Loading...
HomeMy WebLinkAbout1115 PARKWOOD DR - PERMITS - 3/3/2021Owner:YATES DE ETTE 1115 PARKWOOD DR FORT COLLINS,CO 80525-1928 Phone:801-783-9931 Zoning:Front setback:Rear setback:Right setback:Left setback: Minor Amend #:Plat File #:ZBA Case #: Zoning district:RL -LOW DENSITY RESIDENTIAL DISTRICT Legal:Subdivision/PUD:Filing #:Lot #:Block #: Code:Res sq ft:Com sq ft:Ind sq ft:Basement sq ft: #of stories:Occ Group:Const Type: Fire Sprklr:Stock plan #:Stock plan options: Contractor:FYRE PRO INC 5332 S TIMBERLINE RD FORT COLLINS,CO 80528 License #:H-1088 Phone:970-213-7962 Supervisor cert #: Subcontractor(s)Phone License Number Mechanical:FYRE PRO INC 970-213-7962 H-1088 Work Description:Remove existing gas log and replace with new gas using existing gas line. SCHEDULE INSPECTIONS:**via Text Message:888-406-6394 **By Phone:970-221-6769 **Online Portal:fcgov.com/CitizenAccess **Online Portal via Mobile Device:fcgov.com/CitizenAccess/mobile Possible Inspections Required:406 204 TOTAL FEES PAID AS OF 03/03/21:$183.57 Payment method:Credit Card 6208 **Fee Detail Displayed on Next Page As a condition for the issuance of a permit,I hereby declare that I am the owner or owner's agent,authorized to perform the proposed work on the property described herein. I agree to comply with all the requirements contained herein,and City ordinances,and State laws associated with such work.I understand that such permit may be revoked in the event that issuance was based on incorrect information.This permit shall become null and void if the work authorized by such permit is not commenced, suspended,abandoned or not inspected within 180 days from the date of such permit. Carbon Monoxide Alarm required within 15 feet of each bedroom entrance. Community Development &Neighborhood Services 281 N.College Ave Fort Collins,CO 80522 970.221.6760 970.224.6134 -fax Building Permit #:B2101569 Issued Full:03/03/2021 Permit Type:Residential Gas Log Site Address:1115 PARKWOOD DR Job Valuation:$5,100.00 Category:Residential Signature:Print Name:Date: Form Revised Oct 2010 Transactions Method Check Number Date Paid Amount Paid Comments Credit Card CK #6208 03/03/2021 $183.57 Receipt issued:03/03/2021 Total Paid to Date:$183.57 Fee Description Account Code Fee Amount Amount Paid Date Paid Amount Due City Sales/Use Tax 251.122030 $98.17 $98.17 03/03/2021 $0.00 County Sales/Use Tax 100.217030 $20.40 $20.40 03/03/2021 $0.00 Permit Flat Fee -$65 1000.422010 $65.00 $65.00 03/03/2021 $0.00 TOTAL FEES:$183.57 $183.57 $0.00 TOTAL BALANCE DUE AS OF 03/03/2021:$0.00 Community Development &Neighborhood Services 281 N.College Ave Fort Collins,CO 80522 970.221.6760 970.224.6134 -fax Building Permit #:B2101569 Issued Full:03/03/2021 Permit Type:Residential Gas Log Site Address:1115 PARKWOOD DR Job Valuation:$5,100.00 Category:Residential Fee Amounts are valid for date of this document only.Fees subject to change without notice. Form Revised Oct 2010 Building Permit Over the Counter Application 2. 1. Job site address: 1115 Parkwood Dr 2. Property owner name: DeEtte Yates 3. Property owner address: Street Address: : 1115 Parkwood Dr City: : Fort Collins State: : CO Zip: : 80525 4. Property owner phone number: 801-783-9931 5. Project type: Residential 6. What type of residential? Single Family Detached 7. Value of work (Labor and Materials)($): 5100.00 8. Type of permit: Gas/Wood Burning Appliances 9. Scope of work: Gas Fireplace 10. Length of extensions of gas line (if necessary): 11. Contractor name: FyrePro Inc. 12. Contractor address: 5332 S Timberline Rd 13. Contractor phone number: 970-213-7962 14. Contractor email: cat@fyrepro.com 15. License number: H1088 16. Certificate number: 1841-H 17. Subcontractor license (if applicable): 18. Subcontractor name (if applicable): 19. Additional information if applicable: Remove existing gas log set & replace with new gas insert with gas line already in place. 3. Review 03.03.2021 B2101569 20. I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit is not valid until it has been paid and issued. Signature of: Jamie Pfau Date Signed: 03/01/2021 21. Please include an email address to receive a confirmation and a copy of your answers. jamie@fyrepro.com 4. Thank You! Thank you for submitting your application for processing. To submit another over the counter application, click here.