Loading...
HomeMy WebLinkAboutKINGSTON WOODS PUD - Filed GC-GENERAL CORRESPONDENCE - 2005-03-24Develc ent Services Engineering Department July 8, 1992 Bill Neal Wheeler Realty Better Homes and Gardens 1125 West Drake Road Fort Collins, CO 80526 RE: Kingstowne Wood P.U.D. Dear Bill: The Development Agreement addresses street oversizing reimbursements due to the developer for street construction cost on Horsetooth Road. However, the Development Agreement for this P.U.D. has not been finalized at this time. This letter will state the City's position on reimbursement for street oversizing for Horsetooth Road. 1. The developers responsibilities of construction costs includes 4' of sidewalk, curb and gutter, and a 12' wide asphalt lane on Horsetooth Road. 2. Street Oversizing will reimburse the developer for actual costs incurred to oversize the street to arterial standards. This includes sidewalk over 4' in width and any additional paving work over the 12' wide lane. 3. The developer's responsibilities for the box culvert on Horsetooth Road is 18' of length (measured perpendicular to centerline). Street oversizing will reimburse for costs incurred in constructing the box culvert to arterial street width. The developer is responsible for the construction of wing walls and parapet walls for the box culvert. 4. Street oversizing will reimburse the developer for 50% of the earthwork costs to relocate the irrigation ditch. Your earlier correspondence reflects an accurate calculation of the division of costs between the developer and street oversizing. If you should have any questions, please feel free to call me at 221-6605. Sincerely, att J. Ba SID Coor nator MJB/ltg _til Snrth College Avenue • P_O. Boy �;80 • Fart Collins, CO 80�22-0380 • (303) 221-660� f !P MEMORANDUM DATE: 5/29/92 TO: Mike Herzig FROM: Matt Baker/. RE: Kingston Wood P.U.D. Estimated Construction Costs I have reviewed the May 15th letter from Northern Engineering (see attached) and have revised the estimated construction costs as follows: Assuming measurements taken perpendicular to the centerline of Horsetooth Road, the developer will be responsible for four feet of sidewalk and fourteen feet of roadway (12' travel lane and 2' curb and gutter). The cost of the ditch relocation will be shared equally with the City and the developer, and the wing walls will be entirely born by the developer. The total estimated construction cost are then revised to be: Developers share $30,683.10 City share $23,666.90 If you have any questions contact me at 221-6605. cc: Michael Jones, PE, Northern Engineering Services, Inc. Bill Neal, Wheeler Realty of Fort Collins