Loading...
HomeMy WebLinkAboutPETERSEN - Filed CS-COMMENT SHEETS - 2010-05-03City of Fort Collins Project Comments Sheet Selected Departments Department: Engineering Date: November 3, 2005 Project: PETERSEN SUBDIVISION PDP, TYPE I All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: October 26, 2005 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 7 Created: 6/3/2005 [10/25/05] Will defer to the various utilities on whether this has been addressed to their satisfaction. [6/3/05] The plat needs to provide for utility easements in a width and layout consistent with criteria set forth by the various utilities and coinciding with improvements as constructed. Number: 9 Created: 6/3/2005 [10/25/05] Technical Services offers the following comments with this submittal: 1. Boundary and legal close 2. Add note to Stormwater (unrecorded easement), "to be dedicated by this plat". 3. What monumentation was found to determine Mason right-of-way? [6/3/05] Technical Services offers the following comments: 1. Boundary & legal close 2. How was the right-of-way determined on Mason Street? 3. Title is wrong, replace "subdivision" with "plaza". 4. How does Lot 2 get service for utilities? 5. It would be helpful if the adjoiner were identified by parcel number. 6. Does the stormwater detention easement on file with the City have a reception # or location? Utility // Da e HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Site Drainage Report Other Redline Utility Landscape Page 1 Project Comments Sheet Selected Departments Department: Water Wastewater Date: June 1, 2005 Project: PETERSEN SUBDIVISION PDP, TYPE I All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: June 019 2005 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: General Number: 4 Created: 5/27/2005 [5/27/05] Provide information regarding location of water/sewer services to the west building and check to see that the services are within an adequate utility easement on the plat. Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page 1 iiiPROJECT Citv of Fort Collins COMMENT SHEET Current Planning DATE: May 6, 2005 TO: Technical Services # 23-05 Petersen Subdivision PDP, Type I All comments must be received by Ted Shepard no later than the staff review meeting: June 1, 2005 Note - Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) 7 &,7 T Y -PA # Name (please print) KECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS lat _Site _Drainage Report _Other is City of Fort Utility Redline Utility _Landscape Collins �y Project Comments Sheet 3+ City of Fort Collins Selected Departments Department: Water Wastewater Date: October 25, 2005 Project: PETERSEN SUBDIVISION PDP, TYPE I All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: October 26, 2005 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: General Number: 4 Created: 5/27/2005 [10/25/05] ( Repeat comment. Information not received.) [5/27/051 Provide information regarding location of water/sewer services to the west building and check to see that the services are within an adequate utility easement on the plat. Signature tj ]of!?"�IJS7Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 REVISION City of Fort Collins COMMENT SHEET Current Planning DATE: October 12, 2005 TO: Technical Services PROJECT PLANNER: Ted Shepard #23-05 Petersen Subdivision — Type I Please return all comments to the project planner no later than the staff review meeting: October 26, 2005 Note - Please identify your redlines for future reference 0 No Problems Problems or Concerns (see below or attached) GAJ I , �joM Ni7A-�Sl '�j LE mkt_ Gad SE , A �� �J (�c Tcr �]Z 5 M �? m, w 4 r 0 iL ) to N er l7r-- p t c4 To- 6 al 7-H [ J l �.�-T M v � UYn � ro Yr-A rhu l "J -S Imo: � i T' 1Z »� i � 6— tii.4sd Paw s ;.— Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS 41-at Site Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins (a I REVISION 06���k City of Fort Collins COMMENT SHEET Current Planning DATE: October 12, 2005 TO: Engineering PROJECT PLANNER: Ted Shepard #23-05 Petersen Subdivision — Type I Please return all comments to the project planner no later than the staff review meeting: October 26, 2005 Note -Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _Drainage Report _Other Utility _Redline Utility _Landscape iA -alm k ft, Citv of Fort Collins STAFF PROJECT REVIEW STEWART AND ASSOCIATES JACK BLAKE 103 S MELDRUM ST FORT COLLINS, CO 80521 Date: 06/09/2005 Staff has reviewed your submittal for PETERSEN SUBDIVISION PDP, TYPE I, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: General Number: 7 Created: 6/3/2005 [6/3/05] The plat needs to provide for utility easements in a width and layout consistent with criteria set forth by the various utilities and coinciding with improvements as constructed. Stewart & Associates Response: Revised for easements. Number: 8 Created: 6/3/2005 [6/3/05] 12' of access easement is required to be dedicated behind the present right-of-way