Loading...
HomeMy WebLinkAbout2473 CROWN VIEW DR - 02 - SPECIAL INSPECTIONS - 7/22/2020Architecture Structural Geotechnical Materials Testing Forensic Civil/Planning ROCKY MOUNTAIN GROUP EMPLOYEE OWNED Southern Office: Colorado Springs, CO 80918 719.548.0600 Central Office: Englewood, CO 80112 303.688.9475 Northern Office: Evans, CO 80620 970.330.1071 Fort Collins: 970.616.4364 Monument: 719.488.2145 Woodland Park: 719.687.6077 www.rmgengineers.com Job No. 177606 July 22, 2020 Saint Aubyn Homes 212 North Wahsatch Avenue, Suite 201 Colorado Springs, CO 80903 Re: Foundation Damp Proofing 2473 Crown View Dr Fort Collins, Colorado Dear Saint Aubyn Homes: As requested, personnel of RMG – Rocky Mountain Group observed the foundation damp proofing and found it to be complete and in substantial compliance with the design drawings prepared by RMG – Rocky Mountain Group for this structure at the date of the inspection. The damp proof was observed on July 21, 2020. Should you have questions, please feel free to contact our office. Cordially, RMG – Rocky Mountain Group Thomas M. Cope, P.E. Sr. Geotechnical Project Manager 7/22/20 Architecture Structural Geotechnical Materials Testing Forensic Civil/Planning ROCKY MOUNTAIN GROUP EMPLOYEE OWNED Southern Office: Colorado Springs, CO 80918 719.548.0600 Central Office: Englewood, CO 80112 303.688.9475 Northern Office: Evans, CO 80620 970.330.1071 Fort Collins: 970.616.4364 Monument: 719.488.2145 Woodland Park: 719.687.6077 www.rmgengineers.com Job No. 177606 July 14, 2020 Saint Aubyn Homes 212 North Wahsatch Avenue, Suite 201 Colorado Springs, CO 80903 Re: Footing and Foundation Observation 2473 Crown View Dr Fort Collins, Colorado Dear Saint Aubyn Homes: As requested, personnel of RMG – Rocky Mountain Group observed the footing and foundation formwork and reinforcing steel for the above referenced single family residential property and found them to be in substantial compliance with the design drawings prepared by RMG – Rocky Mountain Group for this structure. The concrete encased electrode system was placed in the footing and meets the requirements of Article 250.52 of the 2014 National Electrical Code (NEC). The footings were observed on July 6, 2020 and the foundation walls were observed on July 13, 2020. Should you have questions, please feel free to contact our office. Cordially, RMG – Rocky Mountain Group Thomas M. Cope, P.E. Sr. Geotechnical Project Manager 7/14/20 Architecture Structural Geotechnical Materials Testing Forensic Civil/Planning ROCKY MOUNTAIN GROUP EMPLOYEE OWNED Southern Office: Colorado Springs, CO 80918 719.548.0600 Central Office: Englewood, CO 80112 303.688.9475 Northern Office: Evans, CO 80620 970.330.1071 Fort Collins: 970.616.4364 Monument: 719.488.2145 Woodland Park: 719.687.6077 www.rmgengineers.com Job No. 177606 July 22, 2020 Saint Aubyn Homes 212 North Wahsatch Avenue, Suite 201 Colorado Springs, CO 80903 Re: Foundation Subsurface Drain Observation 2473 Crown View Dr Fort Collins, Colorado Dear Saint Aubyn Homes: As requested, personnel of RMG – Rocky Mountain Group observed the foundation subsurface drainage pipe and sump pit perimeter drain system on July 21, 2020. RMG found it to be complete and in substantial compliance with the design drawings prepared by RMG – Rocky Mountain Group for this structure at the date of this observation. Should you have questions, please feel free to contact our office. Cordially, RMG –Rocky Mountain Group Thomas M. Cope, P.E. Sr. Geotechnical Project Manager 7/22/20