Loading...
HomeMy WebLinkAboutFRONT RANGE VILLAGE FIRST REPLAT LOT 7 FAMOUS DAVES - Filed GC-GENERAL CORRESPONDENCE - 2010-04-06Bird, Jason From: Marc Virata [mvirata@fcgov.com] Sent: Wednesday, June 11, 20084:50 PM To: Bird, Jason Subject: RE: Famous Daves at FRV lot 7 Jason, We'll need 7 signed and stamped prints and one mylar copy. Also, I have the Famous Dave's mylars and will look to get the sign off done for Engineering tomorrow before noon. Finally, FYI, I received a voicemail from Bob Randall with Famous Dave's — he was inquiring about the DCP process. I left him a voicemail in return indicating that you may already have been working on items relating to the DCP (cost estimates?) based on what I thought I might have remembered. Thanks, Marc P. Virata, P.E. City of Fort Collins - Engineering Department Phone: (970) 221-6605 Fax: (970) 221-6378 mvirata@fcgov.com >>> "Bird, Jason" <jason.bird@stantec.com> 6/11/2008 9:19:00 AM >>> Thanks Marc, I just received a water line record drawing mylar with signatures. How many copies of that sheet C-189, do I need to resubmit. Thanks, Jason M. Bird Civil Designer / Project Coordinator Stantec 209 South Meldrum Street Fort Collins CO 80521-2603 Ph: (970) 482-5922 Ext. 132 Fx: (970) 482-6368 jason.bird@stantec.com www.stantec.com The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately. Please consider the environment before printing this email. -----Original Message ----- From: Marc Virata [mailto:mvirata@fcgov.com] Sent: Wednesday, June 11, 2008 7:56 AM To: Bird, Jason Cc: Roger Buffington; Willkomm, Anthony Subject: Re: Famous Daves at FRV lot 7 Jason, I know that Stormwater signed off on them a few days ago and they were then given to Water/Wastewater. I will check with Roger for a status check. Thanks, Marc P. Virata, P.E. 1 Stantec March 24, 2008 Famous Dave's — Response Letter Page 4 of 8 mylars for internal recording. Also, please note that the north elevation appears to be incorrectly labeled as the east elevation. And, that the east elevation is incorrectly labeled as the north elevation. Also, please provide vertical dimensions and specify the colors. Robert's Response: The elevation descriptions have been corrected. The vertical dimensions and colors have been added. We have included 24 x 36 renderings. 17. Two lighting schedules were submitted. One is on sheet EO.1 and one is on an unlabeled sheet but is marked "Visual" in the upper right corner. I suspect that sheet EO.1 prevails. But, please clarify to which schedule the point by point illuminance plot is tied to and delete the schedule that does not apply. Hyde Response: The lighting schedule on the photometric calculation sheet is generated by the lighting program. This photometric calculation sheet is for reference only. The schedule on the electrical sheet is the most accurate. 18. Please include in the schedule the 15 decorative wall fixtures. These are attractive fixtures but we need to be sure that they are fully shielded so the lamp is not exposed. Be sure to specify the type of lamp and wattage. Robert's Response: A schedule has been provided which demonstrates the type and wattage of the decorative wall fixtures. The fixture being used is the Angle Shade fixture with a 200W bulb. 19. Note that three of the four pole -mounted fixtures are located within landscape islands and will conflict with tree canopies at maturity. Hyde Response: All light fixtures have been removed from the islands and placed in the parking field to prevent this conflict. 20. Thank you for providing a picture of the Thornton facility. Note that the blue handicap parking signs do not have to exceed 60 inches. The ones in Thornton look excessively high and detract from the building. Robert's Response: You are welcome. Comment noted. 21. Please label all the sheets sequentially. Stantec Response: All sheets have been labeled sequentially as redlined. 22. As a precaution, please note that the depiction of signage on the plans does not constitute any review or approval. All signs are subject to a separate Sign Permit and review process independent of this Minor Amendment. Robert's Response: Comment noted. 23. Please add the Standard Notes 1 — 9 and 13, 14 from the Cover Sheet of the Final Plan. Stantec Response: The notes indicated above have been added to the site plan. Stantec March 24, 2008 Famous Dave's — Response Letter Page 5 of 8 Department: Engineering Issue Contact.' Marc Virata Please have the titles of all drawings be revised to start with: "Front Range Village First Replat, Lot 7", "Famous Daves of America Inc." can be added afterwards, (or as appropriate). Stantec Response: The title of the drawings has been revised to Front Range Village (First Replat), Lot 7, Famous Daves BBQ. 2. Revise the vicnity map on the construction drawings cover sheet to avoid shading and raster images that in general won't scan/reproduce well. Stantec Response: The shading on the vicinity map has been removed. 3. Evidence of permission for work offsite on Lot 6 appears required. (Which other departments may require as additional drainage easement in this area. Stantec Response: Eric Mallory has sent an email to Ted Shepard indicating that Front Range Retail Company approves of the work on lot 6. A copy of this email is attached. A drainage easement was recorded with the original plat of lots 6 & 7 for the purposes of conveying drainage across the lots. 4. Will a joint access easement be recorded between the two properties to ensure that joint use of the driveway between Lots 6 and 7 is preserved? Stantec Response: Yes, a private agreement between the parties, being Front Range Retail Company, Famous Daves, and future lot 6 owner will provide for continued joint access to both lots 6 S 7. A copy of this agreement will be provided upon request. Please contact Eric Mallory for a copy of this agreement. 