Loading...
HomeMy WebLinkAboutOAKRIDGE VILLAGE PUD ELEVENTH - Filed CS-COMMENT SHEETS - 2005-05-04REVISION COMMENT SHEET DATE: March 29, 1999 TO: Mapping/Drafting PROJECT: #13-82CC Oakridge Village P.U.D., llt" Filing Prelim/Final (LDG) All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, April 14, 1999 ET No Comment _oz o ❑ Problems or Concerns (see below or attached) Date: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _ Other _ Utility _ Redline Utility _ Landscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 16, 1998 TO: Engineering PROJECT: #13-82CC Oakridge Business Park, 28th Filing, Parkside @ Oakridge - Prelim/Final LDGS All comments must be received by Steve Olt no than the staff review meeting: December 16,1998 Date: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ site — Drainage Rgod — Oler Utility Redline Utility — Landsape c;tv �e FoCt c�u;�s PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 16, 1998 TO: Engineering Pavement PROJECT: #13-82CC Oakridge Business Park, 28th Filing, Parkside @ Oakridge - Prelim/Final LDGS All comments must be received by Steve Olt no later than the staff review meeting: December 16, 1998 The pavement design information will need to be removed from the report. The site will need to be re -drilled after the utilities are installed and a final soils report and a pavement design report will need to be submitted. Date: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat -Site _ Drainage Repod _ Oler Ul li _ Rdme UUht _ lmdsape City of Port Collins REVISION COMMENT SHEET DATE: March 29, 1999 DEPT: ENGINEERING PROJECT: #13-82CC Oakridge Village P.U.D., I ith All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, April 14, 1999 ❑ No Problems s (see below or attached) General Comments: ♦ Please see minor comments on the utility and landscape plans. Thank you for addressing all my major concerns. Also, the variance request has been approved by the City Engineer with the condition that a professional engineer in the state of Colorado submits a copy of the variance request. It is technicality that I forgot to mention. Nevertheless the variance request is approved and the Engineering Department is ready to go to public hearing. Date: Signature: Please send copies of marked revisions _ ,---Pratt _site--� _Utility _Landscapes A�COMMFNTS — SUBMIT MYLARS �ICitv of Fort Collins l-�- �c�ul�lJt�TiM`�z1^rirwn)C�� REVISION . COMMENT SHEET DATE: February 16, 1999 DEPT: Engineering PROJECT: Oakridge Village P.U.D. 11t1i Filing PLANNERS Steve Olt ENGINEER: Mark McCallum All comments must be received no later than the staff review meeting: Wednesday, March 3, 1999 No Problems ❑ El Problems or Concerns (see below or attached) All Plans and Supplements Included: © Utility Plan © Site Plan ® Landscape Plan © "Proposed Plat Language' Handout General Comments: 0 See redline comments on all sheets of the utility plan. More specific comments will be mentioned below. Utility Plan Comments: Cover Sheet; Sheet 1 of 8: ■ Include the legal description under the title. ■ The General Dotes have one minor revision. Plat ofOakridge Village P. U.D.: ■ There is new plat language required on all plats for repair and maintenance guarantees. See redlined comments and attached handout. Street Plan and Profile (Armsley Court); ,Sheet 6 of 8: O Armsley Court Should align with the driveway access across Wheaton Drive. ■ The sidewalk along Wheaton Drive should be 5 feet in width and the parkway should be 8 feet. ■ Show the high point elevation within the cul-de-sac. Detail Sheet; Sheet 7 & 8 of 8: ■ The typical utility trench detail should be omitted for it is no longer a standard detail referenced in the street repair manual. In place of the detail put a note as redlined on the plans. The proceeding comment also applies to the replacing asphalt paving detail. IN The typical cross-section detail should show a 10.5-foot parkway/sidewalk. Site and Landscape Plan: O Show 5' sidewalk and 8' parkway along Wheaton Drive. C Show concrete pan at the end of the cul-de-sac. Date: Signatures. ',�� Please send copies of marked revisions XPlat X Site Utility yLandscape City of Fort Conins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: 16 November, 1998 DEPT: Engineering PROJECT: #13-82CC Oakridge Village, 11"-LDGS P/F PLANNER: Steve Olt ENGINEER: Mark McCallum A11 comments must be received by: 12/16/98 B or Problems r ms Pr Concerns (see below or attached) All Plans and Supplements Included: © Utility Plan © Site Plan ® Landscape Plan "Street Repair and Reconstruction Standards and Guidelines" General Comments: O See redline comments on all sheets of the utility plan. More specific comments will be mentioned below. Utility Plan Comments: Cover Sheet; Sheet 1 of 8.' • Include the legal description under the title. • Reference the current soils investigation. O The General Notes should be revised. Plat of Oakridge Village P. U.D.: O The legal description is not accurate and does not coordinate with the exhibit. • Show the R.O.W. dimensions for Wheaton Drive and Stonew iod Court. Grading, Drainage, and Erosion Control Plan: sheet 4 of 8.' ❑• Signature Block should be provided. • Address and phone number for the engineer should be provided. Utility Plan; Sheet 5 of 8: O Show all existing underground utilities including gas, electric. telephone and cable. ❑• Show sidewalk, access ramps, and ROW dimensions. • Indicate curb type. Street Plan and Profile (Stonewood Court): Sheet 6 of 8: • Show redlined spot elevations at the intersection of Stonewood Court and Wheaton Drive. 0 The minimum tangent length at an intersection should be 100 feet • Stonewood Court Should align with the driveway access across Wheaton Drive. • Show elevations at all points -of -curvature. ❑O Show ROW dimensions. • The sidewalk along Wheaton Drive should be 5 feet in width and the parkway should be 8 tcet. 0 Show the full extend of street work. The street "cuts" should be coordinated. See the new "Street Repair and Reconstruction Standards and Guidelines". • The minimum slope for a road way should be 0.4%. The south curb return for Stonewood Court will need to be adjusted. Detail Sheet; Sheet 8 of 8: 0 Show the City detail for a cul-de-sac (D-5). Site and Landscape Plan: • Show 5' sidewalk and 8' parkway along Wheaton Drive. ❑O Show concrete pan at the end of the cul-de-sac. Date: _,Z '� Signature: PLEASE', SEN COPIES OF MARKED REVISIONS: ��LAT 1 ] SITE [ffUTILITY(a) LANDSCAPE