Loading...
HomeMy WebLinkAbout1015 S TAFT HILL RD - SPECIAL INSPECTIONS - 10/13/2020tnxTower Report - version 8.0.7.5 Date: October 13, 2020 Lauren Brown Crown Castle Crown Castle 2000 Corporate Drive 2055 S Stearman Dr Canonsburg, PA 15317 Chandler, AZ 85286 (724) 416-2000 Subject:Structural Modification Report Carrier Designation: AT&T Mobility Co-Locate Carrier Site Number:COL03025 Carrier Site Name: TAFT AND ELIZABETH Crown Castle Designation: Crown Castle BU Number:856479 Crown Castle Site Name: TAFT AND ELIZABETH Crown Castle JDE Job Number:610417 Crown Castle Work Order Number:1887900 Crown Castle Order Number: 521148 Rev. 4 Engineering Firm Designation: Crown Castle Project Number:1887900 Site Data: 1015 SOUTH TAFT HILL ROAD, FORT COLLINS, Larimer County, CO Latitude 40° 34' 22'', Longitude -105° 6' 57'' 47 Foot - Monopole Tower Dear Lauren Brown, Crown Castle is pleased to submit this “Structural Modification Report” to determine the structural integrity of the above mentioned tower. The purpose of the analysis is to determine acceptability of the tower stress level including the proposed modifications as outlined in the attached drawings, "Appendix D". Based on our analysis we have determined the tower stress level for the structure and foundation, under the following load case, to be: LC4: Modified Structure w/ Proposed Equipment Configuration Sufficient Capacity This analysis has been performed in accordance with the 2018 International Building Code based upon an ultimate 3-second gust wind speed of 140 mph. Applicable Standard references and design criteria are listed in Section 2 - Analysis Criteria. Structural analysis prepared by: Matthew Schmitt / MEB Respectfully submitted by: Maged (Matthew) Abdel-Messih, P.E. Senior Project Engineer 10/13/2020 B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 2 tnxTower Report - version 8.0.7.5 TABLE OF CONTENTS 1) INTRODUCTION 2) ANALYSIS CRITERIA Table 1 - Proposed Equipment Configuration 3) ANALYSIS PROCEDURE Table 2 - Documents Provided 3.1) Analysis Method 3.2) Assumptions 4) ANALYSIS RESULTS Table 3 - Section Capacity (Summary) Table 4 – Tower Component Stresses vs. Capacity - LC4 4.1) Recommendations 5) APPENDIX A tnxTower Output 6) APPENDIX B Base Level Drawing 7) APPENDIX C Additional Calculations 8) APPENDIX D Required Modification Drawings B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 3 tnxTower Report - version 8.0.7.5 1) INTRODUCTION This tower is a 47 ft Concealment tower designed by Wireless Structures Consulting and mapped by TEP. The modification drawings designed by CCI and attached in Appendix D, have been considered in this analysis. 2) ANALYSIS CRITERIA TIA-222 Revision: TIA-222-H Risk Category: II Wind Speed: 140 mph Exposure Category: B Topographic Factor: 1 Service Wind Speed: 60 mph Table 1 - Proposed Equipment Configuration Mounting Level (ft) Center Line Elevation (ft) Number of Antennas Antenna Manufacturer Antenna Model Number of Feed Lines Feed Line Size (in) 42.0 42.0 3 commscope NNH4-65C-R6N17 w/ Mount Pipe 12 1 3 1/2 5/16 1/4 41.5 41.5 1 - 11’ x 42” OD Concealment Canister - - 34.0 32.0 3 commscope NNH4-65C-R6N17 w/ Mount Pipe 12 1/2 30.5 30.5 1 - 11’ x 42” OD Concealment Canister - - 3) ANALYSIS PROCEDURE Table 2 - Documents Provided Document Remarks Reference Source 4-GEOTECHNICAL REPORTS Terracon 4308085 CCISITES 4-TOWER FOUNDATION DRAWINGS/DESIGN/SPECS Radian 4308084 CCISITES 4-TOWER MANUFACTURER DRAWINGS Wiresless Structures Consulting 4308087 CCISITES 4-TOWER REINFORCEMENT DESIGN/DRAWINGS/DATA Crown Castle Appendix D ON FILE 3.1) Analysis Method tnxTower (version 8.0.7.5), a commercially available analysis software package, was used to create a three-dimensional model of the tower and calculate member stresses for various loading cases. Selected output from the analysis is included in Appendix A. When applicable, Crown Castle has calculated and provided the effective area for panel antennas using approved methods following the intent of the TIA-222 Standard. B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 4 tnxTower Report - version 8.0.7.5 3.2) Assumptions 1) Tower and structures were maintained in accordance with the TIA-222 Standard. 2) The configuration of antennas, transmission cables, mounts and other appurtenances are as specified in Tables 1 and 2 and the referenced drawings. This analysis may be affected if any assumptions are not valid or have been made in error. Crown Castle should be notified to determine the effect on the structural integrity of the tower. 4) ANALYSIS RESULTS Table 3 - Section Capacity (Summary) Section No. Elevation (ft) Component Type Size Critical Element P (K) SF*P_allow (K) % Capacity Pass / Fail L1 47 - 25 Pole TP3.5x3.5x1.75 1 -2.70 454.60 52.3 Pass L2 25 - 0 Pole TP18x18x0.25 2 -4.66 461.09 24.8 Pass Summary Pole (L1) 52.3 Pass Rating = 52.3 Pass Table 4 - Tower Component Stresses vs. Capacity - LC4 Notes Component Elevation (ft) % Capacity Pass / Fail 1 Flange Bolts 25 20.9 Pass 1 Flange Plate 25 <75 Pass 1 Anchor Rods 0 25.5 Pass 1 Base Plate 0 35.2 Pass 1 Base Foundation Structure 0 6.2 Pass 1 Base Foundation Soil Interaction 0 19.2 Pass Structure Rating (max from all components) = <75% Notes: 1) See additional documentation in “Appendix C – Additional Calculations” for calculations supporting the % capacity consumed. 4.1) Recommendations Perform the modifications detailed in "Appendix D" to remedy the deficiencies identified in Crown Castle Work Order No. 1885767. B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 5 tnxTower Report - version 8.0.7.5 APPENDIX A TNXTOWER OUTPUT B2100722 The Foundation for a Wireless World Crown Castle 2000 Corporate Drive Canonsburg, PA 15317 Phone: (724) 416-2000 FAX: Job: BU# 856479 Project: Client: Drawn by: Matthew Schmitt App'd: Code: TIA-222-H Date: 09/30/20 Scale: NTS Path: R:\Modification Design\Work Area\2020\10 October\856479 WO 1887900\Working\Production\856479.eri Dwg No. E-1 47.0 ft 25.0 ft 0.0 ft REACTIONS - 140 mph WIND 2 K SHEAR 49 kip-ft MOMENT 5 K AXIAL ARE FACTORED ALL REACTIONS Section12 Length (ft)22.0025.00 Number of Sides00 Thickness (in)1.75000.2500 Top Dia (in)3.500018.0000 Bot Dia (in)3.500018.0000 GradeA572-50A53-B-35 Weight (K)0.71.21.9MATERIAL STRENGTH GRADE GRADEFy FyFu Fu A572-50 50 ksi 65 ksi A53-B-35 35 ksi 60 ksi TOWER DESIGN NOTES 1. Tower designed for Exposure B to the TIA-222-H Standard. 2. Tower designed for a 140 mph basic wind in accordance with the TIA-222-H Standard. 3. Deflections are based upon a 60 mph wind. 4. Tower Risk Category II. 5. Topographic Category 1 with Crest Height of 0.00 ft 6. TOWER RATING: 52.3% B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 6 tnxTower Report - version 8.0.7.5 Tower Input Data The tower is a monopole. This tower is designed using the TIA-222-H standard. The following design criteria apply: 3) Tower base elevation above sea level: 5077.00 ft. 4) Basic wind speed of 140 mph. 5) Risk Category II. 6) Exposure Category B. 7) Simplified Topographic Factor Procedure for wind speed-up calculations is used. 8) Topographic Category: 1. 9) Crest Height: 0.00 ft. 10) Deflections calculated using a wind speed of 60 mph. 11) A non-linear (P-delta) analysis was used. 12) Pressures are calculated at each section. 13) Stress ratio used in pole design is 1.05. 14) Tower analysis based on target reliabilities in accordance with Annex S. 15) Load Modification Factors used: Kes(Fw) = 0.95. 16) Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered. Options Consider Moments - Legs Distribute Leg Loads As Uniform Use ASCE 10 X-Brace Ly Rules Consider Moments - Horizontals Assume Legs Pinned Calculate Redundant Bracing Forces Consider Moments - Diagonals √ Assume Rigid Index Plate Ignore Redundant Members in FEA Use Moment Magnification √ Use Clear Spans For Wind Area SR Leg Bolts Resist Compression Use Code Stress Ratios Use Clear Spans For KL/r All Leg Panels Have Same Allowable √ Use Code Safety Factors - Guys Retension Guys To Initial Tension Offset Girt At Foundation Escalate Ice √ Bypass Mast Stability Checks √ Consider Feed Line Torque Always Use Max Kz √ Use Azimuth Dish Coefficients Include Angle Block Shear Check Use Special Wind Profile √ Project Wind Area of Appurt. Use TIA-222-H Bracing Resist. Exemption Include Bolts In Member Capacity Autocalc Torque Arm Areas Use TIA-222-H Tension Splice Exemption Leg Bolts Are At Top Of Section Add IBC .6D+W Combination Poles Secondary Horizontal Braces Leg √ Sort Capacity Reports By Component √ Include Shear-Torsion Interaction Use Diamond Inner Bracing (4 Sided) Triangulate Diamond Inner Bracing Always Use Sub-Critical Flow SR Members Have Cut Ends Treat Feed Line Bundles As Cylinder Use Top Mounted Sockets SR Members Are Concentric Ignore KL/ry For 60 Deg. Angle Legs √ Pole Without Linear Attachments √ Pole With Shroud Or No Appurtenances Outside and Inside Corner Radii Are Known Tapered Pole Section Geometry Section Elevation ft Section Length ft Splice Length ft Number of Sides Top Diameter in Bottom Diameter in Wall Thickness in Bend Radius in Pole Grade L1 47.00-25.00 22.00 0.00 Round 3.5000 3.5000 1.7500 A572-50 (50 ksi) L2 25.00-0.00 25.00 Round 18.0000 18.0000 0.2500 A53-B-35 (35 ksi) B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 7 tnxTower Report - version 8.0.7.5 Tapered Pole Properties Section Tip Dia. in Area in2 I in4 r in C in I/C in3 J in4 It/Q in2 w in w/t L1 3.5000 9.6211 7.3662 0.8750 1.7500 4.2092 14.7324 4.8077 0.0000 0 3.5000 9.6211 7.3662 0.8750 1.7500 4.2092 14.7324 4.8077 0.0000 0 L2 18.0000 13.9408 549.1375 6.2762 9.0000 61.0153 1098.2750 6.9662 0.0000 0 18.0000 13.9408 549.1375 6.2762 9.0000 61.0153 1098.2750 6.9662 0.0000 0 Tower Elevation ft Gusset Area (per face) ft2 Gusset Thickness in Gusset Grade Adjust. Factor Af Adjust. Factor Ar Weight Mult. Double Angle Stitch Bolt Spacing Diagonals in Double Angle Stitch Bolt Spacing Horizontals in Double Angle Stitch Bolt Spacing Redundants in L1 47.00- 25.00 1 0 1 L2 25.00-0.00 1 1 1 Feed Line/Linear Appurtenances - Entered As Round Or Flat Description Face or Leg Allow Shield Exclude From Torque Calculation Componen t Type Placement ft Total Number Number Per Row Clear Spacing in Width or Diamete r in Perimete r in Weight plf *** Feed Line/Linear Appurtenances - Entered As Area Description Face or Leg Allow Shield Exclude From Torque Calculation Componen t Type Placement ft Total Number CAAA ft2/ft Weight plf LDF4-50A(1/2'') C No No Inside Pole 42.00 - 0.00 12 No Ice 0.00 0.15 LDF1-50A(1/4'') C No No Inside Pole 42.00 - 0.00 3 No Ice 0.00 0.06 9207(5/16'') C No No Inside Pole 42.00 - 0.00 1 No Ice 0.00 0.60 *** LDF4-50A(1/2'') C No No Inside Pole 34.00 - 0.00 12 No Ice 0.00 0.15 *** *** Feed Line/Linear Appurtenances Section Areas Tower Sectio n Tower Elevation ft Face AR ft2 AF ft2 CAAA In Face ft2 CAAA Out Face ft2 Weight K L1 47.00-25.00 A B C 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.00 0.00 0.06 L2 25.00-0.00 A B C 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.00 0.00 0.11 Feed Line Center of Pressure B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 8 tnxTower Report - version 8.0.7.5 Section Elevation ft CPX in CPZ in CPX Ice in CPZ Ice in L1 47.00-25.00 0.0000 0.0000 0.0000 0.0000 L2 25.00-0.00 0.0000 0.0000 0.0000 0.0000 Note: For pole sections, center of pressure calculations do not consider feed line shielding. Discrete Tower Loads Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustmen t ° Placement ft CAAA Front ft2 CAAA Side ft2 Weight K *** NNH4-65C-R6N17 w/ Mount Pipe A From Leg 0.25 0.00 0.00 0.0000 42.00 No Ice 0.00 0.00 0.15 NNH4-65C-R6N17 w/ Mount Pipe B From Leg 0.25 0.00 0.00 0.0000 42.00 No Ice 0.00 0.00 0.15 NNH4-65C-R6N17 w/ Mount Pipe C From Leg 0.25 0.00 0.00 0.0000 42.00 No Ice 0.00 0.00 0.15 *** NNH4-65C-R6N17 w/ Mount Pipe A From Leg 0.25 0.00 -2.00 0.0000 34.00 No Ice 0.00 0.00 0.15 NNH4-65C-R6N17 w/ Mount Pipe B From Leg 0.25 0.00 -2.00 0.0000 34.00 No Ice 0.00 0.00 0.15 NNH4-65C-R6N17 w/ Mount Pipe C From Leg 0.25 0.00 -2.00 0.0000 34.00 No Ice 0.00 0.00 0.15 *** *** Canister Load1 C None 0.0000 47.00 No Ice 8.66 8.66 0.12 Canister Load2 C None 0.0000 36.00 No Ice 17.32 17.32 0.46 Canister Load3 C None 0.0000 25.00 No Ice 8.66 8.66 0.33 Load Combinations Comb. No. Description 1 Dead Only 2 1.2 Dead+1.0 Wind 0 deg - No Ice 3 0.9 Dead+1.0 Wind 0 deg - No Ice 4 1.2 Dead+1.0 Wind 30 deg - No Ice 5 0.9 Dead+1.0 Wind 30 deg - No Ice 6 1.2 Dead+1.0 Wind 60 deg - No Ice 7 0.9 Dead+1.0 Wind 60 deg - No Ice 8 1.2 Dead+1.0 Wind 90 deg - No Ice 9 0.9 Dead+1.0 Wind 90 deg - No Ice 10 1.2 Dead+1.0 Wind 120 deg - No Ice 11 0.9 Dead+1.0 Wind 120 deg - No Ice 12 1.2 Dead+1.0 Wind 150 deg - No Ice 13 0.9 Dead+1.0 Wind 150 deg - No Ice B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 9 tnxTower Report - version 8.0.7.5 Comb. No. Description 14 1.2 Dead+1.0 Wind 180 deg - No Ice 15 0.9 Dead+1.0 Wind 180 deg - No Ice 16 1.2 Dead+1.0 Wind 210 deg - No Ice 17 0.9 Dead+1.0 Wind 210 deg - No Ice 18 1.2 Dead+1.0 Wind 240 deg - No Ice 19 0.9 Dead+1.0 Wind 240 deg - No Ice 20 1.2 Dead+1.0 Wind 270 deg - No Ice 21 0.9 Dead+1.0 Wind 270 deg - No Ice 22 1.2 Dead+1.0 Wind 300 deg - No Ice 23 0.9 Dead+1.0 Wind 300 deg - No Ice 24 1.2 Dead+1.0 Wind 330 deg - No Ice 25 0.9 Dead+1.0 Wind 330 deg - No Ice 26 Dead+Wind 0 deg - Service 27 Dead+Wind 30 deg - Service 28 Dead+Wind 60 deg - Service 29 Dead+Wind 90 deg - Service 30 Dead+Wind 120 deg - Service 31 Dead+Wind 150 deg - Service 32 Dead+Wind 180 deg - Service 33 Dead+Wind 210 deg - Service 34 Dead+Wind 240 deg - Service 35 Dead+Wind 270 deg - Service 36 Dead+Wind 300 deg - Service 37 Dead+Wind 330 deg - Service Maximum Member Forces Sectio n No. Elevation ft Component Type Condition Gov. Load Comb. Axial K Major Axis Moment kip-ft Minor Axis Moment kip-ft L1 47 - 25 Pole Max Tension 1 0.00 0.00 0.00 Max. Compression 8 -2.70 -14.56 0.00 Max. Mx 8 -2.70 -14.56 0.00 Max. My 2 -2.70 0.00 14.56 Max. Vy 8 1.02 -6.09 0.00 Max. Vx 2 -1.02 0.00 6.09 Max. Torque 7 0.00 L2 25 - 0 Pole Max Tension 1 0.00 0.00 0.00 Max. Compression 2 -4.66 0.00 49.47 Max. Mx 8 -4.66 -49.47 0.00 Max. My 2 -4.66 0.00 49.47 Max. Vy 8 1.64 -49.47 0.00 Max. Vx 2 -1.64 0.00 49.47 Max. Torque 7 0.00 Maximum Reactions Location Condition Gov. Load Comb. Vertical K Horizontal, X K Horizontal, Z K Pole Max. Vert 2 4.66 0.00 1.64 Max. Hx 21 3.49 1.64 0.00 Max. Hz 2 4.66 0.00 1.64 Max. Mx 2 49.47 0.00 1.64 Max. Mz 8 49.47 -1.64 0.00 Max. Torsion 7 0.00 -1.42 0.82 Min. Vert 7 3.49 -1.42 0.82 Min. Hx 8 4.66 -1.64 0.00 Min. Hz 14 4.66 0.00 -1.64 Min. Mx 14 -49.47 0.00 -1.64 Min. Mz 20 -49.47 1.64 0.00 Min. Torsion 11 -0.00 -1.42 -0.82 B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 10 tnxTower Report - version 8.0.7.5 Tower Mast Reaction Summary Load Combination Vertical K Shearx K Shearz K Overturning Moment, Mx kip-ft Overturning Moment, Mz kip-ft Torque kip-ft Dead Only 3.88 0.00 0.00 0.00 0.00 0.00 1.2 Dead+1.0 Wind 0 deg - No Ice 4.66 0.00 -1.64 -49.47 0.00 0.00 0.9 Dead+1.0 Wind 0 deg - No Ice 3.49 0.00 -1.64 -48.87 0.00 0.00 1.2 Dead+1.0 Wind 30 deg - No Ice 4.66 0.82 -1.42 -42.84 -24.74 0.00 0.9 Dead+1.0 Wind 30 deg - No Ice 3.49 0.82 -1.42 -42.32 -24.43 0.00 1.2 Dead+1.0 Wind 60 deg - No Ice 4.66 1.42 -0.82 -24.74 -42.84 -0.00 0.9 Dead+1.0 Wind 60 deg - No Ice 3.49 1.42 -0.82 -24.43 -42.32 -0.00 1.2 Dead+1.0 Wind 90 deg - No Ice 4.66 1.64 0.00 0.00 -49.47 0.00 0.9 Dead+1.0 Wind 90 deg - No Ice 3.49 1.64 0.00 0.00 -48.87 0.00 1.2 Dead+1.0 Wind 120 deg - No Ice 4.66 1.42 0.82 24.74 -42.84 0.00 0.9 Dead+1.0 Wind 120 deg - No Ice 3.49 1.42 0.82 24.43 -42.32 0.00 1.2 Dead+1.0 Wind 150 deg - No Ice 4.66 0.82 1.42 42.84 -24.74 -0.00 0.9 Dead+1.0 Wind 150 deg - No Ice 3.49 0.82 1.42 42.32 -24.43 -0.00 1.2 Dead+1.0 Wind 180 deg - No Ice 4.66 0.00 1.64 49.47 0.00 0.00 0.9 Dead+1.0 Wind 180 deg - No Ice 3.49 0.00 1.64 48.87 0.00 0.00 1.2 Dead+1.0 Wind 210 deg - No Ice 4.66 -0.82 1.42 42.84 24.74 0.00 0.9 Dead+1.0 Wind 210 deg - No Ice 3.49 -0.82 1.42 42.32 24.43 0.00 1.2 Dead+1.0 Wind 240 deg - No Ice 4.66 -1.42 0.82 24.74 42.84 -0.00 0.9 Dead+1.0 Wind 240 deg - No Ice 3.49 -1.42 0.82 24.43 42.32 -0.00 1.2 Dead+1.0 Wind 270 deg - No Ice 4.66 -1.64 0.00 0.00 49.47 0.00 0.9 Dead+1.0 Wind 270 deg - No Ice 3.49 -1.64 0.00 0.00 48.87 0.00 1.2 Dead+1.0 Wind 300 deg - No Ice 4.66 -1.42 -0.82 -24.74 42.84 0.00 0.9 Dead+1.0 Wind 300 deg - No Ice 3.49 -1.42 -0.82 -24.43 42.32 0.00 1.2 Dead+1.0 Wind 330 deg - No Ice 4.66 -0.82 -1.42 -42.84 24.74 -0.00 0.9 Dead+1.0 Wind 330 deg - No Ice 3.49 -0.82 -1.42 -42.32 24.43 -0.00 Dead+Wind 0 deg - Service 3.88 0.00 -0.28 -8.26 0.00 0.00 Dead+Wind 30 deg - Service 3.88 0.14 -0.25 -7.15 -4.13 0.00 Dead+Wind 60 deg - Service 3.88 0.25 -0.14 -4.13 -7.15 -0.00 Dead+Wind 90 deg - Service 3.88 0.28 0.00 0.00 -8.26 0.00 Dead+Wind 120 deg - Service 3.88 0.25 0.14 4.13 -7.15 0.00 Dead+Wind 150 deg - Service 3.88 0.14 0.25 7.15 -4.13 -0.00 Dead+Wind 180 deg - Service 3.88 0.00 0.28 8.26 0.00 0.00 Dead+Wind 210 deg - Service 3.88 -0.14 0.25 7.15 4.13 0.00 Dead+Wind 240 deg - Service 3.88 -0.25 0.14 4.13 7.15 -0.00 Dead+Wind 270 deg - 3.88 -0.28 0.00 0.00 8.26 0.00 B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 11 tnxTower Report - version 8.0.7.5 Load Combination Vertical K Shearx K Shearz K Overturning Moment, Mx kip-ft Overturning Moment, Mz kip-ft Torque kip-ft Service Dead+Wind 300 deg - Service 3.88 -0.25 -0.14 -4.13 7.15 0.00 Dead+Wind 330 deg - Service 3.88 -0.14 -0.25 -7.15 4.13 -0.00 Solution Summary Load Comb. Sum of Applied Forces Sum of Reactions % Error PX K PY K PZ K PX K PY K PZ K 1 0.00 -3.88 0.00 0.00 3.88 0.00 0.000% 2 0.00 -4.66 -1.64 0.00 4.66 1.64 0.000% 3 0.00 -3.49 -1.64 0.00 3.49 1.64 0.000% 4 0.82 -4.66 -1.42 -0.82 4.66 1.42 0.000% 5 0.82 -3.49 -1.42 -0.82 3.49 1.42 0.000% 6 1.42 -4.66 -0.82 -1.42 4.66 0.82 0.000% 7 1.42 -3.49 -0.82 -1.42 3.49 0.82 0.000% 8 1.64 -4.66 0.00 -1.64 4.66 0.00 0.000% 9 1.64 -3.49 0.00 -1.64 3.49 0.00 0.000% 10 1.42 -4.66 0.82 -1.42 4.66 -0.82 0.000% 11 1.42 -3.49 0.82 -1.42 3.49 -0.82 0.000% 12 0.82 -4.66 1.42 -0.82 4.66 -1.42 0.000% 13 0.82 -3.49 1.42 -0.82 3.49 -1.42 0.000% 14 0.00 -4.66 1.64 0.00 4.66 -1.64 0.000% 15 0.00 -3.49 1.64 0.00 3.49 -1.64 0.000% 16 -0.82 -4.66 1.42 0.82 4.66 -1.42 0.000% 17 -0.82 -3.49 1.42 0.82 3.49 -1.42 0.000% 18 -1.42 -4.66 0.82 1.42 4.66 -0.82 0.000% 19 -1.42 -3.49 0.82 1.42 3.49 -0.82 0.000% 20 -1.64 -4.66 0.00 1.64 4.66 0.00 0.000% 21 -1.64 -3.49 0.00 1.64 3.49 0.00 0.000% 22 -1.42 -4.66 -0.82 1.42 4.66 0.82 0.000% 23 -1.42 -3.49 -0.82 1.42 3.49 0.82 0.000% 24 -0.82 -4.66 -1.42 0.82 4.66 1.42 0.000% 25 -0.82 -3.49 -1.42 0.82 3.49 1.42 0.000% 26 0.00 -3.88 -0.28 0.00 3.88 0.28 0.000% 27 0.14 -3.88 -0.25 -0.14 3.88 0.25 0.000% 28 0.25 -3.88 -0.14 -0.25 3.88 0.14 0.000% 29 0.28 -3.88 0.00 -0.28 3.88 0.00 0.000% 30 0.25 -3.88 0.14 -0.25 3.88 -0.14 0.000% 31 0.14 -3.88 0.25 -0.14 3.88 -0.25 0.000% 32 0.00 -3.88 0.28 0.00 3.88 -0.28 0.000% 33 -0.14 -3.88 0.25 0.14 3.88 -0.25 0.000% 34 -0.25 -3.88 0.14 0.25 3.88 -0.14 0.000% 35 -0.28 -3.88 0.00 0.28 3.88 0.00 0.000% 36 -0.25 -3.88 -0.14 0.25 3.88 0.14 0.000% 37 -0.14 -3.88 -0.25 0.14 3.88 0.25 0.000% Non-Linear Convergence Results Load Combination Converged? Number of Cycles Displacement Tolerance Force Tolerance 1 Yes 4 0.00000001 0.00000001 2 Yes 5 0.00000001 0.00060632 3 Yes 5 0.00000001 0.00013005 4 Yes 6 0.00000001 0.00014275 5 Yes 5 0.00000001 0.00054390 6 Yes 6 0.00000001 0.00014275 7 Yes 5 0.00000001 0.00054390 8 Yes 5 0.00000001 0.00060632 9 Yes 5 0.00000001 0.00013005 B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 12 tnxTower Report - version 8.0.7.5 10 Yes 6 0.00000001 0.00014275 11 Yes 5 0.00000001 0.00054390 12 Yes 6 0.00000001 0.00014275 13 Yes 5 0.00000001 0.00054390 14 Yes 5 0.00000001 0.00060632 15 Yes 5 0.00000001 0.00013005 16 Yes 6 0.00000001 0.00014275 17 Yes 5 0.00000001 0.00054390 18 Yes 6 0.00000001 0.00014275 19 Yes 5 0.00000001 0.00054390 20 Yes 5 0.00000001 0.00060632 21 Yes 5 0.00000001 0.00013005 22 Yes 6 0.00000001 0.00014275 23 Yes 5 0.00000001 0.00054390 24 Yes 6 0.00000001 0.00014275 25 Yes 5 0.00000001 0.00054390 26 Yes 4 0.00000001 0.00068228 27 Yes 4 0.00000001 0.00067889 28 Yes 4 0.00000001 0.00067889 29 Yes 4 0.00000001 0.00068228 30 Yes 4 0.00000001 0.00067889 31 Yes 4 0.00000001 0.00067889 32 Yes 4 0.00000001 0.00068228 33 Yes 4 0.00000001 0.00067889 34 Yes 4 0.00000001 0.00067889 35 Yes 4 0.00000001 0.00068228 36 Yes 4 0.00000001 0.00067889 37 Yes 4 0.00000001 0.00067889 Maximum Tower Deflections - Service Wind Section No. Elevation ft Horz. Deflection in Gov. Load Comb. Tilt ° Twist ° L1 47 - 25 3.050 26 0.8307 0.0000 L2 25 - 0 0.206 26 0.0660 0.0000 Critical Deflections and Radius of Curvature - Service Wind Elevation ft Appurtenance Gov. Load Comb. Deflection in Tilt ° Twist ° Radius of Curvature ft 47.00 Canister Load1 26 3.050 0.8307 0.0000 6838 42.00 NNH4-65C-R6N17 w/ Mount Pipe 26 2.269 0.6213 0.0000 6838 36.00 Canister Load2 26 1.394 0.3863 0.0000 3108 34.00 NNH4-65C-R6N17 w/ Mount Pipe 26 1.130 0.3152 0.0000 2630 25.00 Canister Load3 26 0.206 0.0660 0.0000 1673 Maximum Tower Deflections - Design Wind Section No. Elevation ft Horz. Deflection in Gov. Load Comb. Tilt ° Twist ° L1 47 - 25 18.903 2 5.1634 0.0000 L2 25 - 0 1.248 8 0.4013 0.0000 B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 13 tnxTower Report - version 8.0.7.5 Critical Deflections and Radius of Curvature - Design Wind Elevation ft Appurtenance Gov. Load Comb. Deflection in Tilt ° Twist ° Radius of Curvature ft 47.00 Canister Load1 2 18.903 5.1634 0.0000 1109 42.00 NNH4-65C-R6N17 w/ Mount Pipe 2 14.056 3.8587 0.0000 1109 36.00 Canister Load2 2 8.623 2.3954 0.0000 503 34.00 NNH4-65C-R6N17 w/ Mount Pipe 2 6.980 1.9526 0.0000 425 25.00 Canister Load3 8 1.248 0.4013 0.0000 270 Compression Checks Pole Design Data Section No. Elevation ft Size L ft Lu ft Kl/r A in2 Pu K Pn K Ratio Pu Pn L1 47 - 25 (1) TP3.5x3.5x1.75 22.00 0.00 0.0 9.6211 -2.70 432.95 0.006 L2 25 - 0 (2) TP18x18x0.25 25.00 0.00 0.0 13.940 8 -4.66 439.14 0.011 Pole Bending Design Data Section No. Elevation ft Size Mux kip-ft Mnx kip-ft Ratio Mux Mnx Muy kip-ft Mny kip-ft Ratio Muy Mny L1 47 - 25 (1) TP3.5x3.5x1.75 14.56 26.80 0.543 0.00 26.80 0.000 L2 25 - 0 (2) TP18x18x0.25 49.47 198.32 0.249 0.00 198.32 0.000 Pole Shear Design Data Section No. Elevation ft Size Actual Vu K Vn K Ratio Vu Vn Actual Tu kip-ft Tn kip-ft Ratio Tu Tn L1 47 - 25 (1) TP3.5x3.5x1.75 0.89 129.88 0.007 0.00 19.98 0.000 L2 25 - 0 (2) TP18x18x0.25 1.64 131.74 0.012 0.00 205.59 0.000 Pole Interaction Design Data Section No. Elevation ft Ratio Pu Pn Ratio Mux Mnx Ratio Muy Mny Ratio Vu Vn Ratio Tu Tn Comb. Stress Ratio Allow. Stress Ratio Criteria L1 47 - 25 (1) 0.006 0.543 0.000 0.007 0.000 0.550 1.050 4.8.2 L2 25 - 0 (2) 0.011 0.249 0.000 0.012 0.000 0.260 1.050 4.8.2 B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 14 tnxTower Report - version 8.0.7.5 Section Capacity Table Section No. Elevation ft Component Type Size Critical Element P K øPallow K % Capacity Pass Fail L1 47 - 25 Pole TP3.5x3.5x1.75 1 -2.70 454.60 52.3 Pass L2 25 - 0 Pole TP18x18x0.25 2 -4.66 461.09 24.8 Pass Summary Pole (L1) 52.3 Pass RATING = 52.3 Pass B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 15 tnxTower Report - version 8.0.7.5 APPENDIX B BASE LEVEL DRAWING B2100722 B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 16 tnxTower Report - version 8.0.7.5 APPENDIX C ADDITIONAL CALCULATIONS B2100722 X BU#: Site Name: Order #: TIA-222-H 0 in 140 mph Ice Wind Speed (V):50 mph B Topographic Feature:N/A II 47 ft 25 ft 22 22 ft 2 Canister Section Number *: Canister Assembly Length (ft): Canister Assembly Diameter (in): Number of Sides Canister Section Plate Type: Mating Flange Plate Thickness (in)**: Mating Flange Plate Diameter (in): Solidity Ratio Plate Weight (Kip): Canister Weight (Kip) Vent Length (ft): 1 11 42 Round 2 0.38 42 0.75 0.221 0.242 0-0 2 11 42 Round 2 2.00 17.5 0.75 0.205 0.242 0-0 No No 856479.eri (last saved 09/16 1:01 pm) Pole Height Above Base (ft) Section Length (ft) Lap Splice Length (ft)Number of Sides Top Diameter (in) Bottom Diameter (in) Wall Thickness (in) Bend Radius (in) Pole Material Delete 47 22 0 0 3.5 3.5 1.75 n/a A572-50 [x] 25 25 0 0 18 18 0.25 n/a A53-B-35 [x] Canister