Loading...
HomeMy WebLinkAboutCSU PARKING LOT, FINAL UTILITY PLANS - SITE PLAN ADVISORY REVIEW - SPA150004 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS4'5'#4%*$.8&2#4-+0).16241,'%6Ä 76+.+6;2.#05(14 .1%#6'&+06*'5176*1(5'%6+1061905*+20146*4#0)'9'561(6*'5+:6*24+0%+2#./'4+&+#0 %+6;1((146%1..+05%1706;1(.#4/+'456#6'1(%1.14#&1 .1%#6'&+06*'%+6;1((146%1..+05 PROJECT DATUM: NAVD88 BENCHMARK #1 B.M.NUMBER: 14-97 DESCRIPTION: CITY OF FORT COLLINS VERTICAL CONTROL, 14-97, APPROXIMATELY 100 FEET WEST OF THE INTERSECTION OF CENTRE AVE. AND RESEARCH BLVD., ON THE WEST END OF THE SOUTH HEADWALL ON CENTRE AVE. ELEV. = 5051.76 BENCHMARK #2 B.M. NUMBER: 21-92 DESCRIPTION: CITY OF FORT COLLINS VERTICAL CONTROL, 21-92, NORTHWEST CORNER OF WEST DRAKE RD. AND RESEARCH BLVD., ON A POWER TOWER BASE. ELEV.= 5042.84 /#; PROJECT LOCATION VICINITY MAP 5*''6+0&': C0.01 COVER SHEET Ditesco, LLC Keith Meyer, PE (970) 988-8605 1315 Oakridge Drive, Suite 120 Fort Collins, Colorado 80525 Colorado State University Parking and Transportation Services Fort Collins, Colorado 805213-6030 Laura Bently (970) 568-6596 INDEX NO. SHEET NO. 1 GRADING PLAN- NORTH %106#%6+0(14/#6+10 $'0%*/#4-5 5 6 C3.02 4 C3.01 3 C2.01 DEMOLITION PLAN 7 2 C0.02 LEGENDS & ABBREVIATIONS TST, Inc. Consulting Engineers 760 Whalers Way Building C, Suite 200 Fort Collins, Colorado 80525 (970) 226-0557 Connell Resources, Inc. John Warren 7785 Highland Meadows Parkway Suite 100 Fort Collins, Colorado 80528 C1.01 GENERAL NOTES SITE PLAN- NORTH OVERALL UTILITY PLAN EROSION CONTROL STORM PLAN & PROFILE T.B. THRUST BLOCK VERTICAL CURVE WATER LINE WITH TYPICAL V.C. W/L w/ TYP. STORM SEWER STATION SANITARY SEWER RIGHT OF WAY POINT OF VERTICAL INTERSECTION POLYVINYL CHLORIDE (PIPE) POINT OF TANGENCY POINT OF REVERSE CURVE POINT OF INTERSECTION POINT OF CURB RETURN POINT OF CURVATURE MINIMUM MANHOLE LOW POINT LINEAL FEET HIGH POINT GATE VALVE FLOW LINE FIRE HYDRANT END VERTICAL CURVE BEGIN VERTICAL CURVE MIN. ST STA. SEWER R.O.W. P.V.I. P.V.C. P.T. P.R.C. P.I. P.C.R. P.C. M.H. LP L.F. HP GTV F.H. E.V.C. B.V.C. FL MRJ (ABBR) MECHANICALLY RESTRAINED JOINT B.O. BLOW OFF F.G. FINISHED GRADE F.F. FINISHED FLOOR N.T.S. NOT TO SCALE CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: May 5, 2015 Appendix E-2 Construction Notes NOTE: Appendix Forms and Information are for Reference Only. Contact LocalEntityEngineer for Original Forms and Current Information. A. Standard Grading and Erosion and Sediment Control Construction Plan Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights- of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Local Entity. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall clean up any inadvertent deposited material immediately and make sure streets are free of all materials by the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, EX. ACCESS RAMP AND WALK UP TO TENNIS FACILITY TO BE MAINTAINED EX. C&G AND SIDEWALK TO BE REMOVED AND REPLACED. 1. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ARE APPROXIMATE AND SHOULD BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 100 1"=100' B. Renz K. Geiger-Lee NTS C2.01 DEMOLITION PLAN 4 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 May 5, 2015 PROPOSED SWALE SSMH TOP CTR=5037.49 INV OUT NW=5025.26 LARIMER COUNTY #2 CANAL RESEARCH BLVD. COLORADO STATE UNIVERSITY TENNIS COMPLEX PHEMISTER RD. GILLETTE DR. CROSS DR. EX WALK EX WALK EX. 8" SEWER 38.0' 24.0' (TYP.) 19.0' (TYP.) 32.0' FL-FL 32.6' FL-FL 32.0' FL-FL 8.5' (TYP.) 38.0' 24.0' (TYP.) 19.0' (TYP.) 24.0' (TYP.) 24.0' (TYP.) 24.0' (TYP.) 38.0' 38.0' 19.0' (TYP.) 24.0' (TYP.) 17.0' 12.0' 12.0' 8.5' (TYP.) 8.5' (TYP.) 9.0' (TYP.) 9.0' (TYP.) 8.5' (TYP.) 24.0' (TYP.) 19.0' RESEARCH BLVD. LARIMER COUNTY #2 CANAL GILLETTE DR. RESEARCH BLVD. 32.0' FL-FL 19.0' (TYP.) 38.0' 32.0' FL-FL 36' FL-FL 24.0' (TYP.) 24.0' (TYP.) 35.8' FL-FL 24.0' (TYP.) 38.0' 24.0' (TYP.) 38.0' 19.0' (TYP.) 24.0' (TYP.) 17.0' 12.0' 12.0' BUS STOP/ LOADING ZONE 15'x40' PROPOSED ADDITIONAL BIKE PARKING PROPOSED DRIVE ENTRANCE PROPOSED 1.5' VERTICAL C&G ISLANDS (TYP.) PROPOSED 1.5' VERTICAL C&G ISLANDS (TYP.) PROPOSED SWALE PROPOSED CULVERT FOR LARIMER COUNTY CANAL #2 CROSSING PROPOSED SWALE PROPOSED INLET PROPOSED 2.5' VERTICAL C&G PROPOSED SWALE 24.0' (TYP.) 24.0' (TYP.) 38.0' 24.0' SSMH TOP CTR=5037.49 INV OUT NW=5025.26 EX WALK EX. 45' DRAINAGE, ACCESS, & UTIL. ESMT. EX. 8" SEWER PROPOSED DRIVE ENTRANCE PROPOSED SWALE EX. SSMH 8.0' 5.0' 8.0' (TYP.) 16.3' 16.3' 11.8' 12.4' 4.8' EX. SSMH PROPOSED 5' WIDE ADA PAD FROM EX. BOC TO EX. DETACHED WALK 2% 0.86% 2.22% 2.29% 0.5% 1.95% 1.8% 2.27% 2.5% 2.22% 2.68% 0.36% 43.67 42.80 40.94 40.85 40.32 42.84 41.20 43.64 43.65 41.51 41.64 42.91 42.67 42.73 43.76 44.09 42.44 EX. 41.81 41.93 EX. 42.18 EX. 43.21 42.65 41.85 40.99 40.37 42.11 42.17 43.53 RESEARCH BLVD. 36' FL-FL EX. DRIVE ENTRANCE TO REMAIN 8.50' (TYP.) 1.0% 2.06% 2.06% 1.4% 1.22% 1.2% 2.0% 0.50% 0.19% 40.72 40.25 38.81 39.35 39.40 40.24 39.72 42.18 42.13 42.18 40.14 EX. 39.90 EX. 38.95 EX. 39.37 40.18 39.77 40.24 40.82 40.22 40.20 40.74 39.33 39.77 39.58 EX. 39.45 39.55 38.89 40.23 40.12 39.91 40.78 39.12 38.95 38.97 39.27 41.03 39.71 38.41 43.00 40.83 40.86 39.55 41.99 39.08 39.71 39.80 40.74 39.39 46.76 EX WALK 32.00' FL-FL PROPOSED DRIVE ENTRANCE 5' WALK 5' WALK EX. 4' WALK 43.20 2.22% 1.93% 2.32% 2.0% 2.03% 2.78% 0.50% 2.22% 0.75% 2.27% 2.86% 0.8% 2.11% 3.66% .05% 0.46% 41.83 42.22 42.31 42.31 41.48 40.32 41.89 41.65 41.97 41.63 42.21 40.65 40.69 41.66 43.19 43.17 42.93 43.28 43.25 42.92 43.03 42.95 42.93 42.93 42.97 42.84 42.76 42.88 42.58 42.31 42.22 42.29 41.98 41.23 40.61 41.36 40.96 41.59 SSMH TOP CTR=5037.49 