Loading...
HomeMy WebLinkAboutMAPLE HILL FOURTH REPLAT PHASES 6 AND 7 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2016-07-11DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 13 - 0 V Issuance Date: 3 J/ s-/Z o 13 Project Name: Maple Hill 4`" Replat (Phase 6,7) Project Location: Southeast Corner of Richards Lake Rd and N County Rd 11 City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (payment received 2/08/13) $ paid Construction Inspection Fee (phase 6,7 total paid 3/14/13) $ 21,140.90 (2 checks for the inspection fee- check #1468 and #1469) Total $21,140.90 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 423,822.03 Form of security deposited with the City: Bond PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Ln ZI 3. Construction time restrictions: N/ Development Construction Permit, Page 2/5 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition; this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: N/A Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature: Date: Approval for issuance: ,City Engineer Approv _ Date: (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Maple Hill 4 h Replat (Phase 6,7) Development Engineer: Tyler Siegmund 281 N College Ave, Fort Collins, CO 80524 (970)- 221-6501 Construction Inspector: Steve Cicione 281 N College Ave, Fort Collins, CO 80524 (970)- 692-4418 Current Planner: Ted Shepard 281 N College Ave, Fort Collins, CO 80524 (970)- 221-6343 Water Utilities Engineer: Wastewater Engineer: Mike Scheid, ELCO Mikes@elcowater.oriz Fred Walker, BoxElder (970)- 498 0604 Erosion Control Inspector: Jesse Schlam 700 Wood St, Fort Collins, CO 80521 (970)- 218-2932 Natural Resources: Lindsay Ex 281 N College Ave, Fort Collins, CO 80524 (970)- 221-6501 Traffic Operations: Joe Olson 625 Ninth St, Fort Collins, CO 80524 970-221-6062 Street Closure: Syl Mireles 625 Ninth St, Fort Collins, CO 80524 970-221-6815 Forestry: Tim Buchanan 215 N Mason St, Fort Collins, CO 80524 (970)- 221-6361 Development Construction Permit, Page 5/5 Light and Power: Doug Martine 700 Wood St, Fort Collins, CO 80521 (970)- 221-6700 Developer's Contact Persons: Project Manager: Larry S. Buckendorf, Maple Hill Investments, LLC 7251 W 20t' St #L-200, Greeley, CO 80634 (970) 352-7072 Cell (970) 539-0131 Fax (970) 330-5357 IgM@joumeyhomes.com Developer/Owner: Tom Dougherty, Gellespie Farm Development P.O. Box 272699, Fort Collins, CO 80527 (970) 215-9761 tomd@frii.com Project Engineer/ Architect/Planner: Jason Claeys, P.E. JVA Consulting Engineers 25 Old Town Square, Suite 200, Fort Collins, CO 80524 (970) 225- 9099 Cell (970) 530-0818 Fax (970) 330-6044 jclaeys@jvajva.com General Contractor: Joe Schumacher, Crow Creek Construction LLC 7251 W 20t' St, L-200, Greeley, CO 80634 (970) 330-5070 Cell (970) 397- 9880 Fax (970) 330- 6044 Joe@Crow-Creek.com �{(�((����� pp8p8pp8p8ppQ$Qp8p8p $88S8o8oS8po8ppp8p8pp8p N8�p8p$QpQ8�88 � �!B �y �Q� NNNNMNN C�' '����i►H �1yNNO! ���~NNNN ��]� K �S o0pp8p8 D LL m !+ h 1i7 lil Y'f 1� h h F. h. �t1 O O of O O vi � c?er 401. to W� o z -- m Y. �* z �� 8gsss8s a88s888$$$�0 8 •�888s8 � i0 M N N N M O= O go WFF o m 8 8 Milian W we v- F �r M w O � K Y D ^ al U. AL>: x ILLL.ILLLLL W W i xx= plL IL IL LL IL: Y. IL 09 JJciti C) JJJJJ YI-J _3mJui uiN Wa Z LL F e W z0 3U W V O O 40 � � V ~� gg $ �_tt�1� tff�' WO n e v -1 wl 10101al 91 p D *I wl R14 Rl al AlMl Rl 4141 al 8 4 p Rl 91 p w 'if Ill '11,11 4 1 W F i$ i C