Loading Apply CFAF at Elevation(z) (ft) CFAF No Ice (ft2) CFAF 1/2" Ice (ft2) CFAF 1" Ice (ft2) CFAF 2" Ice (ft2) CFAF 4" Ice (ft2) Canister Assembly Weight No Ice (Kip) Canister Assembly Weight 1/2" Ice (Kip) Canister Load 1 47 8.663 21.679 22.183 23.192 25.208 0.121 0.264 Tower Information Base Tower Height: Total Canister Length: CCI Flagpole Tool Code Site Data 856479 TAFT AND ELIZABETH 521148 Rev 4 Code: Windspeed (V): Exposure Category: Risk Category: Ice Thickness: Flag on Tower: Total Tower Height: Number of Canister Assembly Sections: Discrete Loads : CFAF for Canister Assembly * Sections are numbered from the top of the tower down ** Mating Flange Plate Thickness at the bottom of canister section Truck Ball on Tower: Geometry : Base Tower + Spine Page 1 of 2 CCIFlagpole Tool (2.2.0)B2100722 Canister Load 2 36 17.325 43.358 44.367 46.383 50.417 0.463 0.748 Canister Load 3 25 8.663 21.679 22.183 23.192 25.208 0.326 0.468 Yes Actual Deflection ***(inches) 2.844 *** Relative deflection under service level wind speed Allowable (3%) Horizontal Spine Deflection (inches) 7.920 3% Spine Deflection Check Sufficient/ Insufficient Sufficient Deflection Check Required:Import Deflection Results Page 2 of 2 CCIFlagpole Tool (2.2.0)B2100722 Monopole Flange Plate Connection *TIA-222-H Section 15.5 Applied Top Plate Data Bottom Plate Data 27" OD x 2" Plate (A572-50; Fy=50 ksi, Fu=65 ksi)27" OD x 1" Plate (A572-50; Fy=50 ksi, Fu=65 ksi) Top Stiffener Data Bottom Stiffener Data (4) 11.5"H x 11.5"W x 0.5"T, Notch: 8.75" horiz. x 0" vert.(8) 9"H x 3.5"W x 0.5"T, Notch: 0.5" plate: Fy= 50 ksi ; weld: Fy= 70 ksi plate: Fy= 50 ksi ; weld: Fy= 70 ksi horiz. weld: 0.375" groove, 45° dbl bevel, 0.3125" fillet horiz. weld: 0.25" groove, 45° dbl bevelFALSE vert. weld: 0.3125" fillet vert. weld: 0.35355" fillet Top Pole Data Bottom Pole Data 3.5" x 0.6" round pole (A53-B-42; Fy=42 ksi, Fu=63 ksi)18" x 0.25" round pole (A53-B-35; Fy=35 ksi, Fu=60 ksi) Max Load (kips)6.60 Allowable (kips)30.06 Stress Rating:20.9%Pass Top Plate Capacity Bottom Plate Capacity 1.12 (Roark's Flexural)5.04 (Roark's Flexural) 45.00 45.00 2.4%Pass 10.7%Pass N/A N/A Top Stiffener Capacity Bottom Stiffener Capacity 27.5%Pass 3.4%Pass 12.7%Pass 2.0%Pass 7.5%Pass 0.8%Pass 17.2%Pass 3.4%Pass 13.2%Pass 4.1%Pass Top Pole Capacity Bottom Pole Capacity 5.5%Pass 1.6%Pass Elevation = 25 ft. Order # 521148 Rev 4 Axial Force (kips) 2.70 BU # 856479 Applied Loads Site Name TAFT AND ELIZABETH Moment (kip-ft) 14.56 Shear Force (kips) 0.89 TIA-222 Revision H Bottom Plate - ExternalTop Plate - External Allowable Stress (ksi):Allowable Stress (ksi): Connection Properties Bolt Data Analysis Results Bolt Capacity Max Stress (ksi):Max Stress (ksi): (4) 3/4" ø bolts (A325 N; Fy=92 ksi, Fu=120 ksi) on 24" BC Stress Rating:Stress Rating: Tension Side Stress Rating:Tension Side Stress Rating: Horizontal Weld:Horizontal Weld: Plate Compression:Plate Compression: Punching Shear:Punching Shear: Vertical Weld:Vertical Weld: Plate Flexure+Shear:Plate Flexure+Shear: Plate Tension+Shear:Plate Tension+Shear: Analysis Date: 10/6/2020CCIplate - Version 3.7.2 B2100722 BU: 856479 Done By: SM Site Name: TAFT AND ELIZABETH Date Completed: 10/11/20 Work Order: 1887900 Finite Element Analysis- 25’ Flange Plate Connection  A finite element analysis was completed on the 25 ft flange plate connection. The purpose of this analysis was to determine the suitability of the tower’s flange plate connection using the corresponding level reactions provided by tnxTower (see Appendix A). A 3D solid model was created of the 25 ft flange plate connection using SpaceClaim. A full analysis was performed of all components of the flange plate connection using ANSYS Structural (version 2020R2). The images illustrate the controlling force direction and stress gradient of the controlling component. Controlling Component: Stiffeners Status: Pass B2100722 BU: 856479 WO: 1887900 Elevation: 25 ft Done By: MSS Checked By: Date: 10/6/2020 Extension Bracket Bolt Analysis TIA Rev. H Description: This sheet is for the design of a bolted connection for a monopole flange attachment. 1. PARAMETERS Flange Elevation: 25 ft 1.1 Loading Information Apply TIA-222-H Section 15.5? Pmax 14.56kipFlange Bolt Force: Flange Bolt Eccentricity:ecc 3in 1.2 Tower Information tshaft 0.25inShaft Thickness: Shaft Fu:Fushaft 60ksi 1.3 Bolt Properties Number of Bolts in Connection Nb 2 Bolt C-C Spacing:Lb 3in Bolt Diameter:Db 0.75in Bolt Hole Diameter:Dh 0.8125in Washer Diameter:Dw 1.46875in Ultimate Strength:Fubolt 120ksi Thread Type: Gross Area:Agb π 4 Db 20.44 in 2 Version 1.5 Page 1 of 3B2100722 BU: 856479 WO: 1887900 Elevation: 25 ft Done By: MSS Checked By: Date: 10/6/2020 2. Bolt Checks Checked to applied loads 2.1 Connection Shear Bolt Shear Resistance Factor:ϕb 0.75[TIA-222-H Section 4.9.6.3] Connection Length Reduction Factor: Rb 1Lb16inif 0.9 16in Lb38inif 0.75 Lb 38inif 1 Allowable Bolt Shear:ϕRnv ϕb 0.625RbFuboltThreadAgb19.88 kip Bolt Shear Capacity:ϕRnv1 ϕRnv Nb Lb38inif ϕRnv 0.833Nb 3in 38inif [AISC 15th Edition Table J3.2 Note (b)] ϕRnv1 19.88 kip Vmax1 Pmax Nb 7.28 kip Capacityshear Vmax1 ϕRnv1 S15Allowable "No"=if Vmax1 ϕRnv1 1 1.05  S15Allowable "Yes"=if 36.62 % 2.2 Connection Tension Due to Shear Number of Bolts Above Neutral Axis:n' floor Nb 2  1 Moment Arm Between Resultant Tensile and Resultant Compressive Force: d m Lb ceil Nb 2  3in Tension Force due to Shear:rut Pmax ecc n' d m14.56 kip Design Tensile Strength:ϕRnt 0.75 0.75Fubolt Agb29.82 kip Capacitytension.eccentric rut ϕRnt S15Allowable "No"=if rut ϕRnt 1 1.05  S15Allowable "Yes"=if 48.83 % Version 1.5 Page 2 of 3B2100722 BU: 856479 WO: 1887900 Elevation: 25 ft Done By: MSS Checked By: Date: 10/6/2020 Combined Shear and Tension Check:[TIA-222-H Section 4.9.6.4] Capacityinteraction Vmax1 ϕRnv1   2 rut ϕRnt   2 S15Allowable "No"=if Vmax1 ϕRnv1   2 rut ϕRnt   2    1 1.05  S15Allowable "Yes"=if    Capacityinteraction 37.25 % 3. Pole/ Shaft Checks 3.1 Shaft Bearing [AISC 15th Ed., Eqs. J3-6a and J3-6c] Minimum Thickness to Bear On:ttshaft 0.25 in Clear Distance from Edge of Hole to Edge of Adjacent Hole:Lc Lb Dh2.19 in Bearing By Tear-out:Rnshaft1 1.2 LctFushaft39.37 kip Bearing By Hole Deformation: Rnshaft2 2.4 DbtFushaft27 kip Bearing Capacity:ϕRnshaft 0.75 min Rnshaft1 Rnshaft220.25 kip Capacityshaft.bearing Vmax1 ϕRnshaft S15Allowable "No"=if Vmax1 ϕRnshaft 1 1.05  S15Allowable "Yes"=if 35.95 % 3.2 Pull-Out Check (through shaft wall)[AISC Design Guide 24 Ch. 3] Reduction Factor:ϕ 0.67 Hollow Member Pull-Out Capacity:ϕRn ϕ 0.6 πDw tFushaft27.82 kip rut 14.56 kip Capacitypullout rut ϕRn S15Allowable "No"=if rut ϕRn 1 1.05  S15Allowable "Yes"=if 52.33 % Version 1.5 Page 3 of 3B2100722 Monopole Base Plate Connection *TIA-222-H Section 15.5 Applied #VALUE! Anchor Rod Data Anchor Rod Summary (units of kips, kip-in) (6) 1" ø bolts (F1554-105 N; Fy=105 ksi, Fu=125 ksi) on 22.125" BC Pu_c = 18.65 φPn_c = 74.22 Stress Rating Vu = 0.27 φVn = 33.4 25.5% Base Plate Data Mu = 0.27 φMn = 15.75 Pass 25" OD x 1" Plate (A36; Fy=36 ksi, Fu=58 ksi) Base Plate Summary Stiffener Data Max Stress (ksi):11.96 (Flexural) N/A Allowable Stress (ksi):32.4 Stress Rating:35.2%Pass Pole Data 18" x 0.25" round pole (A53-B-35; Fy=35 ksi, Fu=60 ksi) 4.66 1.64 Adjusted Pole Reactions BU # 856479 Applied Loads Site Name TAFT AND ELIZABETH Order # 521148 Rev 4 Analysis Considerations Site Info TIA-222 Revision H Grout Considered:No Analysis ResultsConnection Properties Iar (in) 1.5 Moment (kip-ft) 49.47 Axial Force (kips) 4.66 Shear Force (kips) 1.64 Moment (kip-ft) Axial Force (kips) Shear Force (kips) 0.00 Analysis Date: 10/6/2020CCIplate - Version 3.7.2 B2100722 Report File: TIA-222 Revison:Check Pier Capacity only at location of Max Moment?No Tower Type: Soil Lateral Check Compression Uplift Comp.Uplift 5.19 - 49.47 82.67 - 4.66 56.85 - 1.64 1.5%- Soil Vertical Check Compression Uplift Go to Soil Calculations 220.74 - 3 ksi 0.00 - 60 ksi 39.78 - 40 ksi 220.74 - 44.44 - 19.2%- 20 ft Reinforced Concrete Flexure Compression Uplift 0.5 ft 5.27 - 56.85 - 876.98 - 4 ft 6.2%- 27 10 