HomeMy WebLinkAbout812 BISCAY LN - SPECIAL INSPECTIONS - 10/10/2020Excavation Quality Assurance
Observation (Open-Hole):
·T CTL I THOMPSON
Per the client's request, a representative ofCTL has visually observed the soils
exposed within the excavation at the site referenced below. The followi ng
summarize s our observations and opinions at the time of our vi sit.
Background Information:
Soils Report by: ___ __,_A'-"A--'----------
Date: _______ Job#: _________ _
Anticipated Soil Profile: __ ~Q_-=.3---~~,.~>=£,.._~,:~/4_7.,,_
Foundation Plan by: __ _,01-c,c__...;../&y_-,c.....::~c..::."'-"2-L-_)..-'--,.,,-.,:--_· __
Anticipated foundation type?
0 s pread fo oting
D footing with voids
D drilled piers /J.,.r...!,
D wall on g rade
D pad and grade beam
® other (describe)
Observed Soil Profile: _ __,o""--~""'3'--'~>'°"""'c_...,. __ i_,_--'e--/.~7,,___
Notes: ------------------
Lot: 11> Block: ____ Filing: /
Subdivision: __ ..... e'"""n;-"-"-iJ=,'.v=,:.="--/4,~...,~w:<~_,_P_u=D~--
. . . . : : : : : '. : : . : : ! i : : • ' • : : : ~ : : : . ' ' • . . • . • ' .
' ............. •·• ......................... '
· • • • • r • • •· · • · • • · · • : 1 · • · • · • · · · • • · · · • • · • • • • • • • •· •
' • • i • . . • • • • • • • •• ··• • ~ • • . .
• • • 1 • ' ; • 1 "" • ·• ' • 4 0 • ' j ' o ' • -I •! i • • • ' 0 ' • • • • • • •
• •• • •·, .• ,•I •',•·•••••••-••••••••.
Summary of opinions:
!XI It is our opinion that the exposed soils are generally
consistent with those anticipated.
D Rejected (2nd observation required)
Corrective action: ---------------
Date
Date
CTL I Thompson, Inc. I 1 103 Old Town Lane, Suite 20 I B, Cheye nne, Wyo min g 82009
Framing Quality Assurance Observation
Per the client's request, a represe ntative of CTL has visually observed
portions of the framing under construction at the site referenced below.
The purpose of our observations is to verify general conformance with
plans. This work is not intended to replace regular framing inspections
provided by the local bui lding department.
T CTLITHOMPSON
✓
Site Address: ;?/2 ,,t5.,s,,o/ /4 ':z"'. ,
er/ ~/~~ ,, /4/4-rt:.,h
Framing Plan Information
Plan By: ___ C..._J-;J.. __ 7t_7_.,__~_a_~..<..,, ___ · _,L:.._~--'-'-'--
Date: ~ih, ,/2., Job#: 1,Jp,18:,~ ,cwSheet __ /_or_{_
Site Observation Notes: -i~). ,&.$,.~
CTL I Thompson, Inc. I
Lot: _L.Q_ Block: _:__ Filing: ~/ __
Subdivision: ~""-;,{,....,""<
Summary of Opinions
Jll_ It is our opinion that the framing observed was m
general conformance with the framing plans.
□ It is our opinion that the framing observed was not in
general conformance with the framing plan.
(2nd observation required).
Exceptions Noted: _____________ _
Field Representative Date