Loading...
HomeMy WebLinkAboutTOWER SHOPPES PUD - Filed CS-COMMENT SHEETS - 2006-08-16PROJECT COMMENT SHEET Current Planning DATE: June 29, 2005 TO: Engineering Pavement #60-91N Pinecone PUD, The Tower Shoppes, Sonic Drive-in PDP — Type II All comments must be received by Anne Aspen no later than the staff review meeting: July 20, 2005 Note --Please identify your redlines for future reference © /No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _Other. Utility Redline Utility _Landscape in Project Comments Sheet Ciiyof Fort Collins Selected Departments Department: Engineering Date: July 20, 2005 Project: PINECONE PUD, THE TOWER SHOPPES, SONIC DRIVE-IN PDP - TYPE II All comments must be received by Anne Aspen in Current Planning, no later than the staff review meeting: July 20, 2005 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 11 Created: 7/19/2005 [7/19/051 In field observations, the existing hydrant towards the southeast corner of the site appears to be directly in the path of the sidewalk proposed to be extended along the eastern boundary of the site. Is the drawing accurate with regards to the location of the hydrant in relation to the sidewalk? What will be the separation distance between the sidewalk and the hydrant? Number: 24 Created: 7/20/2005 [7/20105] Please provide information as to where the emergency access easement (offsite) will be situated, The response letter indicates that the emergency access easement will occur around the perimeter of the site, however the drawings only indicate the portion off of Horsetooth. Will it connect out to Timberline? Number: 25 Created: 7/20/2005 (7/20/05] Letters of intent are required from all the affected offsite property owners, this includes Lot 3 and Lot 1 and involve various easements, (emergency access, landcaping, construction, drainage, etc.) z dS D to CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat X Site Drainage Report Other_ Utility Redline Utility X Landscape Page 1 FINAL PLAN COMMENT SHEET City of Fort Collins Current Planning DATE: October 5, 2005 TO: Technical Services PROJECT PLANNER: Shelby Sommer #60-910 Pinecone PUD, The Tower Shoppes, Sonic Drive-in PDP - Final Plans Please return all comments to the project planner no later than the staff review meeting: November 2, 2005 Note - Please identify your redlines for future reference ❑ No Problems 2 Problems or Concerns (see below or attached) Sc ,+IQ IJ iJJ V 1 7-7 /L44P u, /C m ✓ew /6s Name (ple a print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape A 'y Project Comments Sheet im. City of Fort Collins Selected Departments Department: Engineering Date: November 7, 2005 Project: PINECONE PLID, THE TOWER SHOPPES, SONIC DRIVE-IN PDP - TYPE II AND FINAL PLANS All comments must be received by Anne Aspen in Current Planning, no later than the staff review meeting: November 02, 2005 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 51 Created: 11/4/2005 [11/4/05] The legal descriptions for the various easement dedications/vacation closed correctly in our review. Please provide actual deeds of dedication, which will be required prior to sign off on the mylars. The emergency access easement being provided appears to cross into several lots, including Lot 3 (McDonald's). It appears that several different owners (including McDonald's) would need to convey the full easement. Number: 52 Created: 11/4/2005 [11/4/05] The school district will need to sign off on the construction plans prior to our sign off. Number: 54 Created: 11/4/2005 [11/4/05] Please coordinate the title of the site, landscape, and construciton plan documents to one consistent title. My preference would be "Sonic Drive -In - Lot 4 Tower Shoppes P.U.D." Number: 55 Created: 11/412005 (11/4/05] Please provide a note on the construction plans as follows: The emergency access connection from Horsetooth Road to Timberline Road shall meet all access requirements of the Poudre Fire Authority. Any substandard pavement conditions determined by the Poudre Fire Authority shall be remedied by the Developer." 7 G <— Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1