INV OUT NW=5025.26 PROPOSED SWALE PROPOSED SWALE EXISTING MAINTENANCE ACCESS EXISTING SWALE TO BE MAINTAINED SEE DETAIL D-46 FOR NEW OUTLET STRUCTURE. EXISTING BOX CULVERT EXISTING TREES WITHIN POND TO BE RELOCATED BY CSU EX. SDMH PROVIDE NEW 100-YR WSEL LINE AT ELEVATION 5036.08 INSTALL DRIVE ENTRANCE PER CITY OF FORT COLLINS DETAIL D-14 CROSS DR. DETENTION POND $3352;92/80( 4.9“$&)7 100-YR WSEL = 5036.08 1 1 1 1 1 1 1 2 2 2 2 5 5 5 6 6 6 6 6 2 EX. 18" STORM EX. 18" STORM TIE TO EX. WALK CONTRACTOR TO PROVIDE 15' WIDE MAINTENANCE ROAD FOR SANITARY SEWER ACCESS PROPOSED SWALE 8 8 30.60 43.67 42.80 40.41 40.94 40.85 39.58 40.32 42.84 41.20 40.35 39.52 PROPOSED SWALE PROPOSED SWALE PROPOSED SWALE INSTALL DRIVE ENTRANCE PER LCUASS 707.2 PROPOSED BOX CULVERT FOR LARIMER COUNTY CANAL #2 CROSSING. UNDER DESIGN. INSTALL DRIVE ENTRANCE PER CITY OF FORT COLLINS DETAIL D-14 EXISTING SIDEWALK CHASE PROPOSED SWALE EXISTING TREES TO BE MAINTAINED EXISTING PARKWAY TREES ALONG RESEARCH BLVD. TO BE MAINTAINED EX. BLDG PROPOSED MAINTENANCE ACCESS DRIVEWAY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 5 5 5 5 5 5 5 5 5 5 5 5 RESEARCH BLVD. PROPOSED SWALE CONNECT TO EX. DRIVE ENTRANCE EXISTING INLET EXISTING PARKWAY TREES ALONG RESEARCH BLVD. TO BE MAINTAINED 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 2 2 2 2 2 7 7 2 2 2 1 2 TIE TO EX. WALK CONTRACTOR TO RE-GRADE AREA BETWEEN BACK OF CURB AND EXISTING WALK AS NEEDED TO PROVIDE ADEQUATE DRAINAGE. EX. TREES TO BE PROTECTED IN PLACE. 8 10 43.46 43.28 42.25 41.26 41.44 39.58 41.25 40.55 40.72 40.25 42.88 42.06 38.81 39.35 43.28 42.28 39.53 40.42 42.89 41.19 40.46 43.64 40.24 39.40 41.48 39.47 40.39 41.16 EXISTING SWALE TO BE MAINTAINED &'6'06+10 210& #2241:+/#6'.+/+65 1(%105647%6+10 RESEARCH BLVD. PROPOSED SWALE SSMH TOP CTR=5037.49 INV OUT NW=5025.26 5036 5037 5039 5041 5040 5039 5041 5042 5043 5044 5043 5043 5041 5039 5041 5044 5039 5041 5043 5041 5044 5043 5041 5043 5043 5036 5039 5040 5035 5033 5034 5039 5043 5040 5040 5040 5040 5040 5041 5042 5041 5040 5043 5043 5042 5041 5040 5040 5039 5038 CENTRE AVE. SSMH TOP CTR=5037.49 INV OUT NW=5025.26 COLORADO STATE SSMH TOP CTR=5037.49 INV OUT NW=5025.26 016'5 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz May 5, 2015 K. Geiger-Lee NTS C7.01 STORM PLAN & PROFILES 16 scale feet 50 0 50 100 1"=50' HORIZONTAL 1"=5' VERTICAL PROPOSED EXISTING SURFACE SURFACE PROPOSED SURFACE EXISTING SURFACE PROPOSED EXISTING SURFACE SURFACE 016'5 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz May 5, 2015 K. Geiger-Lee NTS C7.02 STORM PLAN & PROFILES 17 scale feet 50 0 50 100 1"=50' HORIZONTAL 1"=5' VERTICAL PROPOSED EXISTING SURFACE SURFACE PROPOSED SWALE SSMH TOP CTR=5037.49 INV OUT NW=5025.26 RESEARCH BLVD. COLORADO STATE UNIVERSITY TENNIS COMPLEX GILLETTE DR. CROSS DR. EX WALK 9.0' (TYP.) 5.00' 8.00' CENTRE AVE. 4" WIDE WHITE PARKING STRIP (TYP.) INSTALL STOP SIGN R1-1 INSTALL STOP SIGN R1-1 INSTALL STOP SIGN R1-1 INSTALL RESERVED PARKING SIGNS R7-8 WITH "VAN-ACCESSIBLE" PLAQUE INSTALL RESERVED PARKING SIGNS R7-8 INSTALL CROSSWALK STRIPES INSTALL BIKE LANE SYMBOLS 4" SOLID DOUBLE YELLOW CENTERLINE STRIPE INSTALL RESERVED PARKING SIGNS R7-8 INSTALL RESERVED PARKING SIGNS R7-8 WITH "VAN-ACCESSIBLE" PLAQUE 4" SOLID WHITE BIKE LANE STRIPE 4" SOLID DOUBLE YELLOW CENTERLINE STRIPE 62' REMOVE STRIPING ON CENTER AVE. THROUGH INTERSECTION. BIKE LANE ON WEST SIDE OF STREET TO REMAIN. 73' REMOVE STRIPING ON GILETTE DR. THROUGH INTERSECTION. BIKE LANE ON EAST SIDE OF STREET TO REMAIN. RELOCATED BUS SIGN RESERVED PARKING SYMBOLS AND STRIPING (TYP.) RESERVED PARKING SYMBOLS AND STRIPING (TYP.) RESERVED PARKING SYMBOLS AND STRIPING (TYP.) MOTORCYCLE PARKING AREA MOTORCYCLE PARKING AREA INSTALL TRANSFORT NO PARKING SIGN INSTALL TRANSFORT NO PARKING SIGN 1. TURN LANE STRIPING ON RESEARCH BLVD AND ON GILLETTE DRIVE TO BE PROVIDED WITH FINAL CONSTRUCTION PLANS. 2. OWNER TO PROVIDE MOTORCYCLE AND RESEARCH BLVD. LARIMER COUNTY #2 CANAL GILLETTE DR. RESEARCH BLVD. 24.0' (TYP.) 40' 4" WIDE WHITE PARKING STRIP (TYP.) INSTALL STOP SIGN R1-1 INSTALL STOP SIGN R1-1 INSTALL STOP SIGN R1-1 EX. MONUMENT SIGN TO BE RELOCATED. CONTRACTOR TO COORDINATE WITH OWNER. REFER TO BLOWUP THIS SHEET FOR SOUTH BOUND LEFT TURN LANE STRIPING INSTALL RESERVED PARKING SIGNS R7-8 WITH "VAN-ACCESSIBLE" PLAQUE INSTALL RESERVED PARKING SIGNS R7-8 INSTALL CROSSWALK STRIPES INSTALL BIKE LANE SYMBOLS 4" SOLID DOUBLE YELLOW CENTERLINE STRIPE INSTALL STOP BAR 4" SOLID DOUBLE YELLOW CENTERLINE STRIPE REMOVE STRIPING ON RESEARCH BLVD. THROUGH INTERSECTION. 73' REMOVE STRIPING ON GILETTE DR. THROUGH INTERSECTION. BIKE LANE ON EAST SIDE OF STREET TO REMAIN. RESERVED PARKING SYMBOLS AND STRIPING (TYP.) MOTORCYCLE PARKING AREA 1. TURN LANE STRIPING ON RESEARCH BLVD AND ON GILLETTE DRIVE TO BE PROVIDED WITH FINAL CONSTRUCTION PLANS. 2. OWNER TO PROVIDE MOTORCYCLE AND HANDICAP PARKING SIGNS, CONTRACTOR TO INSTALL. 3. OWNER TO PROVIDE THERMOPLASTIC BIKE LANE MARKERS, CONTRACTOR TO INSTALL. 4. ALL TRANSFORT SIGNAGE TO BE INSTALLED BY TRANSFORT. /#6%*.