Loading...
HomeMy WebLinkAboutWOODWARD TECHNOLOGY CENTER - Filed DCP-DEV. CONSTRUCTION PERMIT - 2013-08-29City of Fort Collins `�_,�/ ngi ring City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: �Issuance Date: 3 Project Name: Woodward Technology Center — Overlot Grading Project Location: SW corner of Lemay Avenue and Lincoln Avenue' Permittee: Sal Moya Mortenson Construction City and developer contacts: See attached Exhibit `A' for names and phone numbers of all contact persons for this project. Fees: Construction Inspection Fee (No public infrastructure associated with this DCP) $ 0.00 Total amount due $ 0.00 Development Bond or other approved security: Erosion Control Security. Amount of security deposited with the City to guarantee the proper installation and maintenance of the erosion control measures shown on the approved Grading and Erosion Control Plans which is a part of the Final Development Plan Documents. $ 156,750.00 Form of security deposited with the City: 3?nca; 0" 0z-3 a 1 `r i Landscape Security. Amount of security deposited with the City to cover the costs of the improvements and plantings as shown on the Tree Mitigation Plan which is a part of the Final Development Plan Documents. $ 92,800.00 Form of security deposited with the City: age L1,0, 7-1 S1 �z PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer Page 1 of 5 represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions:_N/. 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (grading plans, site plan, landscape plan, development agreement, soils report, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Page 2 of 5 Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signatu rr--.- Date: Approval for issuance: City Engineer A prov � Date: 611 3 4—�F(Permit Issuance Date) Page 3 of 5 EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Woodward Technology Center — Overlot Grading Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Langenberger 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6573 Construction Inspector: Tracy Dyer 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6605 Cell (970) 222-0855 Current Planner: Jason Holland 281 N. College Avenue, Fort Collins, Co 80524 (970) 224-6126 Water Utilities Engineer/ Wastewater Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970) 221-6854 Erosion Control Inspector: Jesse Schlam 700 Wood Street, Fort Collins, Co 80521 (970) 224-6700 Natural Resources: Lindsay Ex 281 N. College Avenue, Fort Collins, Co 80524 (970)224-6143 Traffic Operations: Joe Olson 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6815 Forestry: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970) 221-6361 Page 4 of 5 Light and Power: Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970) 221-6700 Developer's Contact Persons: Project Manager/Developer: Sal Moya, Mortenson Construction 1621 Eighteenth Street, suite 400 Denver, CO 80202 720-920-4370 Cell (303) 421-0502 sal.moya@morten.son.com Project Engineer: Bob Ameriall, Interwest Consulting Group 1218 W. Ash, Suite C Windsor, CO 80550 970-674-3300 balmirall @ interwest¢rp.com Architect/Planner: Angie Milewski, BHA Design 1603 Oakridge Drive Fort Collins, CO 80525 970-223-7577 amilewski@bhadesign.com General Contractor: Sal Moya, Mortenson Construction 1621 Eighteenth Street, suite 400 Denver, CO 80202 720-920-4370 Cell (303) 421-0502 sal.moya@mortenson.com Page 5 of 5