Loading...
HomeMy WebLinkAboutPOUDRE VALLEY HEALTH SYSTEM HARMONY CAMPUS MEDICAL CENTER SECOND 2809 EAST HARMONY ROAD LANDSCAPING AND ENTRY - Filed MA-MINOR AMENDMENT - 2005-10-04City of fort Collins Zoning Department Comments Due Ry:_ I —I b �0 281 N. (ollcec Ave, PO Box 580 Minor Amendment # _ A �ioj'c f I 66 Mort Collins, CO 80522 Planner_ /Li,, /S - -- ci of tort counts (970) 416-2745 FAX (970) 224-6134_ 1 Effective Date_ E -4-0 ., Minor Amendment Application Form Date Submitted: I' - �S_-OJ /� Project Name: I G/ tqf 1 E•-at �ru�j urn �, y-� Project Location (Street Address): _ ' E C, ce,� NW`'"'�"7- r �,__i Minor Amendment Fee: $192.00 Legal Description: PO -Au oxe&, y'2 Cenered Information: Li. Owner's Name (s): Street Address: d gOq Tclephone:'D''0 671 U all property owners having a legal/equitable interest in the property (Attach separate sheets ifnecessary). Fax: City/State/Zip: Ff - (Sewk, _- , 6 O Etij J Applicant's/Consultant's Name: Ltt�e OldpKbe.-q Name of firm: gH11 ec-s"Ja Street Address: 't4M -Vr, tjr- City/State/Zip: Ft- eoib'mS CO gO3dJ` Telephone: d a 3- '73 7 y Fax: ad 3 ` t 9-d) Email: SUBMITTAL REQUIREMENTS: 1) Six (6) copies of RECORDED plan (i.e. site, landscape, elevation, etc. - whichever is being altered) on 24" x 36" size (usually available at the Technical Services Department at 281 N. College) — RED -LINE THE CHANGES ON' the six plans or provide six copies of revised drawings showing the changes in addition to the six originals; 2) Completed and signed application form; and 3) Application fee of $192.00. MINOR AMENUMENT Detailed description of the change and reason(s) for the request: CERTIFICATION I cenify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with the knowledge, conxenL and authority of the owners of the property (including all owners having a legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; which is the subject of this application) without whose consent and authority the requested action should not lawfully he accomplished. Pursuant to said authnnty, 1 hereby permit Cav officials to enter upon the property for the parpose of inspection, and if ❑ecessanl for posting a public notice on the propem. Name (please PRINT): Ad Telephone: Signatu Approval Items for MA05051 Subdivision: POUDRE VALLEY HEALTH SYSTEM 2 Site Address: Department/Description Action Taken CURRENT PLANNING 05/10/2005 CMNT 05/16/2005 OK ENGINEERING -DEVELOPMENT REVIEW 05/09/2005 HLD FORESTRY 05/26/2005 OK 05/16/2005 HLD 06/08/2005 OK STORMWATER ENGINEERING 05/09/2005 06/07/2005 WWW • ENGINEERING 05/09/2005 Page 1 of 2 09/13/2005 2:01:28 PM CMNT OK HLD Entered By Comments (if any) Cameron Gloss No requirements from Current Planning. Please refer to City Forester for comment. Peter Barnes Forester's comments entered and plans forwarded to applicant. Sheri Wamhoff Need to make sure that the bubble placement on the plans does not cover any existing or proposed text. Need to make sure that text is readable and not placed over lines or lines placed over text. What are the elevations of the walls? What do they look like? No grading is shown around the walls. Need more information on the walls design, elevations and what they are going to look like. I need to determine if they are something that will impact the easements and as such something that needs to be routed to the utilities for review. From the plans provided I can not tell if the proposed pump station is within the drainage easement or out of it. Please provide a drawing that shows where the pump station is in relation to the easements. If it is in an easement area, the area under the station will need to be vacated in order for it to be built. If it is, please submit a drawing showing the area proposed to be vacated with dimensions and ties to property lines so it can be located by the reviewing utilities. If all the utilities are okay with the easement vacation I will need a legal description of the area prepared by a licensed surveyor. See utility plans for comments on scanning and bubble placement. Sheri Wamhoff Peter Barnes CHANGE STREET TREE SPECIES PER RED -LINES. Peter Barnes ok per tim buchanan. Basil Harridan According