+0'5''5*''6% May 5, 2015 CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: April 20, 2015 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz K. Geiger-Lee NTS C9.01 CONSTRUCTION DETAILS 20 April 20, 2015 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz K. Geiger-Lee NTS C9.02 CONSTRUCTION DETAILS 21 April 20, 2015 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz K. Geiger-Lee NTS C9.03 CONSTRUCTION DETAILS 22 RAIN GARDEN COLLECTION AREA 1.5FT ISLAND INFALL CURB & GUTTER WITH CURB CUT DETAIL SCALE = NTS RAIN GARDEN COLLECTION AREA TYPICAL SECTION SCALE = NTS 2'-0" TOP OF CURB FLOWLINE LIP OF GUTTER SIDE VIEW 6" CURB & GUTTER WITH 2FT INLET OPENING 12.0 ft 2.0 ft 5.0 ft 2.0 ft 8" TOC 4939.50 INV 4937.51 TOC 4941.00 INV 4937.45 0.5% 20" TYP #4 L @ 12" O.C. #4 L @ 12" O.C. TYP WALLS #4 L @ 12" O.C. TYP WALLS ALL #4 @ 12" OC EW 10" TYP #4 L @ 12" O.C. TYP WALLS 18" RCP CL IV 11 SPECIAL INLET (1B) SCALE DETAIL = NTS B. Renz April 20, 2015 K. Geiger-Lee NTS C9.04 ONSTRUCTION DETAILS 23 SHEET NO PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 April 20, 2015 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz K. Geiger-Lee NTS C9.05 CONSTRUCTION DETAILS 24 MODIFIED OUTLET STRUCTURE ELEV A (POND INV) ELEV B (WQCV INV) ELEV C ELEV D SPILL ELEV Dwq (12" MIN) Ls Ws Wo WQ HOLE DIA WQ # OF ROWS WQ # OF COLUMNS Do 5030.60 5032.70 5036.08 5036.50 6' 5030.60 6' 9" 2.10' 1.524" 4 2 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz K. Geiger-Lee NTS C9.06 CONSTRUCTION DETAILS April 20, 2015 C9.06 25 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz K. Geiger-Lee NTS C9.07 CONSTRUCTION DETAILS April 20, 2015 26 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 B. Renz K. Geiger-Lee NTS C9.08 CONSTRUCTION DETAILS April 20, 2015 27 Stabilized Staging Area (SSA) SM-6 November 2010 Urban Drainage and Flood Control District SSA-3 Urban Storm Drainage Criteria Manual Volume 3 SM-6 Stabilized Staging Area (SSA) SSA-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 PROPOSED SWALE SSMH TOP CTR=5037.49 INV OUT NW=5025.26 LARIMER COUNTY #2 CANAL RESEARCH BLVD. COLORADO STATE UNIVERSITY TENNIS COMPLEX PHEMISTER RD. GILLETTE DR. CROSS DR. EX. 8" SAINTARY 19.0' (TYP.) 32.6' FL-FL 8.5' (TYP.) 24.0' (TYP.) PROPOSED DRIVE ENTRANCE 9.0' (TYP.) 24.0' (TYP.) 19.0' (TYP.) 8.5' (TYP.) EX. DRIVE ACCESS FOR LARIMER COUNTY #2 CANAL EX. FH EX. TENNIS FACLIITY FENCE 8.5' (TYP.) 9.0' (TYP.) CENTRE AVE. SIGHT DISTANCE TRIANGLE SIGHT DISTANCE TRIANGLE 660' 660' 660' 1. B40 TURNING TEMPLATES SHOWN IN PARKING LOT. 2. SIGHT DISTANCE TRIANGLES LENGTHS ARE LABELED ON THE DRAWINGS. TOTAL SPACES = 909 HANDICAP PARKING = 18 (3 VAN-ACCESSIBLE) 2 MOTORCYCLE PARKING AREAS 1-15'x40' BIKE PARKING PAD 11' TRAVEL LANE 5' BIKE 2.5' PROPOSED SWALE RESEARCH BLVD. LARIMER COUNTY #2 CANAL GILLETTE DR. DRAKE RD. RESEARCH BLVD. DOWLARK AVE. 8.5' (TYP.) 24.0' (TYP.) 19.0' (TYP.) 8.5' (TYP.) EX. DRIVE ENTRANCE TO REMAIN EX. TENNIS FACLIITY FENCE 8.5' (TYP.) 9.0' (TYP.) SIGHT DISTANCE TRIANGLE SIGHT DISTANCE TRIANGLE 450' 660' 660' TOTAL SPACES = 909 HANDICAP PARKING = 18 (3 VAN-ACCESSIBLE) 2 MOTORCYCLE PARKING AREAS 1-15'x40' BIKE PARKING PAD 1. B40 TURNING TEMPLATES SHOWN IN PARKING LOT. 2. SIGHT DISTANCE TRIANGLES LENGTHS ARE LABELED ON THE DRAWINGS. 11' TRAVEL LANE 5' BIKE 2.5' C&G VARIES 6' WALK 2% MIN HEAVY DUTY CONCRETE PAVING 11' TRAVEL LANE 5' BIKE 2.5' C&G VARIES 6' E1 PROJECT #14-031 RESEARCH BLVD PARKING LOT PROJECT K:\WORKING PROJECTS\South Campus\Research Drive Parking Lot\Research Dr Parking Lot E1.dwg, 3/30/2015 8:48:19 AM E2 PROJECT #14-031 RESEARCH BLVD PARKING LOT PROJECT K:\WORKING PROJECTS\South Campus\Research Drive Parking Lot\Research Dr Parking Lot E1.dwg, 3/30/2015 8:48:45 AM E3 PROJECT #14-031 RESEARCH BLVD PARKING LOT PROJECT SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.01 IRRIGATION COVER SHEET GENERAL DESCRIPTION GENERAL NOTES IRRIGATION LEGEND H Q A-1 1" 15 - E SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.02 IRRIGATION FLAG NOTES FLAG NOTES 1 2 3 4 5 6 10 7 8 9 11 12 13 14 15 16 17 18 CENTER AVE CENTER AVE RESEARCH BLVD. 5 6 3" 2.5" 3" 7 7 10 2" 9 13 13 13 12 TYP. 12 TYP. 12 TYP. 12 TYP. 13 1.5" 1.25" 1.25" 1.25" 2" 2" 2" 2" 2" 1.5" 1.5" 1.25" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 16 3" 1.25" 2.5" 2.5" 2.5" 2" 1.5" 1.5" 4" HDPE IRRIGATION CONTROLLER *OBTAIN FROM OWNER *REQUIRES 120 VAC POWER *REQUIRES ETHERNET CABLE POINT-OF-CONNECTION SIZE: 4-INCH FLOW: 200 GPM MIN. PRESSURE: 70-75 PSI RESEARCH BLVD. RESEARCH BLVD. 1 2 3 4 7 7 7 8 13 13 12 TYP. 3" 2.5" 2" 2.5" 2" 2" 2" 2" 1.5" 2" 1.5" 2" 1.25" 1.5" 1.25" 1.5" 1.25" 2.5" 2.5" 1.25" 2" 1.25" 2" 2" 2" 2" 2" 2" 1.5" 3" 2.5" 2.5" 2" 1.25" 4 PVC" 3" 3" 3" 3" 3" RESEARCH BLVD. 7 11 13 12 TYP. 1.5" 1.25" 2" 2" 1.5" 1.5" 1.5" 1.5" 1.25" 3" 3" 3" 3" 3" 3" 3" 3" 17 18 2" 1.5" 1.5" 1.25" 1.25" 2" 1.5" 1.25" 1.25" 1.25" E E E Q Q Q SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.05 IRRIGATION PLAN 1" = 30' 0' 15' 30' 60' SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.06 1 ISOLATION GATE VALVE ASSEMBLY (3-INCH AND LARGER) N.T.S. 2 ISOLATION GATE VALVE ASSEMBLY (2-1/2-INCH AND SMALLER) N.T.S. 3 QUICK COUPLING VALVE ASSEMBLY N.T.S. Q 4 REMOTE CONTROL VALVE ASSEMBLY N.T.S. IRRIGATION DETAILS SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.07 2 POP-UP SPRAY SPRINKLER ASSEMBLY N.T.S. 3 IRRIGATION CONTROLLER ASSEMBLY N.T.S. IRRIGATION DETAILS 1 BLOW OUT ASSEMBLY N.T.S. SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.08 4 SLEEVE DETAIL N.T.S. SLEEVE TABLE MAINLINE PIPE SIZE (INCHES) SLEEVE SIZE (INCHES) SLEEVE MATERIAL NOTES IRRIGATION DETAILS 1 IRRIGATION CONTROLLER GROUNDING DETAIL N.T.S. 3 TRENCH DETAIL N.T.S. A 2 RISER DETAIL N.T.S. SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.09 IRRIGATION DETAILS 1 CASING SPACER DETAIL N.T.S. 2 THRUST BLOCK DETAIL N.T.S. 3 HYDROMETER ASSEMBLY N.T.S. X WIRE THRUST BLOCK UNDISTURBED SOIL Y THRUST BLOCK SURFACE AREA (SF) AGAINST UNDISTURBED SOIL (X x Y)=(SF) à FITTING SIZE ƒ%(1' (SF) ƒ%(1' (SF) ƒ%(1' (SF) ƒ%(1' (SF) TEE OR DEAD END (SF) H SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 LNS/JB LNS LNS 15069 E-0.0 SCHEDULES & DETAILS W S S VB VB VB VB EB ET E E SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 