Loading...
HomeMy WebLinkAboutNIX FARM NATURAL AREAS FACILITY - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-04-28;iansp rrtation �)Crvice°— ---------- i'll Zl i I l ; t rf l JV'V IT,F 7'I 11iii j rr.✓r,ir.rsarssrrra DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 01-39 Issuance Date: I U 3 01 Prgjcct Name: Nix Farm Natural Areas Facility Prgiect A.K.A.: Project Location: _ Fast end of Hoffman Mill Road south of Permittee: Cottier Construction, Inc City and developer contacts: See attached F..rhibit 'A "for names and phone numbers of all contact persons for this project. Pees: Permit Application Fee (paid at the time of application) S 0.00 Construction Inspection Fee (paid prior to issuance of this permit) S 8�084.00 Total $ 8,084.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. S n/a Form of security deposited with the City: PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall he responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Fruzincer prepare revised design drawings and secure City approval for all revisions to the tltilit}Plans and related documents. The Permittee shall have an Engineer represent- as required by the City in the Development Agreement, that the improvements are constructed in Conformance with the approved utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance ofthc constructed public improvements. (All references above to the terms "Project Engineer" and 'TwIinec" shall mca.n a Professional Engineer licensed in Colorado.) 1 All contractors who perform work on this project must be bonded and licensed in conformance with City requircmcnts. Development Construction Permit, Page 2,'5 3. Construction titne restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study. drainage report, plat easements and any other official documents), shall be kept on the dcvclopmcut site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant mast re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 ofthe'fransitional Land Use Regulations, whichever is applicable, are met. Ifthe Development Agreement does not specify times for completion of pohlic improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply_ which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. S. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City: and (3) required certifications front the licensed professional engineer that improvements me completed to City standards. specifications and approved Utility Plans_ and the "as -constructed" plans have been received and accepted by the City. 9. 'I he warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code: and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and. if necessary, to enter upon such property to pertorm work required ofthe applicant if the applicant were to fail to perform the required work. I also acknowlcdoe that 1 have read this permit doeument with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this Vermit. Applicant/Project Manager's Signature: t Date: 1C ?v Approval for issuance: City Engineer Approval f-Date: I (Permit Issuance Date) Development Construction Permit, Page 415 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Nix Farm Natural Areas Facility - Development Engineer: Katie Moore 281 N. College Ave, Ft Collins, CO 80522 970 221-6605 Construction Inspector: Jeff Baldwin 281 N. College Ave, Ft Collins, CO 80522 970 221-6605 Current Planner: Cameron Gloss 281 N. College Ave, Ft Collins, CO 80522 970 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Ft Collins, CO 80521 970 221-6854 Stormwater Utilities Engineer: Glen Schlueter 700 Wood Street, Ft Collins, CO 80521 970 221-6065 Erosion Control Inspector: Bob Zackley 700 Wood Street, Ft Collins, CO 80521 970 224-6063 Natural Resources: Doug Moore 281 N. College Ave, Ft Collins, CO 80522 970 221-6750 Traffic Operations: Eric Bracke 625 Ninth Street, Ft Collins, CO 80524 970 224-6062 Street closures: Syl Mireles Development Construction Permit, Page 5/5 625 Ninth Street, Ft Collins, CO 80524 970 224-6815 Transportation Planning: Kathleen Reavis 215 N. Mason St., Ft Collins, CO 80524 970 224-6104 Forestry: Tim Buchanan 215 N. Mason St., Ft Collins, CO 80522 970 221-6641 Light and Power: Doug Martine 700 Wood Street, Ft Collins, CO 80521 970 224-6152 Developer's Contact Persons: Project Manager: Steve White City of Fort Collins (Operations Services) PO Box 580, Fort Collins, CO 80522 Office/Cell: 221-6273, Fax: 221-6534 Developer: City of Fort Collins Owner(s): City of Fort Collins, PO Box 580, Fort Collins, CO 80522 221-6506 (City Manager) Architect/Planner: Jim Sell Design 153 West Mountain Avenue Fort Collins, CO 80524 Office: 484-1921 Project Engineer: Randall Provencio, JR Engineering 2620 East Prospect Road, Suite 190 Fort Collins, CO Office 491-9888, Fax: 491-9984, rprovencio@jrengineering.com General Contractor: Pete Cottier Cottier Construction, Inc. PO Box 1051, Fort Collins, CO 80522 Office: 221-4621