Reinforced Concrete Shear Compression Uplift 9 12.84 - 3 in 7.42 - 5 178.40 - in 4.0%- in *Rating per TIA-222-H Section 15.5 13 # of Layers 5 121 FALSE 1 0 3 3 104 150 0 0 0.000 0.000 0.00 0.00 FALSE 2 3 4 1 104 150 2.505 1.378 1.378 FALSE 3 4 9 5 120 150 2.505 1.378 1.378 FALSE 4 9 13 4 120 150 2.505 1.378 1.378 FALSE 5 13 20 7 57.6 87.6 2.505 1.378 1.378 0 R:\Modification Design\Work Area\2020\10 October\856479 WO 1887900\Working\Production\856479.eri.rtf 6.2%Structural Foundation Rating* Total Capacity (kips)Tie Yield Strength, Fyt: Tie Spacing Critical Depth (ft from TOC) Critical Depth (ft from TOC) 19.2%Soil Interaction Rating* Depth Ext. Above Grade Critical Moment (kip-ft) Critical Moment Capacity Rating* N/A Cohesionless Cohesive Ultimate Skin Friction Uplift Override (ksf) Shear Design Options Check Shear along Depth of Pier: Utilize Shear-Friction Methodology: Critical Shear Capacity Rating* Cohesive Cohesive Cohesive Analysis Results Drilled Pier Foundation BU # : Site Name: Order Number: Monopole Applied Loads Material Properties Pier Design Data H 856479 TAFT AND ELIZABETH 521148 Rev 4 Moment (kip-ft) Axial Force (kips) Shear Force (kips) Concrete Strength, f'c: Dv=0 (ft from TOC) Soil Safety Factor Max Moment (kip-ft) Rating* Skin Friction (kips) Weight of Concrete (kips) Rating* Calculated Ultimate Skin Friction Uplift (ksf) Calculated Ultimate Skin Friction Comp (ksf) Layer Top (ft) Bottom (ft) Thickness (ft) Ultimate Skin Friction Comp Override (ksf) Groundwater Depth Soil Profile Soil TypeSPT Blow Count Ult. Gross Bearing Capacity (ksf) γsoil (pcf) γconcrete (pcf) Cohesion (ksf) Angle of Friction (degrees) From 0.5' above grade to 20' below grade Rebar Size Clear Cover to Ties Tie Size Rebar Quantity Rebar Cage Diameter Rebar Strength, Fy: End Bearing (kips) Axial (kips) Pier Section 1 Check Limitation Apply TIA-222-H Section 15.5: Pier Diameter Rebar Quantity Rebar Size Critical Shear (kip) Rebar & Pier Options Embedded Pole Inputs Belled Pier Inputs Version 4.1.2 B2100722 ASCE 7 Hazards Report Address: No Address at This Location Standard:ASCE/SEI 7-16 Risk Category:II Soil Class:D - Default (see Section 11.4.3) Elevation:5077.3 ft (NAVD 88) Latitude: Longitude: 40.572778 -105.115833 Page 1 of 3https://asce7hazardtool.online/Wed Sep 30 2020B2100722 SS : 0.202 S1 : 0.057 F a : 1.6 F v : 2.4 SMS : 0.323 SM1 : 0.137 SDS : 0.216 SD1 : 0.091 T L : 4 PGA : 0.108 PGA M : 0.171 F PGA : 1.584 Ie : 1 C v : 0.704 Design Response Spectrum S (g) vs T(s)a MCE Response SpectrumR S (g) vs T(s)a Design Vertical Response Spectrum S (g) vs T(s)a MCE Vertical Response SpectrumR S (g) vs T(s)a Seismic Site Soil Class: Results: Seismic Design Category D - Default (see Section 11.4.3) B Data Accessed: Date Source: Wed Sep 30 2020 USGS Seismic Design Maps based on ASCE/SEI 7-16 and ASCE/SEI 7-16 Table 1.5-2. Additional data for site-specific ground motion procedures in accordance with ASCE/SEI 7-16 Ch. 21 are available from USGS. Page 2 of 3https://asce7hazardtool.online/Wed Sep 30 2020B2100722 Ice Results: Data Source: Date Accessed: Ice Thickness: 0.25 in. Concurrent Temperature: 5 F Gust Speed: 50 mph Standard ASCE/SEI 7-16, Figs. 10-2 through 10-8 Wed Sep 30 2020 Ice thicknesses on structures in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may exceed the mapped values. In the mountain west, ice thicknesses may exceed the mapped values in the foothills and passes. However, at elevations above 5,000 ft, freezing rain is unlikely. Values provided are equivalent radial ice thicknesses due to freezing rain with concurrent 3-second gust speeds, for a 500-year mean recurrence interval, and temperatures concurrent with ice thicknesses due to freezing rain. Thicknesses for ice accretions caused by other sources shall be obtained from local meteorological studies. Ice thicknesses in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may exceed the mapped values. The ASCE 7 Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE 7 standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE. ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE 7 standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE 7 Hazard Tool. Page 3 of 3https://asce7hazardtool.online/Wed Sep 30 2020B2100722 October 13, 2020 47 Ft Monopole Tower Structural Analysis CCI BU No 856479 Project Number 1887900, Order 521148, Revision 4 Page 17 tnxTower Report - version 8.0.7.5 APPENDIX D REQUIRED MODIFICATION DRAWINGS B2100722 S-1 TITLE PAGE NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- CODE COMPLIANCE . ATTENTION ALL CONTRACTORS, ANYTIME YOU ACCESS A CROWN SITE FOR ANY REASON YOU ARE TO CALL THE CROWN NOC UPON ARRIVAL AND DEPARTURE, DAILY AT 800-788-7011 SAFETY CLIMB: 'LOOK UP' THE INTEGRITY OF THE WIRE ROPE SAFETY CLIMB SYSTEM SHALL BE CONSIDERED DURING ALL STAGES OF DESIGN, INSTALLATION, AND INSPECTION. TOWER REINFORCEMENTS AND EQUIPMENT INSTALLATIONS SHALL NOT COMPROMISE THE INTEGRITY OR FUNCTIONAL USE OF ANY WIRE ROPE SAFETY CLIMB ON THE STRUCTURE. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO: PINCHING OF THE WIRE ROPE, BENDING OF THE WIRE ROPE FROM ITS SUPPORTS, DIRECT CONTACT OR CLOSE PROXIMITY TO THE WIRE ROPE WHICH MAY CAUSE FRICTIONAL WEAR, OR IMPACT TO THE ANCHORAGE POINTS IN ANY WAY. ANY COMPROMISED SAFETY CLIMB MUST BE REPORTED TO YOUR CROWN POC FOR RESOLUTION, INCLUDING EXISTING CONDITIONS. SITE NAME: TAFT AND ELIZABETH TOWER MODIFICATION DRAWINGS SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA BU NUMBER: 856479 PROJECT CONTACTS: 1. CROWN PROJECT MANAGER RYAN QUINTEL (615) 771-1569 RYAN.QUINTEL@CROWNCASTLE.COM 370 MALLORY STATION ROAD, SUITE 505 FRANKLIN, TN 37067 2. CROWN DESIGN ENGINEER (EOR) MAGED (MATTHEW) ABDEL-MESSIH, P.E. 2000 CORPORATE DRIVE CANONSBURG, PA 15317 (724) 416-9627 EORAPPROVAL@CROWNCASTLE.COM SHEET NUMBER DESCRIPTION S-1 S-2 TITLE PAGE MODIFICATION INSPECTION CHECKLIST S-3 & S-4 S-6 - S-11 POLE MODIFICATION SCHEDULE NOTES S-5 DETAILS DRAWINGS INCLUDED OPS-PRC-10127 CROWN CASTLE CONCEALMENT REINFORCEMENT SOLUTION . HOT WORK INCLUDED NA BASE GRINDING ONLY NA BASE WELDING (AND GRINDING) NA AERIAL GRINDING ONLY NA AERIAL WELDING (AND GRINDING) 0 THIS MODIFICATION DESIGN IS BASED ON THE REQUIREMENTS OF THE TIA-222-H STRUCTURAL STANDARDS FOR STEEL ANTENNA TOWERS AND ANTENNA SUPPORTING STRUCTURES BASED UPON AN ULTIMATE 3-SECOND GUST WIND SPEED OF 140 MPH AS REQUIRED BY THE 2018 IBC, 60 MPH UNDER SERVICE LOADS, EXPOSURE CATEGORY B AND RISK CATEGORY II. TOWER INFORMATION TOWER MAPPED BY / DOC #: TEP / CCISITES DOC # 4859778 TOWER HEIGHT / TYPE: 47 FT MONOPOLE TOWER TOWER LOCATION: LAT 40º 34' 22.00" DATUM: (NAD 1983)LONG -105º 06' 57.00" ELEV 5078.0 FT AMSL STRUCTURAL DESIGN DRAWING: CCI / WO # 1887900 STRUCTURAL ANALYSIS REPORT: CCI / WO # 1885767 STRUCTURAL ANALYSIS DATE: 09/17/20 ORDER #:521148 REV # 4 CCISITES DOCUMENT ID: 9273940 10/13/2020 B2100722 S-2. NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- GENERAL THE MI IS AN ON-SITE VISUAL AND HANDS-ON INSPECTION OF TOWER MODIFICATIONS INCLUDING A REVIEW OF CONSTRUCTION REPORTS AND ADDITIONAL PERTINENT DOCUMENTATION PROVIDED BY THE GENERAL CONTRACTOR (GC), AS WELL AS ANY INSPECTION DOCUMENTS PROVIDED BY 3RD PARTY INSPECTORS. THE MI IS TO ENSURE THE INSTALLATION WAS CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NAMELY THE MODIFICATION DRAWINGS; IN ACCORDANCE WITH APPLICABLE CROWN STANDARDS; AND AS DESIGNED BY THE ENGINEER OF RECORD (EOR). NO DOCUMENT, CODE OR POLICY CAN ANTICIPATE EVERY SITUATION THAT MAY ARISE. ACCORDINGLY, THIS CHECKLIST IS INTENDED TO SERVE AS A SOURCE OF GUIDING PRINCIPLES IN ESTABLISHING GUIDELINES FOR MODIFICATION INSPECTION. THE MI IS TO CONFIRM INSTALLATION CONFIGURATION AND WORKMANSHIP ONLY AND IS NOT A REVIEW OF THE MODIFICATION DESIGN ITSELF, AND THE MI INSPECTOR DOES NOT TAKE OWNERSHIP OF THE MODIFICATION DESIGN. OWNERSHIP OF THE STRUCTURAL MODIFICATION DESIGN EFFECTIVENESS AND INTEGRITY RESIDES WITH THE EOR AT ALL TIMES. THE MI INSPECTOR SHALL INSPECT AND NOTE CONFORMANCE/NONCONFORMANCE AND PROVIDE TO THE CROWN POINT OF CONTACT (CROWN POC) FOR EVALUATION. ALL MI'S