Loading...
HomeMy WebLinkAboutRAINTREE PUD - Filed GC-GENERAL CORRESPONDENCE - 2008-07-21%W *410 CITY OF FORT COLLINS OFFICE OF PLANNING & DEVELOPMENT. COMPREHENSIVE PLANNING October 18, 1984 Dan King Realty Brokers 315 Canyon Fort Collins, CO 80522 Dear Dan, The staff has reviewed your request for a one year extension to the Raintree PUD Phase 1. There appears to be a few issues that need to be resolved before the staff could recommend approval of the extension request. These issues are as follows: 1. The street design does not meet current City standards. 2. The utility plans are no longer current (i.e. street alignment for Drake Road) and require revisions. 3. There may be the need for an additional utility easement for storm drainage purposes for a outfall line for storm sewer through Rollin Moore Park. The extension request has been tentively scheduled to be reviewed by the Planning and Zoning Board at their November 19, 1984 meeting. In order to allow enough time for staff to review any changes to the final plans, revisions must be submitted no later than Monday, October 29, 1984. If you should require any additional information, please feel free to call me. !eni in rely, e F a k o City Planner cc. Bonnie Tripoli OFFICE OF PLANNING T 300 LaPorte Ave.. P.O. Box 580 . Fort Collins, Colorado 80522 . (303) 221-6750 & DEVELOPMENT, COMPREHENSIVE PLANNING November 15, 1984 Re: Raintree P.U.D. Job No.: 84-439-001 City of Fort Collins Planning Department 300 Laporte Avenue Fort Collins, CO 80521 Attn: Bonni Tripoli In discussion with Rick Ensdorf, preliminary planning shows that the intersection of Shields and Raintree Drive may become a signalized intersection. This would mean that a valley pan across Raintree Drive would not be the optimum design. The modified design of that intersection does not have a valley pan, therefore it is necessary to provide drainage for water coming down Shields. Storm drainage modifications include a new catch basin on Raintree Drive with storm sewer, carrying it to Detention Pond B. The drainage area consists of the west side of Shields from Drake Street, and a small portion of Raintree Drive. The total area is .95 acres. Runoff produced by this basin is Q100 _ 7.33 cfs and Q2 = 2.08 cfs. Attached is the original storm drainage report with modifications resulting from the contribution of the new basin "L". Pages 12, 13 and 15 show the contribution to the detention pond. The volume required changed from 1.21 ac - ft to 1.35 acre - feet. The capacity of the pond is 1.64 acre - feet, so the pond does not need to be changed. Pages 22„ 23A. 24 and 25 show the effect on sewer design and also the new suer along Raintree Drive. Plan sheet 15 shows the new storm sewer line. If you have any questions, please feel free to call. Respectfully, � J. Brian ick TARANTO, STANTON & TAGGE CONSULTING ENGINEERS enclosure F TARANTO, STANTON & TAGGE Consulting Engineers 748 Whalers Way • Building D • Fort Collins, CO 80525 (303) 226-0557 • Metro Denver Number (303) 595-9103 *00 � eC � EVERITT COMP Es corpow 46 November 7, 1985 Dick Wartenbe Transportation Services City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Dick: We have just completed a portion of Drake Road north of our Meadows East Subdivision. The westernmost portion of this roadway dead -ends into the Union Pacific Railroad right-of-way. Drake was not widened across the railroad property, and as a result, some form of barricade/warning sigaage is necessary where the roadway "necks down" in order to protect the more unobservant members of the driving public (the dumb ones) from dropping off the end of the pavement into one large size hole. Please complete this work at your earliest convenience. You can consider this your authorization to bill Everitt for any portion of this signage for which you feel we are responsible. Sincerely,/ "Robert T. Zakely / rtz cc: Mauri Rupel 3000 South College Avenue P.O. Box 2125, 80522 Fort Collins, Colorado 80525 (303)226-1500 Development • Brokerage • Construction • Management • Investment • Financing • joint Ventures • Computer Services • Building Materials CITY OF FORT COLLINS ENGINEERING SERVICES April 22, 1986 Pacific Development Corporation 2555 S. Shields Street Fort Collins, Colorado 80525 Attn: Mr. Bob Berry, Project Manager Dear Mr. Berry: In September of 1985, a meeting was held in regard to the improper location of the two islands - one in Shields Street and the one in Drake Road. Attending the meeting were Mike Jones and Jeff Wynne of Parsons & Associates, (Project Manager for Raintree & Associates), Josh Richardson, Rick Richter and myself representing the City of Fort Collins. After some discussion, Mike Jones agreed to reconstruct the islands to eliminate the current obstruction to traffic. The island in Shields Street was reconstructed last fall, however, the island in Drake Road has not been reconstructed as agreed. We will require that this work be completed prior to issuance of a Certificate of Occupancy for any of the buildings in the Raintree Commercial P.U.D.'s. We thank you for your assistance in this matter. Sincerely, Mike Herzig Assistant City Engineer ENGINEERING SERVICES %W 15 CITY OF FORT COLLINS ENGINEERING SERVICES June 23, 1986 Pacific Development Attn: Bob Berry Dear Mr. Berry: This is to inform you that currently the City Street Oversizing Fund is continuing to meet its reimbursement obligations. If you submit invoices and supporting documentation with no delay, processing of your payment will proceed as normal, with submittal to reimbursement time approximately ten (10) days. Please indicate the address you wish payment to be sent on your submittal. If you have any further questions, please feel free to call me at 221-6605. Sincerely, zonB er S.I.D. Coordinator T y ,t�4 r� x II`'. .,.... .. .�. ........_.. .--` •. us<r...ti.. �,•..,..a�..`.:Yu..aeirz:..i�v1�u'Y,l,j.:.:a������ttiL.�e...i..Sn. ENGINEERING SERVICES 300 LaPorte Ave. P.O. Box 580 Fort Collins, Colorado 80522 (303) 221-6605 u CITY OF FORT COLLINS STORM WATER UTILITY July 18, 1986 Mr. Bob Berry Pacific Development Corp. 2555 S. Shields Street Fort Collins, CO 80525 Re: Approval of Raintree P.U.D. Storm Drainage System Dear Mr. Berry, The spillway elevation of the Westmost detention pond has been raised to 5042.4 and based on the information provided by Intermill Land Surveying will provide the required capacity. Therefore, this letter represents final approval of the stormwater improvements, subject to the normal one year.warranty period for materials and workmanship. Please note that the ponds will NOT be maintained by the City. In addition, it is incumbent upon the owner to come to an agreement with the New Mercer Irrigation Company regarding the placement of spoils from their ditch cleaning operations in the ponds. Although the ponds are privately owned and maintained, they were required to protect downstream property from flood damage. Non -maintenance by the owner will place him at risk for said flood damage as well as jeopardize the continued occupancy of the buildings served by the ponds as per chapter 99 of the City Code. Sinc rely, h mas Ga a n i it Engin er II cc: Project File 4- STORM WATER UTILITY 300 LaPorte Ave. 9 P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6605