Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK THIRD SECOND REPLAT - Filed E-ELEVATION PLAN - 2013-10-16N N T ►MCT ♦]Yd HARMONY TECHNOLOGY PARK THIRD FILING SECOND REPLAT PROJECT DEVELOPMENT PLAN/FINAL DEVELOPMENT PLAN cYlCnur RI III fNNr 13UILUINU MUUI Ilull TO REMAIN — — — SCALE: 1 . W-.* SOUTH ELEVATION SCALE: 1 EAST ELEVATION SCALE: 1/1 6"= 1'— 0" ELEVATION NOTES GENERAL NOTE: ALL PAINT COLORS do EXTERIOR MATERIALS TO MATCH EXISTING FACILITY. 1� EXTERIOR INSULATED PRECAST CONCRETE WALL PANEL (PAINTED) 0 PRECAST CONCRETE PANEL — PANEL JOINT 03 PRECAST CONCRETE PANEL — 1 1/2 " REVEAL ® EXTERIOR BRICK VENEER — RUNNING BOND — COLOR k BRICK TYPE TO MATCH EXISTING QS ALUMINUM STOREFRONT SYSTEM WITH 1" THICK INSULATED GLAZING. © 3 COAT STUCCO — PAINTED TO MATCH EXISTING BUILDING STUCCO FINISH F7 STUCCO REVEAL ® PAINTED STEEL TUBE CANOPY TO MATCH EXISTING BUILDING CANOPY SYSTEM 0 PROCESS TANK ENCLOSURE — PAINTED PRECAST CONCRETE PANELS TO MATCH BUILDING PANELS. — TANKS TO BE FULLY ENCLOSED FI-01 ARCHITECTURAL METAL FENCING PER HARMONY TECH GUIDELINES F-111 TANK ENCLOSURE ROOF STRUCTURE — PAINTED STEEL FRAME WITH INTEGRALLY COLORED STANDING SEAM METAL ROOFING Fl-21 PROCESS TANKS SCREEN WALL — TANKS CONCEALED BY SCREEN WALL 13 POURED IN PLACE CONCRETE ACCESS STAIR Fl-4-1 HOLLOW METAL DOOR do FRAME — PAINTED Fl-5-1 CLEAR ANODIZED STOREFRONT CLERESTORY WINDOW 16 POURED IN PLACE CONCRETE RAMP — PAINT EXTERIOR FACE TO MATCH BUILDING FIELD COLOR FI-71 PAINTED STEEL GUARD RAIL F181 EXTERIOR RUBBER TRUCK BUMPER 19 PAINTED STEEL GUARD RAIL — REMOVEABLE r-2-01 FACTORY FINISHED SECTIONAL OVERHEAD DOOR F-21-1 8" RD. DOWNSPOUT, WITH OVERFLOW SCUPPER, PAINTED TO MATCH BUILDING 22 KNOCK OUT PANEL FOR FUTURE OPENINGS F-231 LIGHT FIXTURE — RE: PHOTOMETRIC FAM MYLAR - 09-19-2013 N-139 2692