Loading...
HomeMy WebLinkAboutBROWNES ON HOWES - Filed DCP-DEV. CONSTRUCTION PERMIT - 2015-08-25ha city0f • Farxtl�ns� El City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Nnmwr: Issue' n" Dmr: S "2C)J 5 Project Name: Bmwnes on Howes Project Location: 315 N. Howes St* PermiKer. Dave Philluas 970.222.89$�I City and developer contacts.- See attacked Exkibit `A' for names and Pkant numbers of all contact persons for tkis project. Fear: Permit Application Fee $ 400..99 Construction inspection Fee: $ I 29. Stye Cut Pee- Excavation Permit $5•t?ffM0 Total amount due S ta799 �_8 Devdapment Bond or odrer approved security. - Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. S 23 139-00 Form of security deposited with the City: Letter of Credit PERFORMANCE REQUIREMENTS OF THIS PERMIT 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and mifications the certification of all rnawrials tcsting by an Engineer. The Pennittee shalt have an Fngitteer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans pmelmed by as Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer''" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Page 1 of 5 3. Construction time restrictions. Ti/A 4. The applicant understands that additional permits may be rcquircd for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along, with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, trallic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable). a. if construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the aarmit fee paid for this permit, whereupon the applicant must m-apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the land Use Code or Sections 29-679 and 29-679 of the "transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . g. Acceptancc by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the 'as -constructed' plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land 11.se Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector trust be notified at least twenty four (24) hours prior to any planned construction on this Project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any Page 2 of 5 land disturbing activity begins, 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. other conditions: N/A. Perw iittee's Acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable intcrest in the real property, as defined in Sion 1-2 of the City Code; and including common areas legally connected to or associWod with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. i also acknowledge that l have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. , Applicant/Pmject Manager's Signature: pate: ApproW for issuance: 20 �� rJ' City Engineer Apprav Date: '' --�_ (Permit Issuance Date) Page 3 of 5 1� EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Browns on Howes City Staff Contact Persons: Development Engineer. Tyler Siegmund 291 N. College Avenue, Fort Collins, CO 80524 (970) 416-2772 Construction Inspector: Kim Keiswetter 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6609 Cell (970) 568-6546 Water Utilities Engineer/ Wastewater Engineer. Shane Boyle 700 Wood Street, Fort Collins, CO 80521 (970)221-6339 Erosion Control Inspector. Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 (970) 224-6700 Natural Resources: Kelly Kimple 281 N. College Avenue, Fort Collins, Co 80524 (970) 416-2401 Traffic Operations: Joe Olson 625 Ninth Strut, Fort Collins, Co 80524 (970) 221-6062 Street closures: Syl Mireles 625 Ninth Stroct, Fort Collins, Co 80524 (970)221-6815 Forestry: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970) 221-6361 Ligbt and Power: Janet McTague 700 Wood Street, Fort Collins, Co 80521 (970) 221-6700 Page 4of5 11 Developer's Contact Persons: Owner Christian Bachelct North Town Builders, Inc. 706 S. College Ave #201 Fort Collins, CO 80524 (970) 224-9204 qmlgia-!t4c—he I �ete,um e -Com Project Engineer. Nick Haws, P.E Northern Engineering Services, Inc 301 N Howes St #100, Fort Collins, CO 90521 (970) 221-4158 Architect/Planner. Heidi Shuff Studio S Architecture, LLC Fort Collins, CO (970) 231-1040 h6dishuffii � ig —n -pq General Contractor- David Phillips philgreen Construction, Inc 1420 Blue Spruce Dr, suite B, Fort Collins, CO 90524 (970) 672-0089 d4ye' : ph i I.&, re nco - q o m Page 5 of 5