LNS/JB LNS LNS 15069 E-1.0 ELECTRICAL SITE PLAN - NORTH GENERAL SITE NOTES: E SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 LNS/JB LNS LNS 15069 E-1.1 ELECTRICAL SITE PLAN - SOUTH GENERAL SITE NOTES: 30' MATCHLINE SEE SHEET L4.04 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 12 TYP. 4" HDPE 1.25" 3" 2" 2.5" 2" 1.25" 1.25" 3" 2" 1.5" 1.25" 2" 2" 1.5" 1.5" 1.25" 1.25" 1.25" 2" 2.5" 2.5" 2" 2" 2" 1.5" 2" 1.5" 1.5" 1.25" 1.25" 1.25" 2" 1.5" 1.25" 1.25" 2" 2.5" 2" 1.25" 2.5" 2" 2" 2" 1.5" 1.5" 1.25" 1.25" E E E E H Q E E E E E E E Q Q A-16 2" 80 - A-15 2" 91 - A-13 2" 55 - A-14 2" 95 - A-11 2" 69 - A-12 1.5" 48 - A-9 2" 88 - A-10 1.5" 53 - 14 14 A-7 1" 6 - A-8 2" 96 - Q Q Q Q 15 15 SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.04 IRRIGATION PLAN 1" = 30' 0' 15' 30' 60' 30' MATCHLINE SEE SHEET L4.05 MATCHLINE SEE SHEET L4.03 1.25" 1.25" 1.25" 2.5" 1.25" 1.25" 1.25" 2" 2" 1.5" 2" 1.5" 1.25" 1.25" 3" 1.5" 2" 1.5" 1.25" 1.5" 1.25" 1.25" 1.25" Q Q Q Q Q Q E E Q Q Q A-3 2" 95 - A-2 1" 22 - A-1 1" 20 - 14 A-5 1.5" 41 - A-4 2" 78 - Q 15 15 A-6 2" 85 - 1.5" 1.25" 1.25" 1.25" 1.25" 1.25" SHEET NO. PROJECT NO. DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: REFER TO PLANS SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: 4/27/2015 (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO NONE RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CBK JHK JHK L4.03 1" = 30' 0' 15' 30' 60' 30' MATCHLINE SEE SHEET L4.04 IRRIGATION PLAN WALK 2% MIN /#6%*.+0'5''5*''6% CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: B. Renz K. Geiger-Lee NTS C11.02 PFA TRAVEL & SITE DISTANCE PLAN- SOUTH 32 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 scale feet 80 0 80 160 1"=80' May 5, 2015 450'-570' C&G VARIES 6' WALK 2% MIN HEAVY DUTY CONCRETE PAVING 11' TRAVEL LANE 5' BIKE 2.5' C&G VARIES 6' WALK 2% MIN /#6%*.+0'5''5*''6% CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: B. Renz K. Geiger-Lee NTS C11.01 PFA TRAVEL & DISTANCE PLAN- NORTH 31 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 May 5, 2015 scale feet 80 0 80 160 1"=80' 470' CHECKED BY: B. Renz K. Geiger-Lee NTS C8.02 SIGNAGE & STRIPING PLAN- SOUTH 19 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 scale feet 80 0 80 160 1"=40' 40 40 80 15 ft 155 ft 160 ft RESEARCH BOULEVARD 155' LEFT TURN LANE 160' TAPER TRANSITION 4" DBL YELLOW 8" WHITE 12 ft 8" WHITE REMOVE STRIPING THROUGH INTERSECTION 28 ft 150' TRANSITION; 6" WHITE PREFORMED THERMOPLASTIC ARROWS (TYP) HANDICAP PARKING SIGNS, CONTRACTOR TO INSTALL. 3. OWNER TO PROVIDE THERMOPLASTIC BIKE LANE MARKERS, CONTRACTOR TO INSTALL. 4. ALL TRANSFORT SIGNAGE TO BE INSTALLED BY TRANSFORT. /#6%*.+0'5''5*''6% CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: B. Renz K. Geiger-Lee NTS C8.01 SIGNAGE & STRIPING PLAN- NORTH 18 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 May 5, 2015 scale feet 80 0 80 160 1"=40' 5036 5037 5035 5042 5041 5040 5037 5038 5039 5039 5043 1. DURING CONSTRUCTION, ACCESS TO AND FROM THE SITE IS TO BE PROVIDED WITH A TEMPORARY VEHICLE TRACKING CONTROL PAD OR OTHER APPROVED METHOD. A TYPICAL DETAIL FOR A TRACKING PAD IS SHOWN ON THE DETAIL SHEETS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE SEDIMENT IS NOT TRACKED ON TO ROADWAYS WHERE THERE IS A POTENTIAL FOR DISCHARGE TO STORM WATER DRAINAGE FACILITIES. 2. ALL GRADING AND CONSTRUCTION ACTIVITIES ON THIS SITE ARE SUBJECT TO THE RESTRICTIONS, TERMS, AND CONDITIONS OF THE GENERAL PERMIT FOR DISCHARGES FROM CONSTRUCTION ACTIVITY ISSUED BY THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING PERMIT COVERAGE, IMPLEMENTING AND MAINTAINING A STORM WATER MANAGEMENT PLAN, SWMP, AND PREVENTING DISCHARGE OF POLLUTANTS TO WATER WAYS. THESE PLANS CONTAIN SOME OF THE POLLUTION PREVENTION METHODS THAT MAY BE USED DURING CONSTRUCTION AND AS REQUIRED BY THE LOCAL JURISDICTION FOR PLAN APPROVAL, BUT NOT ALL MEASURES THAT MAY BE NECESSARY AS CIRCUMSTANCES CHANGE DURING CONSTRUCTION. IT IS THE CONTRACTORS DUTY TO ENSURE COMPLIANCE WITH STATE, LOCAL, AND FEDERAL WATER QUALITY LAWS DURING CONSTRUCTION. 3. DURING CONSTRUCTION, CONTRACTOR SHALL INSTALL BMP'S (I.E. WATTLE DIKES, EROSION CONTROL BLANKETS) TO ALL STEEP SLOPES, AND BETWEEN BUILDING PADS IN ORDER TO REDUCE RUN-OFF VELOCITIES AND MINIMIZE EROSION. FOR SLOPES STEEPER THAN 4:1 CONTRACTOR SHALL INSTALL EROSION CONTROL BLANKETS (ECB). REFER TO GENERAL EROSION CONTROL NOTES ON SHEET C1.01 FOR ADDITIONAL ECB NOTES. scale feet 80 0 80 160 1"=80' B. Renz K. Geiger-Lee NTS C5.01 EROSION CONTROL 14 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 CURB INLET BLOCK AND GRAVEL FILTER WATTLE DIKE (SEDIMENT CONTROL LOG) VEHICLE TRACKING CONTROL PAD CONCRETE WASHOUT AREA SILT FENCE SLOPE PROTECTION - CONTRACTOR TO USE "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. RIPRAP PAD DROP INLET BLOCK AND GRAVEL FILTER SEEDING & MULCHING LIMITS OF DISTURBANCE EROSION CONTROL LEGEND: May 5, 2015 43.46 41.23 41.98 42.01 43.99 43.70 44.17 41.80 39.72 42.44 FL= 38.13 42.05 43.31 43.16 43.06 43.01 43.01 42.26 42.18 42.26 42.13 40.49 EX. 42.18 40.14 EX. 39.90 EX. 38.95 EX. 39.37 40.18 39.77 40.24 40.82 40.22 40.20 40.74 39.33 39.77 39.58 EX. 39.45 39.55 38.89 41.28 42.86 41.17 39.49 41.97 40.44 43.39 40.23 40.12 39.91 40.78 39.12 38.95 38.65 37.07 38.97 39.27 43.17 42.63 42.80 35.43 41.03 39.71 38.41 3.33% 2.22% 1.0% 2.06% 2.06% 1.4% 1.22% 1.2% 2.0% 0.50% 2.86% HP 3.33% 2.75% 2.75% 2.0% 2.0% 2.78% 2.5% 0.5% 0.87% 2.22% 2.5% 2.0% 43.00 41.06 0.19% 41.32 41.34 43.39 43.39 42.38 42.38 41.50 41.49 42.96 42.97 41.31 41.29 40.83 40.86 39.55 41.99 39.08 39.71 39.80 40.74 39.39 46.76 40.26 40.34 40.83 41.20 41.34 41.32 42.29 42.04 42.28 42.63 5041 5042 5041 5040 5043 5043 5042 5041 5040 5042 5041 5040 5037 5038 5039 5039 41.36 6 6 6 10 11 8 10 8 11 10 11 8 /#6%*.