SHALL BE CONDUCTED BY A CROWN APPROVED MI INSPECTOR, WORKING FOR A CROWN APPROVED MI VENDOR. SEE CROWN CED-LST-10173, "APPROVED MI VENDORS". TO ENSURE THAT THE REQUIREMENTS OF THE MI ARE MET, IT IS VITAL THAT THE GENERAL CONTRACTOR (GC) AND THE MI INSPECTOR BEGIN COMMUNICATING AND COORDINATING AS SOON AS A PURCHASE ORDER ( PO) IS RECEIVED. IT IS EXPECTED THAT EACH PARTY WILL BE PROACTIVE IN REACHING OUT TO THE OTHER PARTY. IF CONTACT INFORMATION IS NOT KNOWN THE GC AND/OR INSPECTOR SHALL CONTACT THE CROWN POINT OF CONTACT (POC). REFER TO CROWN CED-SOW-10007, "MODIFICATION INSPECTION SOW", FOR FURTHER DETAILS AND REQUIREMENTS. SERVICE LEVEL COMMITMENT THE FOLLOWING RECOMMENDATIONS AND SUGGESTIONS ARE OFFERED TO ENHANCE THE EFFICIENCY AND EFFECTIVENESS OF DELIVERING AN MI REPORT: ·THE GC SHALL PROVIDE A MINIMUM OF 5 BUSINESS DAYS NOTICE, PREFERABLY 10, TO THE MI INSPECTOR AS TO WHEN THE SITE WILL BE READY FOR THE MI TO BE CONDUCTED. ·THE GC AND MI INSPECTOR COORDINATE CLOSELY THROUGHOUT THE ENTIRE PROJECT. ·WHEN POSSIBLE, IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE SIMULTANEOUSLY FOR ANY GUY WIRE TENSIONING OR RE-TENSIONING OPERATIONS. ·WHEN POSSIBLE, IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE DURING THE MI TO HAVE ANY MINOR DEFICIENCIES CORRECTED DURING THE INITIAL MI. THEREFORE, THE GC MAY CHOOSE TO COORDINATE THE MI CAREFULLY TO ENSURE ALL CONSTRUCTION FACILITIES ARE AT THEIR DISPOSAL WHEN THE MI INSPECTOR IS ON SITE. REQUIRED PHOTOS BETWEEN THE GC AND THE MI INSPECTOR THE FOLLOWING PHOTOGRAPHS, AT A MINIMUM, ARE TO BE TAKEN AND INCLUDED IN THE MI REPORT: ·PRE-CONSTRUCTION GENERAL SITE CONDITION ·PHOTOGRAPHS DURING THE REINFORCEMENT MODIFICATION CONSTRUCTION/ERECTION AND INSPECTION ··RAW MATERIALS ··PHOTOS OF ALL CRITICAL DETAILS ··FOUNDATION MODIFICATIONS ··WELD PREPARATION ··BOLT INSTALLATION ··FINAL INSTALLED CONDITION ··SURFACE COATING REPAIR ·POST CONSTRUCTION PHOTOGRAPHS ··FINAL INFIELD CONDITION PHOTOS OF ELEVATED MODIFICATIONS TAKEN ONLY FROM THE GROUND SHALL BE CONSIDERED INADEQUATE. THIS IS NOT A COMPLETE LIST OF REQUIRED PHOTOS, FOR A COMPLETE LIST OF PHOTOS SEE CED-SOW-10007. MODIFICATION INSPECTION NOTES MODIFICATION INSPECTION CHECKLIST 0 X MI CHECKLIST REQUIRED REPORT ITEM APPLICABLE CROWN DOC #BRIEF DESCRIPTION PRE-CONSTRUCTION MI CHECKLIST DRAWING THIS CHECKLIST SERVES AS A GUIDELINE FOR THE REQUIRED CONSTRUCTION DOCUMENTS AND INSPECTIONS FOR THIS MODIFICATION. EOR APPROVED SHOP DRAWINGS ONCE THE PRE-MODIFICATION MAPPING IS COMPLETE AND PRIOR TO FABRICATION, THE CONTRACTOR SHALL PROVIDE DETAILED ASSEMBLY DRAWINGS AND/OR SHOP DRAWINGS. THESE ARE TO INCLUDE, BUT ARE NOT LIMITED TO, A VISUAL LAYOUT OF NEW REINFORCEMENT, EXISTING REINFORCEMENT CONFIGURATION, PORTHOLES, MOUNTS, STEP PEGS, SAFETY CLIMBS AND ANY OTHER MISCELLANEOUS ITEMS WHICH MAY AFFECT SUCCESSFUL INSTALLATION OF MODIFICATIONS ON THE TOWER. THESE DRAWINGS SHALL BE SUBMITTED TO THE EOR FOR APPROVAL. SHOP DRAWINGS SUBMISSION SHALL INCLUDE THE EOR RFI FORM DETAILING ANY CHANGES FROM THE ORIGINAL DESIGN. FABRICATION INSPECTION A LETTER FROM THE FABRICATOR, STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH INDUSTRY STANDARDS AND THE CONTRACT DOCUMENTS, SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. FABRICATOR CERTIFIED WELD INSPECTION A CWI SHALL INSPECT ALL WELDING PERFORMED ON STRUCTURAL MEMBERS DURING FABRICATION. A WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. MATERIAL TEST REPORTS (MTR)MATERIAL TEST REPORTS SHALL BE PROVIDED FOR MATERIAL USED AS REQUIRED PER SECTION 9.2.5 OF CED-SOW-10007. MTRS SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. FABRICATOR NDE INSPECTION REPORT CRITICAL SHOP WELDS THAT REQUIRE TESTING ARE NOTED ON THESE CONTRACT DRAWINGS. A CERTIFIED NDT INSPECTOR SHALL PERFORM NON-DESTRUCTIVE EXAMINATION AND A REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. NDE OF MONOPOLE BASE PLATE A NDE OF THE POLE TO BASE PLATE CONNECTION IS REQUIRED AND A WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. PACKING SLIPS PACKING/SHIPPING LIST FOR ALL MATERIAL THAT WAS USED DURING CONSTRUCTION OF THE MODIFICATION. ADDITIONAL TESTING AND INSPECTIONS: CONSTRUCTION FOUNDATION INSPECTIONS A VISUAL OBSERVATION OF THE EXCAVATION AND REBAR SHALL BE PERFORMED BEFORE PLACING THE CONCRETE. A VISUAL OBSERVATION OF THE REBAR SHALL BE PERFORMED BEFORE PLACING THE EPOXY. A SEALED WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. CONCRETE COMP. STRENGTH AND SLUMP TEST THE CONCRETE MIX DESIGN, SLUMP TEST, AND COMPRESSIVE STRENGTH TESTS SHALL BE PROVIDED AS PART OF THE FOUNDATION REPORT. EARTHWORK FOUNDATION SUB-GRADES SHALL BE INSPECTED AND APPROVED BY AN APPROVED FOUNDATION INSPECTOR AND RESULTS INCLUDED AS PART OF THE FOUNDATION REPORT. MICROPILE/ROCK ANCHOR MICROPILES/ROCK ANCHORS SHALL BE INSPECTED BY THE FOUNDATION INSPECTION VENDOR AND SHALL BE INCLUDED AS PART OF THE FOUNDATION INSPECTION REPORT, ADDITIONAL TESTING AND/OR INSPECTION REQUIREMENTS ARE NOTED IN THESE CONTRACT DOCUMENTS. POST-INSTALLED ANCHOR ROD VERIFICATION POST INSTALLED ANCHOR ROD VERIFICATION SHALL BE PERFORMED IN ACCORDANCE WITH CROWN REQUIREMENTS AND A REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. BASE PLATE GROUT VERIFICATION THE GENERAL CONTRACTOR SHALL PROVIDE DOCUMENTATION TO THE MI INSPECTOR THAT CERTIFIES THAT THE GROUT WAS REMOVED AND/OR INSTALLED IN ACCORDANCE WITH CROWN REQUIREMENTS FOR INCLUSION IN THE MI REPORT. FIELD CERTIFIED WELD INSPECTION A CROWN APPROVED CERTIFIED WELD INSPECTOR SHALL INSPECT AND TEST FIELD WELDS, FOLLOWING ALL PROCEDURES SPECIFIED IN CROWN STANDARD DOCUMENTS APPLICABLE TO WELD INSPECTIONS. A REPORT SHALL BE PROVIDED. NDE OF FIELD WELDS SHALL BE PERFORMED AS REQUIRED BY CROWN STANDARDS AND CONTRACT DOCUMENTS. THE NDE REPORT SHALL BE INCLUDED IN THE CWI REPORT. ON-SITE COLD GALVANIZING VERIFICATION THE GENERAL CONTRACTOR SHALL PROVIDE WRITTEN AND PHOTOGRAPHIC DOCUMENTATION TO THE MI INSPECTOR VERIFYING THAT ANY ON-SITE COLD GALVANIZING WAS APPLIED PER MANUFACTURER SPECIFICATIONS AND APPLICABLE STANDARDS. TENSION TWIST AND PLUMB THE GENERAL CONTRACTOR SHALL PROVIDE A REPORT IN ACCORDANCE WITH APPLICABLE STANDARDS DOCUMENTING TENSION TWIST AND PLUMB. GC AS-BUILT DRAWINGS THE GENERAL CONTRACTOR SHALL SUBMIT A LEGIBLE COPY OF THE ORIGINAL DESIGN DRAWINGS EITHER STATING "INSTALLED AS DESIGNED" OR NOTING ANY CHANGES THAT WERE REQUIRED AND APPROVED BY THE ENGINEER OF RECORD. EOR/RFI FORMS APPROVING ALL CHANGES SHALL BE SUBMITTED. ADDITIONAL TESTING AND INSPECTIONS: POST-CONSTRUCTION CONSTRUCTION COMPLIANCE LETTER A LETTER FROM THE GENERAL CONTRACTOR STATING THAT THE WORKMANSHIP WAS PERFORMED IN ACCORDANCE WITH INDUSTRY STANDARDS AND THESE CONTRACT DRAWINGS, INCLUDING LISTING ADDITIONAL PARTIES TO THE MODIFICATION PROCESS. POST-INSTALLED ANCHOR ROD PULL TESTS POST-INSTALLED ANCHOR RODS SHALL BE TESTED BY A CROWN APPROVED PULL TEST INSPECTOR AND A REPORT SHALL BE PROVIDED INDICATING TESTING RESULTS. PHOTOGRAPHS PHOTOGRAPHS SHALL BE SUBMITTED TO THE MI. PHOTOS SHALL DOCUMENT ALL PHASES OF THE CONSTRUCTION. THE PHOTOS SHALL BE ORGANIZED IN A MANNER THAT EASILY IDENTIFIES THE EXACT LOCATION OF THE PHOTO. BOLT HOLE INSTALLATION VERIFICATION REPORT THE MI INSPECTOR SHALL VERIFY THE INSTALLATION AND TIGHTNESS 10% OF ALL NON PRE-TENSIONED BOLTS INSTALLED AS PART OF THE MODIFICATION. THE MI INSPECTOR SHALL LOOSEN THE NUT AND VERIFY THE BOLT HOLE SIZE AND CONDITION. THE MI REPORT SHALL CONTAIN THE COMPLETED BOLT INSTALLATION VERIFICATION REPORT, INCLUDING THE SUPPORTING PHOTOGRAPHS. PUNCHLIST DEVELOPMENT AND CORRECTION DOCUMENTATION FINAL PUNCHLIST INDICATING ALL NONCONFORMANCE(S) IDENTIFIED AND THE FINAL RESOLUTION/APPROVAL. MI INSPECTOR REDLINE OR RECORD DRAWING(S)THE MI INSPECTOR SHALL OBSERVE AND REPORT ANY DISCREPANCIES BETWEEN THE CONTRACTOR'S REDLINE DRAWING AND THE ACTUAL COMPLETED INSTALLATION. ADDITIONAL TESTING AND INSPECTIONS: X X X X X NA X X OR NA NA NA NA NA NA NA NA X X X X X NA X NA X X NA THE MI CHECKLIST SHALL BE REVIEWED PRIOR TO THE START OF CONSTRUCTION. ALL PARTIES TO THE MODIFICATION SHALL UNDERSTAND CROWN REQUIREMENTS AND INSPECTION/DOCUMENTATION THAT IS APPLICABLE TO THE SCOPE OF WORK THEY ARE PERFORMING. ERRORS ON THE MI CHECKLIST SHALL BE BROUGHT TO THE ATTENTION OF THE CROWN POC AND EOR AS SOON AS POSSIBLE. CED-SOW-10007 CED-SOW-10007 CED-SOW-10007 CED-SOW-10007 CED-STD-10069 CED-SOW-10007 CED-SOW-10066 CED-STD-10069 ENG-SOW-10033 CED-SOW-10007 CED-SOW-10144 CED-SOW-10144 CED-SOW-10144 CED-SOW-10144 CED-SOW-10007 ENG-STD-10323 CED-SOW-10066 CED-STD-10069 OPS-STD-10149 CED-PRC-10182 CED-STD-10261 CED-SOW-10007 CED-SOW-10007 CED-PRC-10119 CED-SOW-10007 CED-SOW-10007 CED-PRC-10283 CED-FRM-10285 CED-SOW-10007 TOWER PLUMB DELIVERABLES OPS-SOW-10127 THE GENERAL CONTRACTOR SHALL PROVIDE WRITTEN AND PHOTOGRAPHIC DOCUMENTATION TO THE MI INSPECTOR VERIFYING THE TOWER PLUMB CONDITION. SEE REQUIREMENTS ON SHEET S-4. 