Loading...
HomeMy WebLinkAboutMALDONADO - Filed CS-COMMENT SHEETS - 2014-07-17of F6rt urrent Planning PO Box 580 * Fort Collins, CO 80522 970.221.6750 * 970.224.6134 - fax DATE: July 23, 2012 PROJECT COMMENT SHEET TO: Stormwater Utility � PROJECT PLANNER: Jason Holland PDP120021 Maldonado Syision (412 N. Whitcomb St��;f�D -Type Please return all comments to the project planner no later than the staff review meeting: August 8, 2012 Note -Please identify your redlines for future reference ❑ No Problems-� Problems or Concerns (see below, attached, or ACCELA) i Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS *Plat Site Drainage Report _Other Utility _Redline Utility _Landscape or new construction located in the Eastside and Westside Neighborhoods (roughly, north of Prospect, and between Taft and Lemay). The owner selects from the Design Assistance Program Consultant's Master List, and the design must meet -the requirements of the city's building codes. This assistance is available to anyone, regardless of the building's age or eligibility for designation. Response:#1 Not applicable. Photos done. Acknowledged. Department: Environmental Planning Contact: Lindsay Ex, 970.224.6143, lex anfcgov.com 1. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4) protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. If any trees on site have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221-6361) to determine the status of the existing trees and any mitigation requirements as the result of development impacts. 2. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses in your landscaping or re -landscaping and reduce bluegrass lawns as much as possible. Response: Acknowledged Department: Engineering Development Review Contact: Andrew Gingerich, 970.221.6603, aaingerich _fcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.bom/engineering/dev-review.php 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 4. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm 5. This project is responsible for dedicating any right-of-way and easements that are necessary for this project. 6. A Development Agreement is required and will be recorded once the project is finalized with recordation costs paid for by the applicant. 7. Access will need to be granted to both property owners if a driveway is to be shared and the driveway is not wide enough on each individual property for each owner to access on their property. For example, options A and C will both require access easements. Option B allows access to each lot without requiring access easements. 8. A drive approach permit may be required depending on the improvements, widening, and aligning of the proposed driveway. This permit has been included with this letter and if you have any questions please call Engineering Inspections (970) 221-6605. 9. Sidewalk width is 4.5' wide minimum for local street cross section. Verify if the sidewalk is actually 4 feet in width as shown on the sketches? The sidewalk will need to meet the minimum width standard. Response: Yes, sidewalk is 4 ft. Acknowledged Department: Electric Engineering Contact: Justin Fields, 970-224.6150, 'fields@fcgov.com Department: Electric Engineering Contact: Justin Fields, 970.224.6150, ifields(a)-fcgov.com 1. Electric development and system modification charges will apply. Contact Light and Power Engineering (970) 221-6700 for an estimate of these charges. 2. Utility easements may need to be granted depending on the location of the existing service to 412 N Whitcomb and how service will be routed to the new lot. 3. The new meter location needs to be coordinated with Light and Power Engineering. Response: Acknowledged Current Planning Contact: Jason Holland, 970.556.3176, jholland �fcgov.com 1. LUC 3.2.2(K) One parking space is required on each lot. Plan concepts A and B would meet this requirement; Plan C would not meet the requirement. For the driveway layout, Plan B appears to be the most desirable, however please consider adding a traditional planting strip along the center of the driveway. 2. The proposed development project is subject to a Type 1 review and public hearing, the decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid potential hiccups that may occur later in the review process. 3. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. 4. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. 5. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. 6. Please see the Submittal Requirements and Checklist at: http://www.fcgov.com/developmentreview/applications.php. 7. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. 8. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. Response: Acknowledged IV Project: Maldonado Subdivision (412 N. Whitcomb St.) Project Description: Request to subdivide and replat an existing 9,009 square foot lot into two separate lots. Lot 1 would contain 4,497 square feet and Lot 2 would contain 4,496 square feet. An existing single family detached home is situated on the future Lot 1. Lot 2 will be sold for future construction of a new detached single family residence. Two Modification of Standards accompany this request: 1) Modification to the rear setback for future garages on both lots. 2) Modification to the lot size requirement standard. Date: 08/10/2012 Issue ID: 1 Topic: General Round: 1 Status: Active Issue: 08/10/2012: Since this is being processed as PDP and not just a paper exersice as a simple lot split on a plat the standard PDP requirements will apply. The primary requirements are a grading plan and a drainage report/letter meeting the standard requirments of the design criteria manual. They must be prepared by a professonal engineer registered in Colorado. Date: 08/10/2012 Issue ID: 2 Topic: General Round: 1 Status: Active Issue: 08/10/2012: The drainage outfall for this site appears to be sheet flow runoff to the property to the east and sheet flow to Whitcomb. The design engineer will need to verify and document the existing flow patterns. Of particular concern on this site is the amount of runoff leaving the site and draining to the east onto other private property. It must be shown that the proposed volume of runoff from the 100 year -two hour design storm will be equal to or less than it is now. The building gutters and downspouts must be considered in this evaluation. Their size and flow direction need to be shown on the plans and documented in the report. Date: 08/10/2012 Issue ID: 3 Topic: General Round: 1 Status: Active Issue: 08/10/2012: Onsite water quality treatment must be provided in accordance the Urban Storm Drainage Criteria Manual, Volume 3 - Best Management Practices (BMPs). (http://www.udfcd.org/downloads/down_critmanual_vollil.htm) Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. In this case disconnection of impervious area or raingardens are two suggested options. Date: 08/10/2012 Issue ID: 4 Topic: General Round: 1 Status: Active Issue: 08/10/2012: It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. Date: 08/10/2012 Issue ID: 5 Topic: General Round: 1 Status: Active Issue: 08/10/2012: The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area or a minimum amount in accordance with the Fort Collins Stormwater Design Criteria. Date: 08/10/2012 Issue ID: 6 Topic: General Round: 1 Status: Active Issue: 08/10/2012: The design of this site must conform to the drainage basin design of the Old Town Master Drainage Plan as well the City's Stormwater Criteria Manual. Date: 08/10/2012 Issue ID: 7 Topic: General Round: 1 Status: Active Issue: 08/10/2012: There should be a 5 foot drainage easement along the north property line as well as the ones shown. The drainage easement in the center of the two lots that serves as access should be the same width Page 1 of 2 Project: Maldonado Subdivision (412 N. Whitcomb St.) Project Description: Request to subdivide and replat an existing 9,009 square foot lot into two separate lots. Lot 1 would contain 4,497 square feet and Lot 2 would contain 4,496 square feet. An existing single family detached home is situated on the future Lot 1. Lot 2 will be sold for future construction of a new detached single family residence. Two Modification of Standards accompany this request: 1) Modification to the rear setback for future garages on both lots. 2) Modification to the lot size requirement standard. as the access easement; just label it access and drainage easement. No easement should be shown anywhere you want to place buildings. If there is a need to route drainage flows along the back property line an easement should be shown there as well. The 5 feet of drainage easement does not need to be shown as a seperate easement on top of another easement; it too can just be labeled drainage and utility easement unless you have a specfic reason you want it that way. Page 1 of 2 F6rt Collins Current Planning PO Box 580 * Fort Collins, CO 80522 970.221.6750 * 970.224.6134 - fax PROJECT COMMENT SHEET DATE: July 23, 2012 TO: Development Review Engineering 4(vi rAl PROJECT PLANNER: Jason Hollands PDP120021 Maldonado Subdivision (412 N. Whitcomb St.) PDP - Type I Please return all comments to the project planner no later than the staff review meeting: August 8, 2012 Note --Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below, attached, or ACCELA) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other. _Utility _Redline Utility _Landscape City of F6rt Collins REVISION Current Planning PO Box 580 COMMENT SHEET Fort Collins, CO 80522-0580 Fax: 970-224-6134 DATE: August 31, 2012 TO: Development Review Engineering PROJECT PLANNER: Jason Holland PDP120021 Maldonado Subdivision (412 S. Whitcomb St.) PDP - Type I 2nd Round of Review PLEASE NOTE: Please return all comments to the project planner no later than the staff review meeting: September 12, 2012 Note - Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below, attached, or DMS) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site Drainage Report _Other Utility Redline Utility _Landscape Project: Maldonado Subdivision (412 N. VUhitoomb St.) Project Description: Request to subdivide and replat an eAsting 9,009 square foot lot into two separate lots. Lot 1 would contain 4,497 square feet and Lot 2 would contain 4,496 square feet. An eAsting single family detached home is situated on the future Lot 1. Lot 2 will be sold for future constnaction of a new detached single family residence. Two Modification of Standards accompany this request: 1) Modification to the rear setback for future garages on both lots. 2) Modification to the lot size requirement standard. Date: 08/08/2012 Issue ID 1 Topic: General Round: 1 Status: Active Issue: 08/08/2012: Please provide a gradinglutility plan with your next submittal. This should indude grading spot elevations, slopes, etc. as well as existing utilities and proposed servioes. Date: 08/08/2012 Issue ID: 2 Topic: General Round: 1 Status: Active Issue: 08/08/2012: Add note to grading/utility plan that if sidevalk is need of replacement prior to construction or is replaced during construction that it should be replaced with 4.6 width sidewalk Date: 08/08/2012 Issue ID 3 Topic: Plat Round: 1 Status: Active Issue: 08/08/2012: Label the right of way width along VVhitcorrb Date: 08/08/2012 Issue IG 4 Topic: Plat Round: 1 Status: Active Issue: 08/08/2012: The seperate site exhibit shamed the proposed home being 5 from the south property line. The Oat shows a 10' utility easement in this area. The building can not be constructed on top of the utility easement. Date: 08/08/2012 Issue ID 5 Topic: Plat Round: 1 Status: Active Issue: 08/0812012: The proposed garage will not be able to be constructed on top of the drainage easement that is shmw on the plat. 5' w ;— P•� -mot L.� —� 1 C,- Ate- l C4) c5 t Page 1 of 1 412 N. Whitcomb Comment Responses Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-556-3176 orjholland@fcgov.com. Comment Summary: Department: Zoning Contact: Noah Beals, 970.416.2313, nbeals(afcgov.com 1. Land Use Code (LUC) 4.8 In the Neighborhood Conservation Medium Density District (NCM) single family detached is reviewed by a basic development review. However single family detached with more than one principal structure on one lot is a Type 1 review. If a replat is included then the whole proposal will be a Type 1 review. Response: 2. LUC 4.8(D)(1) Each lot is required to have at least 5,000 sq ft for each single family dwelling. Current proposal lot size does not meet the minimum standard and will require a Modification. Density standards also requires that the lot be at least 2 times greater than the total square footage of the Buildings Response: 3. LUC 4.8(D)(5) Floor Area Ratio for the rear one half of a lot is maximum of 33% square footage (note this is not foot -print) Response: 4. LUC 4.8(E)(1) The minimum lot width shall be 40 feet for each lot. LUC 4.8(E)(2) The Front setback is 15 feet and 20 feet for garage doors. LUC4.8(E)(3) The Rear setback is 15 feet from a non -alley and 5 feet from an alley. Department: Zoning Contact: Noah Beals, 970.416.2313, nbeals a(D.fcgov.com LUC 4.8(E)(4) The side setback is 5feet or 15 along a Street on a corner lot. A site plan will be required with the replat to establish the shared driveway access. In turn a Modification will be necessary for the garage to be placed zero (0) feet from the side property line and five (5) feet from the rear property line. Response: 5. LUC 4.8(F) The development standards in this section do apply. LUC 3.5.2(D) The garage standards in this section do apply. Response: These comments are addressed with the plan submittal Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221.6854, rbuffington cDfcgov.com 1. Existing water mains and sanitary sewers in this area include an 8-inch water main and an 8-inch sewer in Whitcomb. 