along Mason Street. Stewart & Associates Response: Revised for 12' easement: Number: 9 Created: 6/3/2005 [6/3/05] Technical Services offers the following comments: 1. Boundary & legal close Stewart & Associates Response: Acknowledged 2. How was the right-of-way determined on Mason Street? Stewart & Associates Response: By Fossil Creek Commercial Plaza 3. Title is wrong, replace "subdivision" with "plaza". Stewart & Associates Response: Why? 4. How does Lot 2 get service for utilities? Stewart & Associates Response: in easements 5. It would be helpful if the adjoiner were identified by parcel number. Stewart & Associates Response: Acknowledged 6. Does the stormwater detention easement on file with the City have a reception # or location? Page 1 Stewart & Associates Response: Not that we can rind - copy included Department: PFA Issue Contact: Michael Chavez Topic: General Number: 10 Created: 6/9/2005 [6/9/05] REQUIRED ACCESS: A fire lane is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC The criteria for a required fire lane contain several conditions that must be met. 1. The minimum width shall be 20 feet. Stewart & Associates Response: Acknowledged 2. Inside turning radius shall be 25 feet and outside turning radius shall be 50 feet. Stewart & Associates Response: Acknowledged 3. Compacted road base shall be used during the construction phase only. The permanent fire lane shall consist of asphalt or concrete and shall be required to support 40 tons Stewart & Associates Response: This project "is constructed" with asphalt 4. The fire lane shall be platted as an "Emergency Access Easement" on the final plat. Buildings three stories or more in height must have access to a 30 foot unobstructed access roadway on at least (1) one side for aerial operations. PFA Policy 85-5 (B) Stewart & Associates Response: Acknowledged Number: 11 Created: 6/9/2005 [6/9/05] PREMISES IDENTIFICATION: Approved numerals or addresses shall be provided for all new and existing building in such a position as to be plainly visible and legible from the street or road fronting the property. 1997 UFC 901.4.4 A. In Multi -story buildings the following requirements shall pertain. 1. The first floor units shall be designated with 100's. 2. The second floor units with 200's 3. The third floor units with 300's, and so forth. B. All brass letters and numerals shall be posted on a black background. Stewart & Associates Response: Acknowledged - this project is built. Number: 12 Created: 6/9/2005 [6/9/05] WATER SUPPLY: Commercial No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2 Page 2 Stewart & Associates Response: Acknowledged - this project is bull,~ Department: Stormwater Utility Issue Contact: Basil Harridan Topic: Stormwater Number: 6 Created: 5/31 /2005 [5/31/05] At time of building permit grading drainage and erosion control plans and reports will be required, prior to release of permit. Stewart & Associates Response: This project is built Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 4 Created: 5/27/2005 [5/27/05] Provide information regarding location of water/sewer services to the west building and check to see that the services are within an adequate utility easement on the plat. Stewart & Associates Response: Acknowledged and completed. Be sure and return all of your redlined plans when you re -submit. Stewart & Associates Response: Acknowledged If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 3 City of Fort Collins Current Planning PROJECT COMMENT SHEET DATE: May 6, 2005 TO: Engineering # 23-05 Petersen Subdivision PDP, Type I All comments must be received by Ted Shepard no later than the staff review meeting: June 1, 2005 Note - Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _Drainage Report _Other. Utility Redline Utility _Landscape I& Citv of Fort Collins Project Comments Sheet City of Fort Collins Selected Departments Department: Engineering Date: June 3, 2005 Project: PETERSEN SUBDIVISION PDP, TYPE I All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: June 01, 2005 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 7 Created: 6/3/2005 [6/3/05] The plat needs to provide for utility easements in a width and layout consistent with criteria set forth by the various utilities and coinciding with improvements as constructed. Number: 8 Created: 6/3/2005 [6/3/05] 12' of access easement is required to be dedicated behind the present right-of-way along Mason Street. Number: 9 Created: 6/3/2005 [6/3/05] Technical Services offers the following comments: 1. Boundary & legal close 2. How was the right-of-way determined on Mason Street? 3. Title is wrong, replace "subdivision" with "plaza". 4. How does Lot 2 get service for utilities? 5. It would be helpful if the adjoiner were identified by parcel number. 6. Does the stormwater detention easement on file with the City have a reception # or location? Signature S 3 es Dale C.CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page 1