+0'5''5*''6% 1.5' C&G 2.5' C&G NOT USED NOT USED ACCESS RAMP 5' SIDEWALK 1 2 3 4 5 6 ž%74$.')'0& 4' CROSSPAN CURB CUT PAN CHASE RAIN GARDEN COLLECTOR ISLAND 8 9 10 7 11 1. ANY LIMITS OF STREET CUT SHOWN ON THESE PLANS ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS . 2. ALL EXISTING UTILITIES ARE APPROXIMATELY SHOWN. BOTH VERTICAL AND HORIZONTAL LOCATION SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. MINIMUM ALLOWABLE PAVEMENT SECTION PER PRELIMINARY GEOTECHINICAL REPORT: 3. ALL SPOT ELEVATIONS SHOWN ARE AT FLOWLINE OF C&G, FLOWLINE OF SWALE, OR SIDEWALK. 4. CONTRACTOR TO MAINTAIN EXISTING GRADE AROUND TREES TO REMAIN IN THE DETENTION POND. SEE LANDSCAPE PLAN FOR TREES THAT ARE TO BE PRESERVED. 5. ALL 2.5' C&GARE INFALL, UNLESS NOTED OTHERWISE. ASPHALT PAVEMENT 4.0 AGGREGATE BASE 6.0 THICKNESS(IN) THICKNESS(IN) 4.0 6.0 AUTOMOBILE PARKING AREAS MAIN TRAFFIC CORRIDORS CONCRETE PAVEMENT THICKNESS(IN) MAIN TRAFFIC 7.5 CORRIDORS B. Renz K. Geiger-Lee NTS C4.03 GRADING PLAN- SOUTH 13 scale feet 0 1"=30' 30 30 60 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 May 5, 2015 INSTALL PERFORATED DRAIN SYSTEM (TYP) - SEE DETAIL INSTALL PERFORATED DRAIN SYSTEM (TYP) - SEE DETAIL 5 5 5 5 5 5 2 2 2 2 2 2 2 2 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 2 2 2 2 5 2 2 2 4 4 TIE TO EX. WALK TIE TO EX. WALK EXISTING SWALE TO BE MAINTAINED CONTRACTOR TO GRADE TEMPORARY ACCESS RAMPS AND WALK TO MEET ADA REQUIREMENTS. RELOCATED PEDESTRIAN BRIDGE. CONTRACTOR TO COORDINATE WITH STRUCTURAL ENGINEER. 5 CONTRACTOR TO COORDINATE WITH CSU FOR TEMPORARY ADA PARKING ALONG GILLETTE DRIVE 10 8 8 8 2 9 2 43.67 42.80 40.41 44.35 44.48 43.57 42.67 41.88 41.03 43.20 40.38 38.57 39.17 38.44 41.83 40.63 35.82 EX 44.21 44.48 43.98 43.90 43.98 43.48 40.96 40.44 39.57 42.22 42.31 40.48 40.25 40.38 40.19 40.80 38.60 38.71 43.28 42.28 39.53 42.31 40.90 40.90 40.76 40.63 40.32 38.13 35.82 EX 36.22 EX. 36.10 EX. 36.02 42.77 44.29 42.53 42.61 40.89 41.83 41.00 38.57 39.52 39.17 39.47 40.39 41.16 43.46 41.23 41.89 38.28 36.01 38.48 43.64 40.27 44.41 44.48 FL= 38.13 43.65 43.03 42.93 42.93 42.08 43.76 42.77 42.74 44.09 44.48 41.65 41.97 41.63 42.21 40.65 40.69 40.30 39.60 39.66 39.15 41.66 43.19 43.17 42.93 43.28 43.25 42.92 43.03 42.95 42.93 42.93 42.97 42.84 42.76 42.88 42.58 42.31 42.22 42.29 41.98 41.23 40.61 41.36 39.99 38.50 40.96 41.59 41.73 40.68 42.32 42.99 42.00 35.96 EOP 36.13 EX. 37.80 37.50 38.57 38.80 38.56 38.84 39.34 39.34 37.91 37.99 37.62 41.97 41.70 44.76 42.69 42.11 42.17 43.53 42.87 42.02 41.25 40.27 44.31 42.53 40.89 41.31 41.87 40.65 41.90 41.40 40.46 40.11 40.25 41.53 42.38 41.71 42.08 43.29 43.40 39.84 EX. 43.07 39.59 EX. 43.22 42.43 42.60 42.88 42.21 36.11 EOP 41.46 FL= 41.45 42.55 41.20 41.03 41.87 EX. 37.89 1.8% 2.2% 2.70% 2.68% 2.68% 0.50% 2.50% 2.0% 2.56% 1.7% 2.7% HP HP 1.74% 0.50% 0.50% 2.5% 2.63% 0.50% 0.80% 0.80% 2.5% 2.22% 1.93% 2.32% 2.0% 2.03% 2.78% 0.50% 1.07% 3.33% 3.33% 3.33% 2.78% 0.75% 2.27% 2.85% 2.85% 2.77% HP 0.8% 2.11% 3.66% .05% 2.88% 2.18% 1.96% 39.71 37.33 41.77 0.46% 41.91 42.41 42.79 EX. 41.97 EX. 42.09 EX. 43.54 42.97 41.89 41.32 41.95 41.95 44.65 43.62 43.62 42.57 41.69 40.18 40.76 43.39 42.38 41.49 42.13 43.40 42.84 43.17 43.35 42.84 42.90 42.68 42.72 42.72 41.52 41.31 41.20 41.20 42.05 42.31 41.59 42.29 42.04 5039 5041 5044 5039 5041 5043 5041 5044 5043 5041 5043 5043 5040 5040 5041 5042 5041 5040 5039 5038 5036 5037 5035 5043 ADA RAMP/ SIDEWALK 6 6 6 6 1 1 2 11 8 11 8 11 8 11 11 8 11 10 11 10 1 DOUBLE TYPE 13 INLET D-44 /#6%*.+0'5''5*''6% /#6%*.+0'5''5*''6% 1. ANY LIMITS OF STREET CUT SHOWN ON THESE PLANS ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS . 2. ALL EXISTING UTILITIES ARE APPROXIMATELY SHOWN. BOTH VERTICAL AND HORIZONTAL LOCATION SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. MINIMUM ALLOWABLE PAVEMENT SECTION PER PRELIMINARY GEOTECHINICAL REPORT: 3. ALL SPOT ELEVATIONS SHOWN ARE AT FLOWLINE OF C&G, FLOWLINE OF SWALE, OR SIDEWALK. 4. CONTRACTOR TO MAINTAIN EXISTING GRADE AROUND TREES TO REMAIN IN THE DETENTION POND. SEE LANDSCAPE PLAN FOR TREES THAT ARE TO BE PRESERVED. 5. ALL 2.5' C&GARE INFALL, UNLESS NOTED OTHERWISE. ASPHALT PAVEMENT 4.0 AGGREGATE BASE 6.0 THICKNESS(IN) THICKNESS(IN) 4.0 6.0 AUTOMOBILE PARKING AREAS MAIN TRAFFIC CORRIDORS CONCRETE PAVEMENT THICKNESS(IN) MAIN TRAFFIC 7.5 CORRIDORS 1.5' C&G 2.5' C&G NOT USED NOT USED ACCESS RAMP 5' SIDEWALK 1 2 3 4 5 6 ž%74$.')'0& 4' CROSSPAN CURB CUT PAN CHASE RAIN GARDEN COLLECTOR ISLAND 8 9 10 7 11 B. Renz K. Geiger-Lee NTS C4.02 GRADING PLAN- NORTH 12 scale feet 0 1"=30' 30 30 60 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 May 5, 2015 INSTALL PERFORATED DRAIN SYSTEM (TYP) - SEE DETAIL INSTALL PERFORATED DRAIN SYSTEM (TYP) - SEE DETAIL INSTALL PERFORATED DRAIN SYSTEM (TYP) - SEE DETAIL 39.52 43.64 40.27 43.65 41.51 41.64 42.91 42.67 42.73 43.76 44.09 42.44 EX. 41.81 41.93 EX. 42.18 EX. 43.21 42.65 41.85 40.99 40.37 39.68 42.11 42.17 43.53 42.87 42.02 41.25 40.27 42.57 43.07 41.13 41.35 2% 0.86% 2.62% 2.22% 2.29% 0.5% 1.95% 1.8% 2.27% 2.5% 2.03% 0.50% 2.22% 2.68% 0.5% 0.59% HP 0.36% 41.91 41.54 42.00 40.41 42.58 43.54 42.97 41.89 41.32 42.45 42.52 42.84 43.19 42.30 42.90 43.56 42.10 43.66 43.98 43.98 43.15 41.99 42.13 5036 5037 5039 5035 5041 5040 5039 5041 5042 5043 5044 5043 5043 5041 5039 5044 5039 5036 5039 5040 5035 5033 5034 5039 5043 5040 5040 5040 6 11 10 EXISTING SPILLWAY TO REMAIN 1 D-44 CONTRACTOR TO MAINTAIN MINIMUM 5' OF COVER OVER EX. SANITARY SEWER LINE May 5, 2015 /#6%*.