2. The water and sewer services for the houses to the east (518 and 520 Cherry Street) extend from Whitcomb east through this lot or the lot to the south (530 Cherry Street).. These services need to be located and possibly moved if there are conflicts with the proposed house. 3. Provide an easement for the water and/or sewer services on this site that extend to the houses to the east 4. Development fees and water rights will be due at building permit. Response: This easement was created September 15, 1978 and already exists 10feet north of the southern �'C Boundary of the property line and connects from 518 Cherry St to Whitcomb St taps. c� G Department: Stormwater Engineering (� `a r gt_w�j eo- �5 Contact: Glen Schlueter, 970.224.6065, gschlueter _fcgov.com Iry ,Cit"t0 !/ Pt° se 1. It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas is required. 2. In the Old Town drainage basin a drainage and erosion control report and construction plans are required if there is an increase in impervious area greater than 5000 square feet. They must be prepared by a Professional Engineer registered in Colorado. If there is less than 5000 square feet of new impervious area, a drainage letter should be sufficient to document the existing and proposed drainage patterns. If there is less than 5000 but more than 350 square feet of new impervious area; a site grading and erosion control plan is required instead of a complete construction plan set. 3. Water quality treatment is also required as described in the City's Stormwater Criteria Manual. Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. (http://www.udfcd.org/downloads/down_critmanual_vollll.htm) 4. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at Department: Stormwater Engineering Contact: Glen Schlueter, 970.224.6065, gschlueter fcgov.com http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area or a minimum amount in accordance with the Fort Collins Stormwater Design Criteria. 5. The design of this site must conform to the drainage basin design of the Old Town Master Drainage Plan as well the City's Stormwater Criteria Manual. Response: Acknowledged Department: Historical Preservation Contact: Josh Weinberg, 970.221.6206, jweinberg(afcgov.com 1. Any exterior changes to or demolition of buildings 50 years old or older will need to be reviewed under the City's Demolition/Alteration Review Process, Municipal Code Section 14-72. This process begins with a determination of eligibility, which identifies the appropriate review process(es). The determination of eligibility requires current color photographs, of all sides of each building or structure.. Sufficient photos should be taken to show the current condition of the building, especially any previous alterations or additions. Digital photos are encouraged, and may be sent to jeinberg@fcgov.com or kmcwilliams@fcgov.com. Hardcopies may be sent to P.O. Box 580, 80522; or dropped off at CDNS, 1st Floor, 281 N. College Ave. 2. The eligibility of a property for landmark designation does not, in any way, designate the property as a Landmark; it does define which of the various City review processes the development application would be reviewed under. If any of the buildings or structures are found to be individually eligible for Landmark designation, then the project would be reviewed for compliance with LUC Section 3.4.7. Section 3.4.7. is intended to ensure that, to the maximum extent feasible: (1) historic sites, structures or objects are preserved and incorporated into the proposed development and any undertaking that may potentially alter the characteristics of the historic property is done in a way that does not adversely affect the integrity of the historic property; and (2) new construction is designed to respect the historic character of the site and any historic properties in the surrounding neighborhood. 3. Owners of properties that are eligible as landmarks may choose to have the property officially recognized as a landmark, and then qualify for financial incentives. Financial programs include 20% State Tax Credits, $7,500 yearly no -interest loans, $15,000 Historic Structure Assessment grants, State Historic Fund grants of $200,000 and more, and, for income producing properties, an additional 20% Federal Tax Credit. Any work, both interior and exterior, which protects or promotes a building's historic character by meeting the Secretary of the Interior's Standards (http://www.cr.nps.gov/hps/tps/standguide/index.htm) can qualify. For more details on financial incentives, please contact Historic Preservation staff. 4. The Design Assistance Program pays for up to $2,000 each year, for the design of alterations, additions,