10/12/2020 B2100722 S-3 NOTES . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 0 GENERAL NOTES 1. The General Contractor (GC) shall reference CED-STD-10159, "Tower Modification Construction Specifications", as a continuation of the following General Notes. The GC shall keep a copy of this document with the Structural Design Drawings (SDD) at all times, and shall ensure that all Contractor Personnel are aware of the information enclosed within the General Notes and CED-STD-10159. 2. The Contract Documents are the property of Crown Castle (Crown). They are provided to the GC and its Lower Tier Contractors and material suppliers for the limited purpose of use in completing the Work for this Site, and shall be kept in strict confidence and not disclosed to any third parties. The Contract Documents shall not be used for any other purpose whatsoever without the prior written consent of Crown. 3. Detail drawings, including notes and tables, shall govern over general notes and typical details. Contact the Crown Point of Contact (POC) and Engineer of Record (EOR) for clarification as needed. 4. Do not scale drawings. 5. Any Work performed without a prefabrication mapping is done at the risk of the GC and/or fabricator. All dimensions of existing structural elements are assumed based on the available documentation and are preliminary until field-verified by the GC, unless noted otherwise (UNO). Where discrepancies are found, GC shall contact the Crown POC and EOR through RFI. 6. For this analysis and modification, the tower has been assumed to be in good condition without any structural defects, UNO. If the GC discovers any indication of an existing structural defect, contact the Crown POC and EOR immediately. 7. All construction means and methods, including but not limited to erection plans, rigging plans, climbing plans, and rescue plans, shall be the responsibility of the GC responsible for the execution of the Work contained herein, and shall meet ANSI/ASSE A10.48 (latest edition); federal, state, and local regulations; and any applicable industry consensus standards related to the construction activities being performed. All rigging plans shall adhere to ANSI/ASSE A10.48 (latest edition) and Crown standard CED-STD-10253, "Rigging Program", including the required involvement of a qualified engineer for class IV construction to certify the supporting structure(s) in accordance with the ANSI/TIA-322 (latest edition). 8. The structural integrity of the modification design extends to the complete condition only. The GC must be cognizant that the removal of any structural component of an existing tower has the potential to cause the partial or complete collapse of the structure. All necessary precautions must be taken to ensure structural integrity, including, but not limited to, engineering assessment of construction stresses with installation maximum wind speed and/or temporary bracing and shoring. 9. Aerial and underground utilities and facilities may or may not be shown on the drawings. The GC shall take every precaution to preserve and protect these items, which may include aerial or underground power lines, telephone lines, water lines, sewer lines, cable television facilities, pipelines, structures and other public and private improvements within or adjacent to the Work area. The responsibility for determining the actual on-site location of these items shall rest exclusively with the GC. 10. All manufacturer's hardware assembly instructions shall be followed, UNO. Conflicting notes shall be brought to the attention of the EOR and the Crown POC. 18. All tower grounding affected by the Work shall be repaired or replaced in accordance with OPS-STD-10090, "Tower Grounding", and OPS-BUL-10133, "Grounding Repair Recommendation". 19. If scope of modification requires removal or covering of tower ID tag, the tag must be replaced. 20. Any hardware removed from the existing tower shall be replaced with new hardware of equal size and quality, UNO. No existing fasteners shall be reused. 21. All joints using ASTM A325 or A490 bolts, U-bolts, V-bolts, and threaded rods shall be snug tightened, UNO. 22. A nut locking device shall be installed on all proposed and/or replaced snug tightened ASTM A325 or A490 bolts, U-bolts, V-bolts, and threaded rods. 23. All joints are bearing type connections UNO. If no bolt length is given in the Bill of Materials, the connection may include threads in the shear planes, and the GC is responsible for sizing the length of the bolt. 24. Blind bolts shall be installed per the installation specifications on the corresponding Approved Fastener sheets contained in CED-CAT-10300, "Monopole Standard Drawings and Approved Reinforcement Components". 25. If ASTM A325 or A490 bolts, and/or threaded rods are specified to be pre-tensioned, these shall be installed and tightened to the pretensioned condition according to the requirements of the RCSC Specification for Structural Joints Using ASTM High Strength Bolts. 26. All proposed and/or replaced bolts shall be of sufficient length such that the end of the bolt be at least flush with the face of the nut. It is not permitted for the bolt end to be below the face of the nut after tightening is completed. 11. The GC shall fabricate all required items per the materials specified below, UNO on the detail drawing sheets. If the GC finds for any component that the materials have not been clearly specified, the GC shall submit an RFI to the EOR to confirm the required material. All structural elements shall be new and shall conform to the following requirements, UNO: Monopoles: ·Structural shapes and plates: ASTM A572 Grade 65 (FY = 65 KSI) ·Welding electrodes, SMAW: E80XX ·Welding electrodes, FCAW: E8XT-XX ·Welding electrodes, GMAW: ER80S-X Self-Support and Guyed Towers: ·Structural shapes and plates: ASTM A572 Grade 50 (FY = 50 KSI) ·Welding electrodes, SMAW: E70XX ·Welding electrodes, FCAW: E7XT-XX ·Welding electrodes, GMAW: ER70S-X All tower types: ·Steel angle:ASTM A572 Grade 50 (FY = 50 KSI) ·Solid rod:ASTM A36 (FY = 36 KSI) ·Pipe/tube (round):ASTM A500 Grade C (FY = 46 KSI) ·Pipe/tube (square): ASTM A500 Grade C (FY = 50 KSI) ·Bolts:ASTM F3125 Grade A325 Type 1 ·U-bolts:ASTM A307 Grade A, or SAE J429 Grade 2 ·Nuts:ASTM A563 Grade DH ·Washers:ASTM F436 Type 1 ·Guy Wires:ASTM A475 Grade EHS ·Bridge Strand: ASTM A586 Grade 1 12. After fabrication, hot-dip galvanize all steel items, UNO. Galvanize per ASTM A123, ASTM A153/A153M, or ASTM A653 G90, as applicable. ASTM A490 bolts shall not be hot-dip galvanized, but shall instead be coated with Magni 565 or EOR approved equivalent, per ASTM F2833. 13.Contractor Personnel shall not drill holes in any new or existing structural members, other than those drilled holes shown on structural drawings, without the approval of the EOR. 14. For a list of Crown-approved cold galvanizing compounds, refer to OPS-STD-10149, “Tower Protective Coatings”. 15.All exposed structural steel as the result of this scope of Work including welds (after final inspection of the weld by the CWI), field drilled holes, and shaft interiors (where accessible), shall be cleaned and two (2) coats cold galvanizing shall be applied by brush in accordance with OPS-STD-10149, “Tower Protective Coatings”. Photo documentation is required to be submitted to the MI Inspector. 