+0'5''5*''6% 1. ANY LIMITS OF STREET CUT SHOWN ON THESE PLANS ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS . 2. ALL EXISTING UTILITIES ARE APPROXIMATELY SHOWN. BOTH VERTICAL AND HORIZONTAL LOCATION SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. MINIMUM ALLOWABLE PAVEMENT SECTION PER PRELIMINARY GEOTECHINICAL REPORT: 3. ALL SPOT ELEVATIONS SHOWN ARE AT FLOWLINE OF C&G, FLOWLINE OF SWALE, OR SIDEWALK. 4. CONTRACTOR TO MAINTAIN EXISTING GRADE AROUND TREES TO REMAIN IN THE DETENTION POND. SEE LANDSCAPE PLAN FOR TREES THAT ARE TO BE PRESERVED. 5. ALL 2.5' C&GARE INFALL, UNLESS NOTED OTHERWISE. ASPHALT PAVEMENT 4.0 AGGREGATE BASE 6.0 THICKNESS(IN) THICKNESS(IN) 4.0 6.0 AUTOMOBILE PARKING AREAS MAIN TRAFFIC CORRIDORS CONCRETE PAVEMENT THICKNESS(IN) MAIN TRAFFIC 7.5 CORRIDORS 1.5' C&G 2.5' C&G NOT USED NOT USED ACCESS RAMP 5' SIDEWALK 1 2 3 4 5 6 ž%74$.')'0& 4' CROSSPAN CURB CUT PAN CHASE RAIN GARDEN COLLECTOR ISLAND 8 9 10 7 11 B. Renz K. Geiger-Lee NTS C4.01 GRADING PLAN- NORTH 11 scale feet 0 1"=30' 30 30 60 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 INSTALL PERFORATED DRAIN SYSTEM (TYP) - SEE DETAIL INSTALL PERFORATED DRAIN SYSTEM (TYP) - SEE DETAIL 41.73 40.68 42.32 42.99 42.00 42.05 41.97 41.70 41.31 41.87 40.65 41.90 41.40 42.38 41.71 42.08 43.29 43.40 41.28 42.86 43.22 42.43 42.60 42.88 42.21 41.46 FL= 41.45 42.55 41.87 EX. 42.80 42.63 41.77 41.06 42.41 42.79 EX. 41.97 EX. 42.09 EX. 42.57 41.69 41.32 41.34 43.39 43.39 43.40 42.84 43.17 43.35 42.84 42.90 42.68 42.72 42.72 41.52 41.31 41.20 41.20 42.05 42.31 41.59 41.20 41.34 41.32 42.29 42.04 42.28 42.63 5044 5043 5041 5043 5043 5041 5042 5041 5040 5043 5043 )'0'4#.016'5 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. 1. ANY LIMITS OF STREET CUT SHOWN ON THESE PLANS ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS. 2. ALL EXISTING UTILITIES ARE APPROXIMATELY SHOWN. BOTH VERTICAL AND HORIZONTAL LOCATION SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. MINIMUM ALLOWABLE PAVEMENT SECTION PER PRELIMINARY GEOTECHINICAL REPORT: 3. ALL SPOT ELEVATIONS SHOWN ARE AT FLOWLINE OF C&G, FLOWLINE OF SWALE, OR SIDEWALK. 4. CONTRACTOR TO MAINTAIN EXISTING GRADE AROUND TREES TO REMAIN IN THE DETENTION POND. SEE LANDSCAPE PLAN FOR TREES THAT ARE TO BE PRESERVED. 5. ALL 2.5' C&GARE INFALL, UNLESS NOTED OTHERWISE. ASPHALT PAVEMENT 4.0 AGGREGATE BASE 6.0 THICKNESS(IN) THICKNESS(IN) 4.0 6.0 AUTOMOBILE PARKING MAIN AREAS TRAFFIC CORRIDORS CONCRETE PAVEMENT THICKNESS(IN) MAIN TRAFFIC 7.5 CORRIDORS UECNG HGGV 20    ž CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: C3.05 K. Geiger-Lee NTS C3.05 CENTRE NORTH ENTRANCE PLAN 9 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 May 5, 2015 8 C3.04 40.26 40.34 40.83 41.36 5040 5037 5038 5039 5039 )'0'4#.016'5 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. 1. ANY LIMITS OF STREET CUT SHOWN ON THESE PLANS ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS. 2. ALL EXISTING UTILITIES ARE APPROXIMATELY SHOWN. BOTH VERTICAL AND HORIZONTAL LOCATION SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. MINIMUM ALLOWABLE PAVEMENT SECTION PER PRELIMINARY GEOTECHINICAL REPORT: 3. ALL SPOT ELEVATIONS SHOWN ARE AT FLOWLINE OF C&G, FLOWLINE OF SWALE, OR SIDEWALK. 4. CONTRACTOR TO MAINTAIN EXISTING GRADE AROUND TREES TO REMAIN IN THE DETENTION POND. SEE LANDSCAPE PLAN FOR TREES THAT ARE TO BE PRESERVED. 5. ALL 2.5' C&GARE INFALL, UNLESS NOTED OTHERWISE. ASPHALT PAVEMENT 4.0 AGGREGATE BASE 6.0 THICKNESS(IN) THICKNESS(IN) 4.0 6.0 AUTOMOBILE PARKING MAIN AREAS TRAFFIC CORRIDORS CONCRETE PAVEMENT THICKNESS(IN) MAIN TRAFFIC 7.5 CORRIDORS UECNG HGGV 20    ž CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: B. Renz K. Geiger-Lee NTS C3.04 CENTRE SOUTH ENTRANCE PLAN 8 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 C3.05 9 42.87 42.02 41.25 42.57 43.07 41.13 41.35 HP 41.91 41.54 42.00 40.41 42.58 43.54 42.97 41.89 41.32 42.45 42.52 42.84 43.19 42.30 42.90 43.56 42.10 43.66 43.98 43.98 43.15 41.99 42.13 5036 5037 5039 5041 5040 5039 5041 5042 5043 5044 5043 5043 5041 5039 5041 5044 5039 5036 5039 5035 5034 5043 5040 5040 )'0'4#.016'5 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. 1. ANY LIMITS OF STREET CUT SHOWN ON THESE PLANS ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS. 2. ALL EXISTING UTILITIES ARE APPROXIMATELY SHOWN. BOTH VERTICAL AND HORIZONTAL LOCATION SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. MINIMUM ALLOWABLE PAVEMENT SECTION PER PRELIMINARY GEOTECHINICAL REPORT: 3. ALL SPOT ELEVATIONS SHOWN ARE AT FLOWLINE OF C&G, FLOWLINE OF SWALE, OR SIDEWALK. 4. CONTRACTOR TO MAINTAIN EXISTING GRADE AROUND TREES TO REMAIN IN THE DETENTION POND. SEE LANDSCAPE PLAN FOR TREES THAT ARE TO BE PRESERVED. 5. ALL 2.5' C&GARE INFALL, UNLESS NOTED OTHERWISE. ASPHALT PAVEMENT 4.0 AGGREGATE BASE 6.0 THICKNESS(IN) THICKNESS(IN) 4.0 6.0 AUTOMOBILE PARKING MAIN AREAS TRAFFIC CORRIDORS CONCRETE PAVEMENT THICKNESS(IN) MAIN TRAFFIC 7.5 CORRIDORS UECNG HGGV 20    ž CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: B. Renz K. Geiger-Lee NTS C3.03 RESEARCH ENTRANCE PLAN 7 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 (TYP.) 19.0' (TYP.) 19.0' (TYP.) 19.0' (TYP.) 40' 8.5' (TYP.) 8.5' (TYP.) 24.0' EX. INLET EX. DRIVE ENTRANCE TO REMAIN APPROXIMATE CENTERLINE OF DITCH TOE OF DITCH TOP OF DITCH 19.0' (TYP.) 8.5' (TYP.) 5.0' PROPOSED LIGHT POLE (TYP.) 8.5' (TYP.) 8.5' (TYP.) 8.5' (TYP.) 6.0' 8.5' (TYP.) PROPOSED MOTORCYCLE PARKING AREA 8.5' 8.0' PROPOSED ACCESS RAMP ON EAST SIDE OF GILLETTE DRIVE FOR PEDESTRIAN CROSSING 9.0' (TYP.) ACCESS RAMP, TYP. 5' WALK 5' WALK EX. 4' WALK 6.0' 8.0' PROPOSED 2.5' VERTICAL C&G PROPOSED 2.5' VERTICAL C&G PROPOSED 2.5' VERTICAL C&G 5' SIDEWALK (TYP.) R5.00' R=13.0' TYP. R=10.0' TYP. R=3.0' TYP. R=3.0' TYP. R=5.0' TYP. R=3.0' TYP. HEAVY DUTY CONCRETE PAVING HEAVY DUTY ASPHALT PAVING TOTAL SPACES = 909 HANDICAP PARKING = 18 (3 VAN-ACCESSIBLE) 2 MOTORCYCLE PARKING AREAS 1-15'x40' BIKE PARKING PAD 1. CONTRACTOR TO RELOCATE EXISTING PEDESTRIAN BRIDGE TO PROVIDE TEMPORARY PUBLIC ACCESS TO TENNIS FACILITY DURING CONSTRUCTION. LOCATION SHOWN IS APPROXIMATE AND SHOULD BE ADJUSTED AS CONTRACTOR SEES FIT FOR SAFE ACCESS TO TENNIS FACILITIES. 