Loading...
HomeMy WebLinkAbout2026 BEAR MOUNTAIN DR - 15-17 - SPECIAL INSPECTIONS - 3/19/2021Page 1 of 2 BUILDING INSPECTION RECORD Lofts at Timberline (2026 Bear Mountain Drive) Owner: Omnia Cum Deo Contact: Keith Meyer, P.E. Project Name: Lofts at Timberline Project Number: N/A Building 2026 Bear Mountain Drive Local Building Official: City of Fort Collins Building Permit No: B2013203 Architect/Engineer: R4 Architects / Ditesco LLC Type of Construction: Type III-B Contractors: General: Elder Construction Occupancy Classifications: A-3, B Electrical: APS, Inc. Total Building Area: 5,673 sf Mechanical: Integrated Mechanical Plumbing: Integrated Mechanical Building General Date Inspector ☒ Footings/Foundations Comments: Under separate permit for Core & Shell N/A N/A ☐ Concrete Slab / Under-Floor Comments: Concrete slab was constructed in accordance with plans and specifications. 1/13/2021 BR - Ditesco ☐ Light Gauge Framing Comments: N/A N/A N/A ☐ Sheathing Comments: N/A N/A N/A ☐ Fire-Resistant Penetrations Comments: N/A N/A N/A ☐ Mechanical/Energy Efficiency Comments: N/A N/A N/A ☐ Roofing Comments: N/A N/A N/A ☐ Other Comments: N/A N/A N/A ☐ Final Comments: N/A N/A N/A Special Date Inspector ☒ Bolt/Weld Inspection Comments: Beam-Beam and Beam-Column Bolting Inspected. Installed in accordance with PEMB Engineer and project plans and specifications. 2/8/2021 KP-Ditesco ☒ Special Structural Concrete Comments: The mezzanine composite slab was constructed in accordance with the plans and specifications. 2/9/2021 KP-Ditesco CTL Thompson ☐ Masonry Comments: N/A N/A N/A ☐ Wood Comments: N/A N/A N/A ☐ Soils/Foundations Comments: N/A N/A N/A ☐ Spray-Applied Fireproofing Comments: N/A N/A N/A ☐ Control Systems Comments: N/A N/A N/A 2133 S. Timberline Rd. – Suite 110 Fort Collins, CO 80525 ditescoservices.com Delivery via e-mail to: keith.meyer@ditescoservices.com March 10, 2021 Mr. Keith Meyer, P.E. Omni Cum Deo 2133 S. Timberline Rd STE 110 Fort Collins, CO 80525 RE: Bolt Inspection 2-8-2021 (Outrun Parkour) Dear Keith: The following inspection was performed on February 8, 2021: Location/Project: Lofts at Timberline, 2021, 2027 and 2033 S Timberline Rd (parcels #8719144006, 8719144007, 8719144004) Inspector: Kelsey Petersen Inspection Type: Visual, High Strength Bolt (AISC Spec. for Structural Joints Using ASTM A325 or A490 Bolts, Sect. 8,9) Observations: Structural connections at beam-to-beam and beam-to-column locations at Dutch Brothers HQ mezzanine. Inspection was at 10% frequency to hand tight condition per ASTM and Project Specifications. Bolts observed to not be tightened to hand tight condition were tightened before completion of observation. 100% of inspected bolts were in acceptable condition prior to completion of observation. PEMB Plans by: Outrun Parkour – RA Architects, Job # RRE20434, drawn on 12/7/2020 PEMB Steel supplied by: Hueber Industries At the time of our observation, the items observed met the quality standards listed above: Yes Discrepancies were observed, see attached discrepancy list: No Please let me know if you have any questions regarding this monthly progress report or the attached invoice. I can be reached by phone at 970.820.0175 or email bill.renz@ditescoservices.com. Sincerely, Bill Renz, P.E.