HomeMy WebLinkAbout3342 GUNNISON DR - PERMITS - 2/10/2021Owner:DOUGLASS JEFFREY H
3342 GUNNISON DR
FORT COLLINS,CO 80526-2790 Phone:970-223-9634
Zoning:Front setback:Rear setback:Right setback:Left setback:
Minor Amend #:Plat File #:ZBA Case #:
Zoning district:RL -LOW DENSITY RESIDENTIAL DISTRICT
Legal:Subdivision/PUD:Filing #:Lot #:Block #:
Code:Res sq ft:Com sq ft:Ind sq ft:Basement sq ft:
#of stories:Occ Group:Const Type:
Fire Sprklr:Stock plan #:Stock plan options:
Contractor:ALLEN PLUMBING &HEATING
101 S.LINK LANE
FORT COLLINS,CO 80524
License #:MP-4
Phone:970-484-4841
Supervisor cert #:
Subcontractor(s)Phone License Number
Plumbing:ALLEN PLUMBING &HEATING 970-484-4841 MP-4
Work Description:Replace water heater
SCHEDULE INSPECTIONS:**via Text Message:888-406-6394 **By Phone:970-221-6769
**Online Portal:fcgov.com/CitizenAccess **Online Portal via Mobile Device:fcgov.com/CitizenAccess/mobile
Possible Inspections Required:300 301 302
TOTAL FEES PAID AS OF 02/10/21:$121.36 Payment method:Trust Account
**Fee Detail Displayed on Next Page
As a condition for the issuance of a permit,I hereby declare that I am the owner or owner's agent,authorized to perform the proposed work on the property described herein.
I agree to comply with all the requirements contained herein,and City ordinances,and State laws associated with such work.I understand that such permit may be
revoked in the event that issuance was based on incorrect information.This permit shall become null and void if the work authorized by such permit is not commenced,
suspended,abandoned or not inspected within 180 days from the date of such permit.
Carbon Monoxide Alarm required within 15 feet of each bedroom entrance.
Community Development &Neighborhood Services
281 N.College Ave Fort Collins,CO 80522
970.221.6760 970.224.6134 -fax
Building Permit #:B2101039
Issued Full:02/10/2021
Permit Type:Residential Water Heater
Site Address:3342 GUNNISON DR
Job Valuation:$2,424.00 Category:Residential
Signature:Print Name:Date:
Form Revised Oct 2010
Transactions
Method Check Number Date Paid Amount Paid Comments
Trust Account 02/10/2021 $121.36
Receipt issued:02/10/2021 Total Paid to Date:$121.36
Fee Description Account Code Fee Amount Amount Paid Date Paid Amount Due
City Sales/Use Tax 251.122030 $46.66 $46.66 02/10/2021 $0.00
County Sales/Use Tax 100.217030 $9.70 $9.70 02/10/2021 $0.00
Permit Flat Fee -$65 1000.422010 $65.00 $65.00 02/10/2021 $0.00
TOTAL FEES:$121.36 $121.36 $0.00
TOTAL BALANCE DUE AS OF 02/10/2021:$0.00
Community Development &Neighborhood Services
281 N.College Ave Fort Collins,CO 80522
970.221.6760 970.224.6134 -fax
Building Permit #:B2101039
Issued Full:02/10/2021
Permit Type:Residential Water Heater
Site Address:3342 GUNNISON DR
Job Valuation:$2,424.00 Category:Residential
Fee Amounts are valid for date of this document only.Fees subject to change without notice.
Form Revised Oct 2010
Building Permit Over the Counter Application
2.
1.Job site address:
3342 Gunnison Drive, Fort Collins, Colorado 80526
2.Property owner name:
Jeffrey Douglass
3.Property owner address:
Street Address: : 3342 Gunnison Drive
City: : Fort Collins
State: : Colorado
Zip: : 80526
4.Property owner phone number:
970-223-9634
5.Project type:
Residential
6.What type of residential?
Single Family Detached
7.Value of work (Labor and Materials)($):
2424.00
8.Type of permit:
Water Heater and HVAC
Please note: each individual lot requires a separate application and permit.
Please note: each individual appliance requires a separate application and permit.
9.Unit type:
Water Heater
10.Is this new install or a replacement install?
Replacement (New unit replacing existing unit)
11.Contractor company name:
Allen Plumbing and Heating
12.Contractor company address:
101 S Link Lane, Fort Collins, Colorado 80524
13.Contractor company phone number:
9704947632
02.10.2021
B2101039
14.Contractor company email:
christina@allenph.com
15.License number:
MP-4
3. Review
17.I hereby acknowledge that I have read this application and state that the above information is complete and
correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating
building construction. I know that a permit is not valid until it has been paid and issued.
Signature of: Christina Evans
Date Signed:
02/09/2021
18.Please include an email address to receive a confirmation and a copy of your answers.
christina@allenph.com
4. Thank You!
Thank you for submitting your application for processing.
To submit another over the counter application, click here.