, 2020, Soilogic Inc. (Soilogic) provided
construction materials testing and observation services for the referenced project. Our
services were provided on a part-time basis and included reinforcing steel observations and
the observation and testing concrete delivered to the site for placement. Results of the
observation and testing services completed during the referenced period are included with
this report.
On June 25, 2020, a Soilogic field engineer observed the footing areas and concrete forms
placed for the footing foundations for the Building R prior to concrete placement. The
verification of void form placement was also completed at that time. At the time of our
site visit, the footing areas and concrete void forms observed appeared to have been placed
in general compliance with the provided construction plans (Infusion Architects LLS,
Plan# LSD2277).
On July 2, 2020, a Soilogic field engineer observed the reinforcing steel placed for the
foundation walls for the Building R prior to concrete placement. At the time of our site
visit, the reinforcing steel observed appeared to have been placed in substantial compliance
with the provided construction plans (Infusion Architects LLS, Plan# LSD2277).
Construction Materials Testing and Observation Services Report
Landmark Apartments Building R
Fort Collins, Colorado
Soilogic #20-2026
2
On July 2 2020, a Soilogic field engineer observed the grounding (UFER) steel for the
Building R prior to concrete placement. Three (3) #5 rebar was observed to be installed
within the foundation wall forms and extending out of the forms in the north east and north
west corners of the building.
During the referenced period, Soilogic personnel observed and tested cast-in-place
concrete delivered to the site for construction of footings, foundation walls and floor slabs.
The testing completed in the field included slump, air content, unit weight, concrete
temperature, and ambient air temperature at the time of placement. Test cylinders were
molded from representative samples of the plastic concrete for laboratory curing and
compressive strength testing. Results of the field and laboratory tests performed during
the referenced period are included with this report. Results of laboratory concrete
compressive strength tests completed during the referenced period are also included and
will be provided as they become available.
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further assistance to you
in any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc.
Jason Horner, P.E.
Project Engineer
4 of 44
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56
20-2026
Summary of Cast-In-Place Concrete Test
LANDMARK APARTMENTSFort Collins, Colorado
General
Set #8 Application
Location 20' N of SE Corner Mix Code 36NK22B46
Building D Footing
Placement Date 6/25/20 Supplier Burnco
1131
Sample Time 11:00 AM Water Added On Site 3 Gallons
Placement Type Chute Ticket #20277338
Batch Time 9:27 AM Truck #
Sampled At (yards)Field Personnel JG
Project Specifications and Test Results
Test Specifications Results
Slump (in) ASTM C-143 3" - 5"4"
Air Content (%)ASTM C-231 5.0% - 8.0%5.0%
Unit Weight (pcf)Field -145.8
Air Temperature @ Time of Placement -73 °F
Concrete Temperature ASTM C-1064 90˚ Max 80 °F
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min)3,000 psi See Below
-
41575 Cone/Shear 3308 346045425Cone/Shear 3615
Load (lbs)Failure Type (psi)(psi)
------
3430 374050835Cone/Shear 4045
-------
43105 Cone/Shear
-
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
------
4 of 70
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56
20-2026
Summary of Cast-In-Place Concrete Test
LANDMARK APARTMENTSFort Collins, Colorado
General
Set #11 Application
Location 18' S of NW Corner Mix Code 30VL2166G
Building D Foundation Walls
Placement Date 7/2/20 Supplier Burnco
1280
Sample Time 2:35 PM Water Added On Site 5 Gallons
Placement Type Pump Ticket #20279524
Batch Time 1:26 PM Truck #
Sampled At (yards)Field Personnel JG
Project Specifications and Test Results
Test Specifications Results
Slump (in) ASTM C-143 3" - 5"5 1/2"
Air Content (%)ASTM C-231 5.0% - 8.0%7.0%
Unit Weight (pcf)Field -142.0
Air Temperature @ Time of Placement -88 °F
Concrete Temperature ASTM C-1064 90˚ Max 79 °F
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min)3,000 psi See Below
-
43825 Cone/Shear 3487 322037005Cone/Shear 2945
Load (lbs)Failure Type (psi)(psi)
------
4453 450057130Cone/Shear 4546
-------
55955 Cone/Shear
-
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
------
-of -
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56
20-2026
Summary of Cast-In-Place Concrete Test
LANDMARK APARTMENTSFort Collins, Colorado
General
Set #18 Application
Location 10' S by 10' W of NE Corner Mix Code 35VK20B4G
Building D Floor Slab
Placement Date 7/22/20 Supplier Burnco
-
Sample Time -Water Added On Site -
Placement Type Pump Ticket #-
Batch Time -Truck #
Sampled At (yards)Field Personnel JG
Project Specifications and Test Results
Test Specifications Results
Slump (in) ASTM C-143 3" - 5"4 1/2"
Air Content (%)ASTM C-231 1.0% - 3.0%1.7%
Unit Weight (pcf)Field -151.2
Air Temperature @ Time of Placement -68 °F
Concrete Temperature ASTM C-1064 90˚ Max 72 °F
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min)4,000 psi See Below
-
44035 Cone/Shear 3504 369048720Cone/Shear 3877
Load (lbs)Failure Type (psi)(psi)
------
5430 542067915Cone/Shear 5405
-------
68235 Cone/Shear
-
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
------