Loading...
HomeMy WebLinkAboutFORT COLLINS COLORADO TEMPLE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2014-02-21City of Planning, Development & Transportation Engineering Department 6rt Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax DEVELOPMENT CONSTRUCTION PERMIT Permit Number: l `/ - 0 I Issuance Date: -z/ // `i Project Name: Fort Collins Colorado Temple Project Location: southeast corner of Timberline Road and Trilby Road Permittee: Mark Tingey, local representative for the Corporation of the Presiding Bishop of the Church of Jesus Christ of Latter-day Saints City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 22JO.35 Total $ 22,963.35 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 937,807.58 Form of security deposited with the City: development bond PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Development Construction Permit, Page 2/5 3. Construction time restrictions: n/a 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration in accordance with Section 2.6.3(K) of the Land Use Code: a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion ofpublic improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. Development Construction Permit, Page 3/5 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: n/a Permittee's acknowledgment signature: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: —`�'� / 7 Date:-0-11t% Approval for issuance: City Engineer Approva Date: (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Fort Collins Colorado Temple City Staff Contact Persons: Development Engineer: Marc Virata 281 North College Avenue, Fort Collins, CO 80524 970 221-6567 Construction Inspector: Rob Mosbey 281 North College Avenue, Fort Collins, CO 80524 970 221-6659 Current Planner: Courtney Levingston 281 North College Avenue, Fort Collins, CO 80524 970 416-2283 Water/Sewer Utilities Engineer: Erosion Control Inspector: �0 Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 970 218-2932 Natural Resources: Lindsay Ex 281 North College Avenue, Fort Collins, CO 80524 970 221-6143 Traffic Operations: Ward Stanford 626 Linden Street, Fort Collins, CO 80524 970 221-6820 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Forestry: Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 970 221-6641 Light and Power: Doug Martine Developer' Contact Persons: General Contractor: Development Construction Permit, Page 515 700 Wood Street, Fort Collins, CO 80521 970 224-6152 Doug Allen Okland Construction 1978 S. West Temple Salt Lake City, UT 84115 801-486-0144 (office) 801-419-1407 (cell) doug.allen@okland.com Owner/Developer: John Stoddard Corporation of the Presiding Bishop of the Church of Jesus Christ of Latter-day Saints 50 E North Temple, 101" Floor Salt Lake City, UT 84150 801-240-7132 stoddardiNo-Odschurch.om Owner/Developer: Mark Tingey (Local Representative) Tyco Development 970 224-9444 970 391-0212 (cell) mtingey@comcast.net Architect/Planner: Benjamin Schreiter Architectural Nexus 2505 East Parleys Way Salt Lake City, UT 84109 801-924-5046 (office) 801-232-7632 (cell) .801-924-5001 (fax) bschreiter@archnexus.com Project Engineer: Jeff Olhausen Landmark Engineering 3521 West Eisenhower Blvd. Loveland, Colorado 80537 970-667-6286 (office) jeffo@landmarkltd.com 000000000 o 00 o 0 o 0 o 0 00 0 0 0 0 0 0 0� 000000 000 NOOD 000000000 OR" OOO Om W) C7 O N000OOON (MCN000000000 t0 Ih 1000 c'i CfV �.•� w�Mf9 �f9 Nw aN01Am 696969 t969 fA 19 /fl 69 w (0 00;; 69N H m H m 69 r 69 W C 69 a 69 u J w O F y W U OZLL 000000000 000000000000 O O O O O O N F nnnnnLO0 R9 11n(.9o9oo000o v,v, 000 v,c 0 0 0 0 0 i M m m 0 0 0 0 0 0 0 0 O O Li W 0 0 0 0 Z Z o 0 m(»b9 Vi 69OOO 0 t969 n n n O n n m m m 69 w �f9i� E9 b9 _ 0:3WU HN 0r9u36,e9v>vi(9e9 Wa>F ui w° O <L LLam Z U W O O O O O O O N O 0 0 0 0 0 0 0 0 0 0 0 0 O O 10 O O O O O � W Z O O O O O O O (D O O O O O 0 0 O O O O O O O CO O O O O O r P L O � 0000 000I-O vC(OC 0 00000 0 0 O W Nv 00 O v V W �., WOW(9OOWNO 0 m w n 0 va W 0 m U N w n n ro n rn� cn (V CLco r o a v'ba (n� w rnmvvimw m N ^ O i- H b9 On EA H M 69 Z 01 J J Q N J W J •ALL v�i h�- 3 LL I w Z U O Z w w 0 0 0 0 0 w o n o 000000000000 0 0 M O O 0 0 o N W w x 0,000000wo 000000000000 0vOIh000I- g p 0 H F n N � O V i� 0 0 0 V O v 0 0 0 V' C; a O O O v i 6 m O n O O W O ; �... O- } m O N n (9 O v m 0 (llii 2 fv o o o a o m o. O m m V-- o o m V UFZw Qm b969f9m mNmLE) gRcO nN0 O Omm0wo 0 tL 0 OUOix 690 b9 � M d' WV) O �5 it IL 0: LLI W> i9 m 0 i9 e9 i9 H IL v�F° F O V W LLooLLalt a ¢ ? U U O U Q U ONO0000wo (0Ov0oo000000000 vwowmo m C w 0no(OCl)CO� `ri SZ a�ri Z > U w } w m J O m H m 2 W �y�jw n p zzj0 Q 7 cr V w Cy a F. z � w U m 0 A 0 7 0 0 (0 v (0 (0 e0 w aN rl 00 O O 0000000000 0 O Cl)Z «q J e 3 01 w z U_ " ~ z_ 0 LL W W O �O� xx xxxxxxxxx az aN IL LL IL W U.}}UU LL LL LL C.i0Q0Q0QUQUiJ CiU to Y>-LL Ii LL}1- (40 F �- j j J J J L•% U W Q J J J �Jn n Z z w O C U LL ON z m m N > W U •c n W j J IL a CL > L (n w 0w m 2 dd h w� QyJ o c� 3F >� d 0 a so U U> U a N N s N U V c y > J O v ^y 2 R 4 y c E a O Z <� Zma oa0 m :° �chof WZ1-o w E a_j 00� ,O 0M caI r N�aU E > Q=` ag (ayccmcc �= cc w 10 F o a�H'd mFa H�'�d3�� Qm'm H ��� mac FO aiF> E(Lm CLc��tc€ d`�a�`ymX3: valycm vw� uwc`) x c wy� oUUUU(D0o�-o io@mm(ovv(cammd 10 @mo�a�a�`a2 aZ U oda 0 co 3v�333i ��»�LL3 m(la000a¢U