2. TEMPORARY WALK AND ACCESS RAMPS UP TO AND FROM RELOCATED BRIDGE SHALL MEET ADA REQUIREMENTS. 3. CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING TO KEEP PUBLIC FROM ACCESSING CONSTRUCTION AREAS. 4. CONTRACTOR TO COORDINATE WITH STRUCTURAL ENGINEER FOR FINAL DESIGN OF ABUTMENTS FOR TEMPORARY PEDESTRIAN BRIDGE CROSSING. 5. CONTRACTOR TO COORDINATE WITH CSU TO ACQUIRE CROSSINGS PERMITS FROM LARIMER COUNTY #2 CANAL. 6. PEDESTRIAN BRIDGE TO BE REMOVED AT END OF CONSTRUCTION. SITE TO BE RESTORED BACK TO EXISTING CONDITIONS. 7. CONTRACTOR TO COORDINATE WITH CSU TO PROVIDE TEMPORARY ADA PARKING ALONG GILLETTE DRIVE FOR ACCESS TO TENNIS FACILITY. 11' TRAVEL LANE 5' BIKE 2.5' C&G VARIES 6' WALK 2% MIN HEAVY DUTY CONCRETE PAVING 11' TRAVEL LANE 5' BIKE 2.5' C&G VARIES 6' WALK 2% MIN 50 1"=50' /#6%*.+0'5''5*''6% CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: B. Renz K. Geiger-Lee NTS C3.02 SITE PLAN- SOUTH 6 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 May 5, 2015 (TYP.) 8.5' (TYP.) 42.2' BUS STOP/ LOADING ZONE 15'x40' PROPOSED ADDITIONAL BIKE PARKING PROPOSED SWALE PROPOSED DRIVE ENTRANCE PROPOSED DRIVE ENTRANCE PER CITY OF FORT COLLINS DETAIL D-14 PROPOSED SWALE PROPOSED SWALE PROPOSED CULVERT PROPOSED 1.5' VERTICAL C&G ISLANDS (TYP.) PROPOSED 1.5' VERTICAL C&G PROPOSED SWALE PROPOSED CULVERT FOR LARIMER COUNTY CANAL #2 CROSSING PROPOSED SWALE PROPOSED 2.5' VERTICAL C&G PROPOSED CULVERT PROPOSED 1.5' VERTICAL C&G ISLANDS (TYP.) PROPOSED MOTORCYCLE PARKING AREA PROPOSED INLET PROPOSED 2.5' VERTICAL C&G 9.0' (TYP.) 24.0' EX. DRIVE ACCESS FOR LARIMER COUNTY #2 CANAL EX. SWALE EX. OUTLET STRUCTURE EX. SIDEWALK CHASE AND ACCESS RAMP TO REMAIN EX. BOX CULVERT EX. LIGHT POLE (TYP.) EX. LIGHT POLE (TYP.) EX. SSMH EX. SSMH EX. FH EX. FH EX. SSMH EX. BIKE PARKING EX. SSMH EX. SDMH EX. TENNIS FACLIITY FENCE EX. TENNIS FACLIITY FENCE APPROXIMATE CENTERLINE OF DITCH APPROXIMATE CENTERLINE OF DITCH FUTURE 5'x24' CONCRETE PAD FOR BUS STOP PROPOSED LIGHT POLE (TYP.) 5.00' 8.00' 8.0' 5.0' 8.0' (TYP.) PROPOSED ACCESS RAMP 8.5' (TYP.) PROPOSED LIGHT POLE (TYP.) 8.5' (TYP.) 6.0' PROPOSED MOTORCYCLE PARKING AREA 8.5' 8.0' PROPOSED ACCESS RAMP ON EAST SIDE OF GILLETTE DRIVE FOR PEDESTRIAN CROSSING EX. STORM PIPE ACCESS RAMP, TYP. 5' WALK 5' WALK APPROXIMATE LOCATION OF RELOCATED PEDESTRIAN BRIDGE AND TEMP PUBLIC ACCESS WALK AND RAMPS. REFER TO NOTES THIS SHEET. 6.0' PROPOSED 15' WIDE MAINTENANCE ACCESS ROAD DRIVEWAY ACROSS SIDEWALK- SEE DETAIL 706.2 8.0' PROPOSED 2.5' CENTRE AVE. PROPOSED 2.5' VERTICAL C&G 5' SIDEWALK (TYP.) R= 20.0' R=5.0' TYP. R=3.0' TYP. R=3.0' TYP. R=13.0' TYP. R=10.0' TYP. R=3.0' TYP. R=3.0' TYP. "CITY OF FORT COLLINS DRAINAGE EASEMENT" 1. CONTRACTOR TO RELOCATE EXISTING PEDESTRIAN BRIDGE TO PROVIDE TEMPORARY PUBLIC ACCESS TO TENNIS FACILITY DURING CONSTRUCTION. LOCATION SHOWN IS APPROXIMATE AND SHOULD BE ADJUSTED AS CONTRACTOR SEES FIT FOR SAFE ACCESS TO TENNIS FACILITIES. 2. TEMPORARY WALK AND ACCESS RAMPS UP TO AND FROM RELOCATED BRIDGE SHALL MEET ADA REQUIREMENTS. 3. CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING TO KEEP PUBLIC FROM ACCESSING CONSTRUCTION AREAS. 4. CONTRACTOR TO COORDINATE WITH STRUCTURAL ENGINEER FOR FINAL DESIGN OF ABUTMENTS FOR TEMPORARY PEDESTRIAN BRIDGE CROSSING. 5. CONTRACTOR TO COORDINATE WITH CSU TO ACQUIRE CROSSINGS PERMITS FROM LARIMER COUNTY #2 CANAL. 6. PEDESTRIAN BRIDGE TO BE REMOVED AT END OF CONSTRUCTION. SITE TO BE RESTORED BACK TO EXISTING CONDITIONS. 7. CONTRACTOR TO COORDINATE WITH CSU TO PROVIDE TEMPORARY ADA PARKING ALONG GILLETTE DRIVE FOR ACCESS TO TENNIS FACILITY. HEAVY DUTY CONCRETE PAVING HEAVY DUTY ASPHALT PAVING TOTAL SPACES = 909 HANDICAP PARKING = 18 (3 VAN-ACCESSIBLE) 2 MOTORCYCLE PARKING AREAS 1-15'x40' BIKE PARKING PAD 11' TRAVEL LANE 5' BIKE 2.5' C&G VARIES 6' WALK 2% MIN HEAVY DUTY CONCRETE PAVING 11' TRAVEL LANE 5' BIKE 2.5' C&G VARIES 6' WALK 2% MIN 50 1"=50' /#6%*.+0'5''5*''6% CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: B. Renz K. Geiger-Lee NTS C3.01 SITE PLAN- NORTH 5 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 May 5, 2015 watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the Local Entity or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. To ensure that sediment does not move off of individual lots one or more of the following sediment/erosion control BMPs shall be installed and maintained until the lots are sufficiently stabilized, as determined by the erosion control inspector, (Within Loveland GMA and City Limits Only). a. Below all gutter downspouts. b. Out to drainage swales. c. Along lot perimeter. d. Other locations, if needed. 16. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City/County. 17. A vehicle tracking control pad shall be installed when needed for construction equipment, including but not limited to personal vehicles exiting existing roadways. No earthen materials, i.e. stone, dirt, etc. shall be placed in the curb & gutter or roadway as a ramp to access temporary stockpiles, staging areas, construction materials, concrete washout areas, and/or building sites. 