HomeMy WebLinkAbout422 VICOT WAY - DISCLOSURES - 3/12/2021BUILDING LEAKAGE TEST
Date of Test: 3/12/2021 Test File: 422 Vicot Way
Technician:Trevor Donnelly (EnergyLogic)
Project Number:
Customer:Lennar
Phone:
Fax:
Building Address: 422 Vicot Way
Fort Collins, CO 80521
Test Results at 50 Pascals:
cfm50 Airflow 945 (+/- 5.7 %)
ACH50 2.74
Leakage Areas:117.1 in² (+/- 16.1 %) Canadian EqLA @ 10 Pa
69.2 in² (+/- 26.6 %) LBL ELA @ 4 Pa
Building Leakage Curve:Flow Coefficient (C) = 116.0 (+/- 42.7 %)
Exponent (n) = 0.536 (+/- 0.117)
Correlation Coefficient = 0.99297
Test Standard:E779-10
Test Mode:Depressurization
4 5 6 7 8 9 10 20 30 40 50 60 70
Building Pressure (Pa)
200
300
400
500
600
700
800
900
1000
2000
Building
Leakage
(cfm)
Depressurize ____
BUILDING LEAKAGE TEST Page 2 of 4
Date of Test: 3/12/2021 Test File: 422 Vicot Way
Building Information
Volume (ft³)20689
Surface Area: (ft²)
Floor Area: (ft²)
Height (ft)20
Year of Construction 2021
Equipment Information
Type Manufacturer Model Serial Number Custom Calibration Date
Fan Energy Conservatory Model 3 (110V) -
Micromanometer Energy Conservatory DG700
BUILDING LEAKAGE TEST Page 3 of 4
Date of Test: 3/12/2021 Test File: 422 Vicot Way
Depressurization Test:
Environmental Data
Indoor Temperature (°F)Outdoor Temperature (°F)Altitude (ft)
Pre-Test 65.0 45.0
Post-Test 65.0 45.0
Average 65.0 45.0 5000.0
Data Points - Data Entered Manually (TTE 5.0.8.4)
Nominal
Building
Pressure
(Pa)
Baseline
adjusted
Building
Pressure
(Pa)
Fan
Pressure
(Pa)
Nominal
Flow
(cfm)
Adjusted
Flow
(cfm)% Error
Fan
Configuration
0.0 n/a n/a
-60.0 -60.0 33.9 33.9 1060 1042 -0.0 Ring A
-50.0 -50.0 275.6 275.6 982 965 2.2 Ring B
-40.0 -40.0 206.4 206.4 851 837 -0.2 Ring B
-30.0 -30.0 138.8 138.8 699 687 -4.3 Ring B
-20.0 -20.0 103.0 103.0 603 593 2.6 Ring B
0.0 n/a n/a
Deviations from Standard ASTM E779-10 - Test Parameters
-Pressurization test not included.
BUILDING LEAKAGE TEST Page 4 of 4
Date of Test: 3/12/2021 Test File: 422 Vicot Way
Comments
House to garage: -50 pass