to communications from Stantec the submitted revisions that were associated with this request will need to be updated, please submit new utility plan revisions. Is the existing pipe that connects the two previous ponds going to be abandoned and left in place ? if yes, it needs to be capped. If any easement vacation is sought for the existing pond, then provide necessary documentation. Basil Harridan Approved. Jeff Hill Provide revisions of utility plans which clearly show and define the 8-inch irrigation line being installed as a part of this project. Department/Description Action Taken Entered By Comments (if any) 06/0212005 HLD Jeff Hill As previously indicated, the revisions of the utility plans will be a requirement of this minor amendment. Provide revisions to the utility plans showing the location of the previously installed 8-inch irrigation line as well as any planned irrigation system. 06/09/2005 OK Jeff Hill John Guch at Stantec will provide revised plans. ZONING 04/25/2005 OK Peter Barnes O5/10/2005 CMNT Peter Barnes routed to Tim Buchanan an 5-10-05 05/26/2005 CMNT Peter Barnes revisions recd 5-25-05 and routed. Page 2 of 2 09/13/2005 2:01:29 PM I , , �► r h I DATE: May 6, 2005 DEPT: Eng PROJECT: PVHS 2"d Filing — infrastructure plans ENGINEER: Sheri Wamhoff All comments must be received by: May 13, 2005 ❑ No Problems ❑ Problems or Concerns (see below or attached) Comments: Need to make sure that the bubble placement on the plans does not cover any existing or proposed text. Need to make sure that text is readable and not placed over lines or lines placed over text. What are the elevations of the walls? What do they look like? No grading is shown around the walls. Need more information on the walls design, elevations and what they are going to look like. I need to determine if they are something that will impact the easements and as such something that needs to be routed to the utilities for review. From the plans provided I can not tell if the proposed pump station is within the drainage easement or out of it. Please provide a drawing that shows where the pump station is in relation to the easements. If it is in an easement area, the area under the station will need to be vacated in order for it to be built. If it is, please submit a drawing showing the area proposed to be vacated with dimensions and ties to property lines so it can be located by the reviewing utilities. If all the utilities are okay with the easement vacation I will need a legal description of the area prepared by a licensed surveyor. See plans for comments on scanning and bubble placement. r Date: o;S Signature: �-- PLEASE . ND COPIES OF MARKED REVISIONS ❑ Plat 0 Site 0 Utility ❑ Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS A\ P n O Z VARIES, G D C 0 Irp rn0 < _Z Z G)20 N N p n m= m T a O o a 70 0 c ZG� Z p T rn O m 70 n � r) z c < < � mm n m m m = D m c < x m m 7IM p IM <O O A < < N r Z �Wn nc� O T x c T A m �m Z 0 0 n = 7 D m Z Z p m 0 IM Z m D Z 0 m N T, c y.. AND BUFF SANDSTONE CAP LOCK BRICK CAP ER COURSE BRICK ING BOND BRICK I GRADE PROJECT, SIGNS AND GATEWAYS DRAWING NUMBER Po of pulerHE, sysrEM A.2 w- s ��r�y.co BHA DEIGN, INC. PROJECT N0. — 4065 DATE 5-17-05 ISSUE RECORD 4803 Innovation Dr. Fort Collins, CO 80525 DESCRIPTION: WAIL HEIGHT CHANGE - SECTION REviso�s phn (970)223-7577 ---- — fox (970)223-1827 SCALE, l°= l-G° � Y ,.. r ��;r61116 TSJ�63 39 �I BW-58. 7 BS-6010 BW-58.2 -= TW-61. 2 TS 6339 TW-61.1� 20/o 20/ B �- 59 33 ��� _� '' BW - 58.992% TW - 61.62 o �I TW - 6 1. 1 1 49S9 59.25 T 6200 1 BC - 58.91 �i TC-61.66� - i 4959—� �i ,� sP Lu > B �W 59 05 W-59.35 TW 6096' E2/o TW - 60.96 d/ I © j W �Ii BW 5954 TW - 60 96 BW - 58.93 BW 58.07 I TW - 60.96 TW 59.88 v� BW 58.50 Z BW 57 59 TW 6029 ��� t) TW 59.88 p I 2 , BC 57-94 BC 57�51 1 TC - 60,67 TIC ,60 26 BW - 58,02 TRIM -60.29 � I hl Go it it[� 40- BHA DESIGN, INC. 4803 Innovation Dr. Fort Collins, CO 80525 phn (970)223-7577 fax(970)223-1827 PROJECT: SIGNS AND GATEWAYS POUDRE VAIIEY HEALTH SYSTEM FOI, C10M PROJECT NO. 4065 DATE: 5-17-05 DESCRIPTION: WAIL HEIGHT CHANGE - PLAN SCALE: I' = 30' DRAWING NUMBER. -� A- 2 Hoern ISSUE RECORD REVISIONS