Loading...
HomeMy WebLinkAbout3342 GUNNISON DR - PERMITS - 2/10/2021Owner:DOUGLASS JEFFREY H 3342 GUNNISON DR FORT COLLINS,CO 80526-2790 Phone:970-223-9634 Zoning:Front setback:Rear setback:Right setback:Left setback: Minor Amend #:Plat File #:ZBA Case #: Zoning district:RL -LOW DENSITY RESIDENTIAL DISTRICT Legal:Subdivision/PUD:Filing #:Lot #:Block #: Code:Res sq ft:Com sq ft:Ind sq ft:Basement sq ft: #of stories:Occ Group:Const Type: Fire Sprklr:Stock plan #:Stock plan options: Contractor:ALLEN PLUMBING &HEATING 101 S.LINK LANE FORT COLLINS,CO 80524 License #:MP-4 Phone:970-484-4841 Supervisor cert #: Subcontractor(s)Phone License Number Plumbing:ALLEN PLUMBING &HEATING 970-484-4841 MP-4 Work Description:Replace water heater SCHEDULE INSPECTIONS:**via Text Message:888-406-6394 **By Phone:970-221-6769 **Online Portal:fcgov.com/CitizenAccess **Online Portal via Mobile Device:fcgov.com/CitizenAccess/mobile Possible Inspections Required:300 301 302 TOTAL FEES PAID AS OF 02/10/21:$121.36 Payment method:Trust Account **Fee Detail Displayed on Next Page As a condition for the issuance of a permit,I hereby declare that I am the owner or owner's agent,authorized to perform the proposed work on the property described herein. I agree to comply with all the requirements contained herein,and City ordinances,and State laws associated with such work.I understand that such permit may be revoked in the event that issuance was based on incorrect information.This permit shall become null and void if the work authorized by such permit is not commenced, suspended,abandoned or not inspected within 180 days from the date of such permit. Carbon Monoxide Alarm required within 15 feet of each bedroom entrance. Community Development &Neighborhood Services 281 N.College Ave Fort Collins,CO 80522 970.221.6760 970.224.6134 -fax Building Permit #:B2101039 Issued Full:02/10/2021 Permit Type:Residential Water Heater Site Address:3342 GUNNISON DR Job Valuation:$2,424.00 Category:Residential Signature:Print Name:Date: Form Revised Oct 2010 Transactions Method Check Number Date Paid Amount Paid Comments Trust Account 02/10/2021 $121.36 Receipt issued:02/10/2021 Total Paid to Date:$121.36 Fee Description Account Code Fee Amount Amount Paid Date Paid Amount Due City Sales/Use Tax 251.122030 $46.66 $46.66 02/10/2021 $0.00 County Sales/Use Tax 100.217030 $9.70 $9.70 02/10/2021 $0.00 Permit Flat Fee -$65 1000.422010 $65.00 $65.00 02/10/2021 $0.00 TOTAL FEES:$121.36 $121.36 $0.00 TOTAL BALANCE DUE AS OF 02/10/2021:$0.00 Community Development &Neighborhood Services 281 N.College Ave Fort Collins,CO 80522 970.221.6760 970.224.6134 -fax Building Permit #:B2101039 Issued Full:02/10/2021 Permit Type:Residential Water Heater Site Address:3342 GUNNISON DR Job Valuation:$2,424.00 Category:Residential Fee Amounts are valid for date of this document only.Fees subject to change without notice. Form Revised Oct 2010 Building Permit Over the Counter Application 2. 1.Job site address: 3342 Gunnison Drive, Fort Collins, Colorado 80526 2.Property owner name: Jeffrey Douglass 3.Property owner address: Street Address: : 3342 Gunnison Drive City: : Fort Collins State: : Colorado Zip: : 80526 4.Property owner phone number: 970-223-9634 5.Project type: Residential 6.What type of residential? Single Family Detached 7.Value of work (Labor and Materials)($): 2424.00 8.Type of permit: Water Heater and HVAC Please note: each individual lot requires a separate application and permit. Please note: each individual appliance requires a separate application and permit. 9.Unit type: Water Heater 10.Is this new install or a replacement install? Replacement (New unit replacing existing unit) 11.Contractor company name: Allen Plumbing and Heating 12.Contractor company address: 101 S Link Lane, Fort Collins, Colorado 80524 13.Contractor company phone number: 9704947632 02.10.2021 B2101039 14.Contractor company email: christina@allenph.com 15.License number: MP-4 3. Review 17.I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit is not valid until it has been paid and issued. Signature of: Christina Evans Date Signed: 02/09/2021 18.Please include an email address to receive a confirmation and a copy of your answers. christina@allenph.com 4. Thank You! Thank you for submitting your application for processing. To submit another over the counter application, click here.