HomeMy WebLinkAbout2544 NANCY GRAY AVE - SPECIAL INSPECTIONS - 11/18/2020November 18, 2020
Bellisimo, Inc.
3702 Manhattan Avenue, Suite 201
Fort Collins, Colorado 80526
Attn: Mr. Nico Campana (ncampana@bellisimoinc.com)
Re: Foundation Drain and Damp Proofing Observation
Lot 8, Block 2 – Bucking Horse 3rd Filing
Fort Collins, Colorado
EEC Project No. 15-01-052
Mr. Campana:
As requested, Earth Engineering Company, Inc. (EEC) personnel have completed the construction
observation services you requested for the referenced project. Those services included observations of
the foundation drain placement and damp proofing at the referenced lot. The results of those observations
are included with this report.
On November 17th, 2020, EEC personnel observed the foundation drain for the referenced project. The
foundation drain consisted of 4-inch perforated pipe enclosed in a filter fabric ‘sock’ and was connected
to a basement sump pit. The gravel was not placed at the time of our observations and will be placed at
a later date. The damp proofing consisted of a grey spray-on coating that appeared to cover all exterior
below grade living areas of the basement walls.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding
this report, or if we can be of further service to you in any way, please do not hesitate to contact us.
Very truly yours,
Earth Engineering Company, Inc.
Michael J. Coley, P.E.
Principal Engineer
TD Structural Engineering, Inc. | 2909 Oxford Ct., Fort Collins, CO 80525 | 970.372.1140 | www.tdstructural.com
November 12, 2020
Dominick Campana
3rdgenbuildersinc@gmail.com
Observation Report
Project: Sabino, 2544 Nancy Gray, Fort Collins, Colorado
TDSE Project No.: 20-115
Plans/Details: Plans by TD Structural Engineering Inc. dated 10/8/2020
Observation Dates: 11/6 and 11/12/2020
Items Reviewed: footing and foundation wall sizes and reinforcing, UFER ground
Notes:
Observations indicate the footing and foundation wall sizes and reinforcing are in substantial
conformance with the plans as noted above. In addition, the UFER ground has been placed in general
accordance with NEC recommendations.
Please let me know if you have any questions.
Wendy Thomas Dworak, P.E.
Structural Engineer/President
TD Structural Engineering Inc.