Loading...
HomeMy WebLinkAboutCOLORADO IRON & METAL EXPANSION (REPLAT) - PDP/FDP - FDP120002 - PLANS - UTILITY PLANS (18)City of Fort Collins, Colorado UTILITY PLAN Approval These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City Engineer, or the City of Fort Collins for accuracy and corrections of the calculations. Furthermore, the review does not imply that the quantities of the items on the plans are the final quantities required. The review shall not be construed in any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. 20' SCALE: 1" = 20' 0 20' HORIZONTAL VERTICAL 5' SCALE: 1" = 5' 0 5' NO. DATE BY REVISION 1 2 3 4 5 6 DESIGNED: DRAWN: CHECKED: PROJECT NO.: DATE: PRELIMINARY NOT FOR CONSTRUCTION SHEET: OF 7/18/2012 76-104 FORT COLLINS, COLORADO COLORADO IRON AND METAL, SECOND FILING C14 7 APPROV. 908 Laporte Avenue Fort Collins, CO 80521 (970) 219-2834 'PIKPGGTKPI BUCKINGHAM STREET STREET CROSS SECTIONS C9 BG BG DD C:\Users\Johnny\Desktop\Apex Projects\76-104 - Colorado Iron and Metal - Final - Revision 1\DWG\Production\76-104-BUCKINGHAM.dwg, 7/18/2012 9:53:01 AM, Johnny