18. Add notes to reflect the stormwater runoff control plan of the individual development. B. Street Improvements Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the Local Entity Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the Local Entity Engineer in Loveland. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the Local Entity Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the Local Entity Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the Local Entity Inspector and prior to installation of asphalt. *XWWHUVWKDWKROGPRUHWKDQôLQFKGHHSRUIHHWORQJLWXGLQDOO\RIZDWHU shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. ³Proof roll´vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the Local Entity Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The Local Entity Engineer shall be notified at least 24 hours prior to the ³proof roll.´All ³proof rolls´shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per Local Entity Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the Local Entity Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the Local Entity Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period, the Local Entity Engineer reserves the right to require additional signage and/or striping if the Local Entity Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the final drainage and erosion control study (name of the study and date) by (Engineering Firm) shall be followed and implemented. 3. Prior to final inspection and acceptance by The City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Waterli`Zne Note 1. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. B. Renz K. Geiger-Lee NTS C1.01 GENERAL NOTES 3 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 NOTE: -All elevations shown are to flowline of infall or outfall curb and gutter, unless noted otherwise. - All elevations on storm sewer are to pipeline invert, unless noted otherwise. CHECKED BY: CHECKED BY: B. Renz K. Geiger-Lee NTS C0.02 LEGENDS 2 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 EXISTING IRRIGATION EXISTING OVERHEAD ELECTRIC/UTILITY EXISTING EASEMENT PROPOSED EASEMENT PROPOSED RIGHT-OF-WAY PROPOSED 1' CONTOUR PROPOSED 5' CONTOUR PROPOSED FLOW ARROW PROPOSED WATER LINE PROPOSED THRUST BLOCK PROPOSED WATER VALVE PROPOSED STORM LINE W/MANHOLE PROPOSED STORM INLET PROPOSED SANITARY SEWER W/ MANHOLE LEGEND: GENERAL NOTES EXISTING WATER MAIN EXISTING SANITARY SEWER PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING ELECTRIC EXISTING TELEPHONE EXISTING GAS EXISTING CURB & GUTTER PROPOSED TYPE R STORM INLET EXISTING WATER METER EXISTING CABLE TV LINE EXISTING FIBER OPTIC LINE EXISTING ELECTRIC VAULT EXISTING ELECTRIC BOX EXISTING POWER POLE EXISTING GUY WIRE EXISTING LIGHT POLE EXISTING FIRE HYDRANT EXISTING WATER VALVE CONTROL POINT BORE HOLES 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. 2. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. TEST HOLE EXISTING TELEPHONE PEDESTAL EXISTING MANHOLE PROPOSED SANITARY SEWER EXISTING 5' CONT. EXISTING 1' CONT. ABBREVIATIONS: CURB INLET BLOCK AND GRAVEL FILTER WATTLE DIKE (SEDIMENT CONTROL LOG) VEHICLE TRACKING CONTROL PAD CONCRETE WASHOUT AREA SILT FENCE SLOPE PROTECTION - CONTRACTOR TO USE "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. RIPRAP PAD DROP INLET BLOCK AND GRAVEL FILTER SEEDING & MULCHING LIMITS OF DISTURBANCE EROSION CONTROL LEGEND: May 5, 2015 SITE PLAN- SOUTH 10 11 9 8 12 13 14 15 18 19 17 16 20 DETAILS LIGHTING PLAN PHOTOMETRIC PLAN C6.01 C5.01 C4.03 C4.01 C4.02 C9.03 C9.02 C9.01 C7.01 C7.02 C11.02 C11.01 C10.03 C10.01 C10.02 GRADING PLAN- CENTER GRADING PLAN- SOUTH C3.03 INTERSECTION PLAN- CENTRE AVENUE C3.04 INTERSECTION PLAN- RESEARCH BLVD. NORTH C3.05 INTERSECTION PLAN- RESEARCH BLVD. SOUTH STORM PLAN & PROFILE C3.06 APPROVED BY: DATE CHECKED BY: CHECKED BY: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: DETAILS DETAILS LIGHTING PLAN PHOTOMETRIC PLAN NATIVE SEED PLANTING PLAN LIGHTING DETAILS TREE PROTECTION AND DEMOLITION PLAN LANDSCAPE SCHEDULE AND NOTES PLANTING ENLARGEMENT PLAN C12.14 C12.13 C12.12 L2.03 L2.02 L2.01 L1.01 L1.02 OVERALL PLANTING PLAN L8.01 L2.06 L2.05 L2.04 L4.01 21 26 27 25 28 29 30 31 34 35 33 32 36 37 38 C9.04 DETAILS FUTURE SUBMITTAL FUTURE SUBMITTAL FUTURE SUBMITTAL FUTURE SUBMITTAL B. Renz May 5, 2015 K. Geiger-Lee NTS C0.01 COVER SHEET 1 22 23 C9.06 C9.05 DETAILS DETAILS 24 C9.07 DETAILS C8.01 SIGNAGE AND STRIPING PLAN- NORTH Russell + Mills Studios 141 South College, Suite 104 Fort Collins, Colorado 80524 (970) 484-8855 SRB Consulting Engineering 37127 Cullison Ridge Road Windsor, Colorado 80550 (970) 686-1004 SHEET NO. PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: 1CMTKFIG&TKXG5WKVG DATE: (QTV%QNNKPU%QNQTCFQ (#: YYYFKVGUEQUGTXKEGUEQO K. Meyer NONE UTILITY PLANS FOR RESEARCH BLVD. PARKING LOT PROJECT # 14-031 PFA TRAVEL & SITE DISTANCE TRIANGLES PLAN- NORTH PFA TRAVEL & SITE DISTANCE TRIANGLES PLAN- SOUTH C12.11 C12.10 39 40 41 42 43 44 45 C8.02 SIGNAGE AND STRIPING PLAN- SOUTH TREE PROTECTION AND DEMOLITION PLAN LANDSCAPE DETAILS IRRIGATION PLAN IRRIGATION COVER SHEET IRRIGATION FLAG NOTES IRRIGATION PLAN L4.05 IRRIGATION PLAN L4.04 L4.03 L4.02 L4.06 PLANTING ENLARGEMENT PLAN PLANTING ENLARGEMENT PLAN IRRIGATION DETAILS IRRIGATION DETAILS IRRIGATION DETAILS ELECTRICAL SITE PLAN- NORTH E-0.0 L4.08 L4.07 E-1.0 E-1.1 L4.09 IRRIGATION DETAILS ELECTRICAL SCHEDULES & DETAILS ELECTRICAL SITE PLAN- SOUTH 46 47 48 49 50 51 52 53 54 55 56 57 C9.08 DETAILS 58 E1 E2 E3 LIGHTING DETAILS E4 E5 FUTURE SUBMITTAL FUTURE SUBMITTAL LIGHTING/PHOTOMETRIC PLAN NORTH LIGHTING/PHOTOMETRIC PLAN SOUTH