16. If removal of existing modifications is required per the modification scope, the GC shall clean and cold galvanize any existing empty bolt holes, UNO. If additional unexpected, oversized, or slotted holes are found, the GC shall contact the EOR and Crown POC for guidance prior to proceeding with the modifications. 17. All Work involving base plate grout scope items or resulting in disturbance of base plate grout shall reference ENG-STD-10323, "Base Plate Grout", and shall follow any Base Plate Grout Removal Notes contained herein.10/13/2020 B2100722 S-4 NOTES . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 0 1. Check of vertical alignment and level of base tower and canister assembly sections for conformance to a plumb condition in accordance with ANSI/TIA-222 (applicable version) standards. Plumb condition is to be documented with proper notes and pictures to prove, at a minimum, the following: A. Deflection calculations per ANSI/TIA-222 (applicable version) standards. B. Minimum and maximum (i.e. hot and cold) surface temperature readings on base monopole. C. Time of day measurement was taken (e.g. dawn, noon, dusk). D. Pictures of a level or digital inclinometer measured at a minimum of (3) equidistant locations around the base plate to prove level condition. E. Azimuth or monopole flat number of the direction of the out-of-plumb deflection. TOWER PLUMB REQUIREMENTS 10/13/2020 B2100722 POLE ELEVATION BASE LEVEL DRAWING POLE MODIFICATION SCHEDULE B ELEVATION (FT)REFERENCE SHEET 25.0 - 47.0 S-5REMOVE EXISTING CONCEALMENT SPINE AND CANISTERS MODIFICATION PRIOR TO FABRICATION AND INSTALLATION, CONTRACTOR SHALL FIELD VERIFY ALL LENGTHS AND QUANTITIES GIVEN. LENGTH AND QUANTITIES PROVIDED ARE FOR QUOTING PURPOSES ONLY, AND SHALL NOT BE USED FOR FABRICATION. FOR PARTS NOT DETAILED WITHIN THE DRAWING AND STARTING WITH "CCI-", SEE THE FOLLOWING CATALOG FOR DETAILS: CED-CAT-10300, MONOPOLE STANDARD DRAWINGS AND APPROVED REINFORCEMENT COMPONENTS POLE SPECIFICATIONS TOWER TAPER: BASE PL STEEL: ANCHOR RODS: 0.0000 IN/FT ASTM A36 (36 KSI) 1"Ø ASTM F1554-105 SHAFT SECTION DATA SHAFT SECTION SECTION LENGTH (FT) PLATE THICKNESS (IN) DIAMETER ACROSS FLATS OR OF ROUND SECTION (IN) @ TOP @ BOTTOM 1 NA NOTE: DIMENSIONS SHOWN DO NOT INCLUDE GALVANIZING TOLERANCES SECTION SHAPE SECTION GRADE (KSI) FLANGE PLATE GRADE (KSI) LAP SPLICE (IN) E N/A OPS-PRC-10127INSTALL NEW CROWN CASTLE CONCEALMENT REINFORCEMENT SOLUTION D N/A S-4UPON COMPLETION CHECK TOWER PLUMB (REF TOWER PLUMB REQUIREMENTS) 25.00 0.2500 18.000 18.000ROUND35- 0.0 FT TOP OF BASE PLATE 47.0 FT 25.0 FT B A 28.0 S-5REMOVE EXISTING MOUNTS, ANTENNAS, AND EQUIPMENT C 25.0 - 47.0 S-6INSTALL NEW CONCEALMENT ASSEMBLY F N/A N/APAINT ALL NEW MODIFICATIONS TO MATCH EXISTING TOWER FINISH (REF ENG-BUL-10149) A28.0 FT C (PROPOSED EQUIPMENT CONFIGURATION) (12) 1/2" TO 34 FT LEVEL (3) 1/4" TO 42 FT LEVEL (1) 5/16" TO 42 FT LEVEL (12) 1/2" TO 42 FT LEVEL S-5 POLE MODIFICATION SCHEDULE . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 010/13/2020 B2100722 ELEVATION VIEW A-A S-6 90° (TYP) NEW 3/4" Ø BOLT ASSEMBLY (TYP 12) #Z1 NEW BRACKET ASSEMBLY REF S-7 (TYP) #Z3 NEW SPINE ASSEMBLY REF S-9 NEW 42"Ø x 11'-0" CONCEALMENT SHROUD TO BE DESIGNED BY OTHERS (TYP 2) #Z2 NEW BULKHEAD ASSEMBLY REF S-8 A S-6 B-B S-6 TYPICAL BOLT ASSEMBLY NUT A325N BOLT FULLY PRE-TENSION BOLTS USING THE "TURN OF NUT" METHOD IN ACCORDANCE WITH THE AISC STEEL CONSTRUCTION MANUAL (LATEST EDITION) SEE NOTE 1 FLAT WASHER C-C BRACKET CONNECTION S-6 NOTE: 1.FULLY PRE-TENSION BOLTS USING THE "TURN OF NUT" METHOD IN ACCORDANCE WITH THE AISC STEEL CONSTRUCTION MANUAL (LATEST EDITION). NEW 3/4" Ø BOLT ASSEMBLY (TYP 3 PER ASSEMBY) #Z1 NEW BRACKET ASSEMBLY REF S-7 #Z2 NEW BULKHEAD ASSEMBLY REF S-8 #Z3 NEW SPINE ASSEMBLY REF S-9 C-C S-6 #Z4 NEW RAIN CAP/BULKHEAD ASSEMBLY REF S-11 A-A S-6 BOTTOM FLANGE CONNECTION #Z3 NEW SPINE ASSEMBLY REF S-9 #Z1 NEW BRACKET ASSEMBLY REF S-7 (TYP 4) #Z2 NEW BULKHEAD ASSEMBLY REF S-8 EXISTING TOWER SHAFT EXISTING FLANGE PLATE B-B TOP FLANGE CONNECTION S-6 #Z3 NEW SPINE ASSEMBLY REF S-9 NEW 3/4" Ø BOLT ASSEMBLY (TYP 4) #Z4 NEW RAIN CAP/BULKHEAD ASSEMBLY REF S-11 NEW 3/4" Ø BOLT ASSEMBLY (TYP 4) RAIN CAPA S-6 S-6 DETAILS . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 010/13/2020 B2100722 NOTES: 1. ALL HOLES TO BE SHOP FABRICATED, UNLESS NOTED OTHERWISE. 2. FULL ASSEMBLY TO BE HOT DIP GALVANIZED PER ASTM A153 / A153M, AS APPLICABLE. (4) PL 1 x 9 x 4 1/2" (A572-50) #z1c / 11.2# (4) BRACKET WELDMENT (A572-50) #Z1 / 22.0# 4 1/2" 4 1/2" 2 1/4"9"3"3"3"1" (4) PL 1 x 4 1/2 x 4 1/2" (A572-50) #z1d / 5.6# 4 1/2" 2 1/4"1" (4) PL 1/2 x 9 x 3 1/2" (A572-50) #z1a / 3.0# 1/8" 45° 1/2"1"9"3 1/2"1"(4) PL 1/2 x 9 x 3 1/2" (A572-50) #z1b / 3.0#3"4 1/2"#z1c 13/16"Ø HOLE (TYP 2) 13/16"Ø HOLE #z1a#z1b #z1d4 1/2"3"CJP TYP 45 G CJP TYP 45 G 4 1/2"4 1/2"10"45°1/8"1/8"45° 1/8" 45° 1/2"1"9"3 1/2"1"1/8"45° #z1a #z1b #z1d #z1c #z1c #z1a #z1d S-7 DETAILS . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 010/13/2020 B2100722 3'-5 5/8" 3 1/2" (TYP) 2 1/4" 90° (TYP) R2 1/2" R1"2 3/4"1 1/2"45° (TYP) (1) PL 3/8 x 3'-5 5/8"Ø (A36) #z2a / 56.7# (1) PL 1/4 x 2 3/4 x 10'-10" LONG (A36) #z2b / 25.3# (1) BULKHEAD ASSEMBLY #Z2 / 82.0# 1 4 E70XX TYP2-6 #z2a #z2b #z2b #z2a NEW 5/16" AEHS-518-312 HEX RIVET NUT WELDED TO RING PLATE (TYP 12) 3 16 TYP Ø3'-5 5/8" (TYP) 1/2"Ø HOLE (TYP 8) 13/16"Ø HOLE ON A 24.00" B.C. (TYP 4) NOTES: 1. ALL HOLES TO BE SHOP FABRICATED, UNLESS OTHERWISE NOTED 2. FULL ASSEMBLY TO BE HOT-DIP GALVANIZED PER ASTM A153 / A153M OR A123, AS APPLICABLE S-8 DETAILS . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 0 10/13/2020 B2100722 (1) SPINE ASSEMBLY #Z3 / 736.0# #z3b REF S-10 #z3c REF S-10 (TYP)21'-11 1/4"10'-11 5/8"1"1"C-C B-B A-A S-9 #z3a REF S-10 #z3d REF S-10 #z3e REF S-10 #z3f REF S-10 SEAL WELD TYP E-E TOP FLANGE WELD #z3a REF S-10 #z3f REF S-10 1"D-D BOTTOM FLANGE WELD E70XX TYP 5 16 5 16 #z3a REF S-10 #z3c REF S-10 (TYP) #z3b REF S-10 E70XX E70XX BACK GOUGE-CJP TYP 45 45 5 16 5 16 45 1"A-A BOTTOM FLANGE CONNECTION 90° (TYP) D-D #z3b REF S-10 #z3a REF S-10 #z3c REF S-10 (TYP 4) B-B BULKHEAD CONNECTION #z3a REF S-10 #z3d REF S-10 #z3e REF S-10 E70XX 1 4 E70XX TYP 2-6 1 4 2-6 C-C TOP FLANGE CONNECTION E-E #z3a REF S-10 #z3f REF S-10 S-9 S-9 S-9 S-9 S-9 S-9 S-9 S-9 S-9 5 8 3 8 S-9 DETAILS . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 010/13/2020 B2100722 45° 1"11 1/2"11 1/2"1"1/2" 4 1/4"1/8" 45° 2'-3"Ø 1'-6"Ø 13/16"Ø HOLE 24.00 B.C. (TYP 4) (1) PL 2 x 2'-1"Ø (A572-50) #z3b / 180.2# (1) SR 3.5000 x 21'-9 1/4" LONG (ASTM A500-C-46) #z3a / 356.6# (4) PL 1/2 x 11 1/2 x 0'-11 1/2" LONG (A572-50) #z3c / 10.9# NOTES: 1. ALL HOLES TO BE SHOP FABRICATED, UNLESS OTHERWISE NOTED 2. FULL ASSEMBLY TO BE HOT-DIP GALVANIZED PER ASTM A153 / A153M OR A123, AS APPLICABLE 13/16"Ø HOLE 6.00 B.C. (TYP 4) (1) PL 2 x 8Ø (A572-50) #z3f / 22.8# 3 9/16"Ø HOLE 8"Ø (1) PL 3/8 x 3'-5 1/8"Ø (A36) #z2d / 86.8#5 9/16"3'-5 1/8"Ø 7"Ø 3 9/16"Ø HOLE 90° (TYP) R2 1/2" (TYP) R1" (TYP) 45° (TYP) 3 16 TYP NEW 5/16" AEHS-518-312 HEX RIVET NUT WELDED TO RING PLATE (TYP 16) Ø3'-5 5/8" (TYP) 1/2"Ø HOLE (TYP 16)1"5"1"(1) PL 1/4 x 5 x 10'-10" LONG (A36) #z2e / 46.0# S-10 DETAILS . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 0 10/13/2020 B2100722 #z4a #z4b (1) RAIN CAP / BULKHEAD ASSEMBLY #Z4 / 168.7# #z4a #z4b 1 4 2-6 E70XX TYP (1) PL 3/8 x 3'-5 1/8"Ø (A36) #z4a / 141.1# 90° (TYP) 13/16"Ø HOLE ON A 6.00" B.C. (TYP 4) (1) PL 1/4 x 3 x 10'-10" LONG (A36) #z4b / 27.6# NEW 5/16" AEHS-518-312 HEX RIVET NUT WELDED TO RING PLATE (TYP 8) 3 16 TYP 1 1/2"3"1/2"Ø HOLE (TYP 8) 45° (TYP) NOTES: 1. ALL HOLES TO BE SHOP FABRICATED, UNLESS OTHERWISE NOTED 2. FULL ASSEMBLY TO BE HOT-DIP GALVANIZED PER ASTM A153 / A153M OR A123, AS APPLICABLE S-11 DETAILS . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: TAFT AND ELIZABETH BU NUMBER: 856479 WO NUMBER: 1887900 SITE ADDRESS: 1015 SOUTH TAFT HILL ROAD FORT COLLINS, CO 80526 LARIMER COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 10/08/20 TPS 10/13/20 SL 10/13/20 -------- 010/13/2020 B2100722