5. Can the developer and/or Bayer work out an arrangement with Harmony Corporate Center to remove the unused driveway approach just east of the proposed building? It is likely that the area will be incorrectly used for parking and/or vehicles may inappropriately try to turn into this area. Ideally curb and gutter would continue straight across from the PCs, the excess asphalt is removed and sidewalk is provided with irrigation. With outdoor eating apparently at the southeast corner of the building, I would think the desire to remove this unused driveway cut is more magnified. Engineering does not need to revise the existing development agreement for Front Range Village. Other departments though, may have concerns and may result in the need to either revise the previous development agreement for the overall site or require a development agreement specific to this lot. Stantec Response: Yes, Bayer Properties is working on an agreement with HCC to remove the existing driveway approach. This will be replaced with new curbing, sidewalk, and landscaping. Department: Storm water Issue Contact: Basil Hamdan 1. Please show drainage basins and drainage summary table on drainage plan. Stantec Response: The drainage Basins and Hydrology Table have been added to the Drainage and Erosion Control Plan. Stantec March 24, 2008 Famous Dave's — Response Letter Page 6 of 8 2. Compare to FRV assumed areas going to the north pond and to the East pond on HCC property. Stantec Response: Please refer to the added text in the Lot 7 Final Drainage and Erosion Control Study under Drainage Facility Design / Specific Details B.1 — B.3. 3. Please discuss in the drainage report how the basin sizes and impervious areas generated by this site compare to those assumed by the FRV drainage model with emphasis on how this site complies with the assumed basin sizes and impervious areas in that model. Stantec Response: Please refer to the added text in the Lot 7 Final Drainage and Erosion Control Study under Drainage Facility Design / Specific Details B.1 — B.3. 4. How will the swale on the south end of the building tie into the existing pavement? Current design would cause a low spot at the tie-in point causing a nuisance area. It is suggested that a sidewalk chase be added if the stub form HCC is removed and the sidewalk is extended. Stantec Response: We have reconfigured the area you are referring to. There will be a sidewalk chase and a concrete chase to carry flow from the swale into the existing flowline. 5. Please use wattle inlet protection on the existing inlets along the HCC entrance, as it is easier to maintain these than a straw bale inlet filter. Stantec Response: We have revised the Erosion Control Plan to reflect these changes 6. Why is sod grass assumed as an erosion control method in the escrow calculations? Please use a re -seeding cost per square foot, which would considerably reduce the figure for the erosion cost security requirement. Stantec Response: Thank you for pointing this out. We used Gravel Mulch instead of the sod grass in the Erosion Control Estimate which reflects the effectiveness calculations done in the Front Range Village Master Drainage Study. 7. Any work on the adjacent lot (Lot 6) would require approval from that lot's property owner. Please provide written approval from that lot's owner. Stantec Response: Eric Mallory has sent an email to Ted Shepard indicating that Front Range Retail Company approves of the work on lot 6. A copy of this email is attached. 8. Does the proposed inlet on Lot 6 first replat fall within an existing drainage easement? If not, an easement would need to be dedicated there. Stantec Response: A drainage easement was recorded with the original plat of lots 6 & 7 for the purposes of conveying drainage across the lots. Stantec March 24, 2008 Famous Dave's — Response Letter Page 7 of 8 Department: Water & Wastewater Issue Contact: Roger Buffington Curb stop and meter pit must a maximum of 2 feet apart. In addition, provide 5-foot separation from gas and electric lines. Stantec Response: The existing curb stop will remain in place and the proposed meter pit has been relocated to a point within a new landscaping island 2 feet from the curb stop. The gas and electric lines running along the North property line of Lot 7 are already installed and are believed to be approx. 5 feet from the existing curb stop. 2. Provide traffic -rated clean -outs for all clean -outs in paved or sidewalk areas. Include traffic -rated clean -out detail. Stantec Response: Traffic rated sanitary sewer cleanouts have been called out and the detail replaced with a traffic rated cleanout detail. 3. Determine size of water meter and water service to building now to be included on utility plans. Stantec Response: The proposed plan is to utilize the existing 2" domestic water service, but reduce this to a 1.5" line and meter setting, then upsize this line back to 2" to run to the building. Department: Zoning Issue Contact: Peter Barnes Need an architectural site plan. Site plan must have normal land use data table and notes regarding lighting, trash, screening, use, etc. which are typically shown on normal PDP plan. Show lot line dimensions on site plan. Stantec Response: An architectural site plan has been provided by BHA. This plan shows the land use table and notes as indicated. 2. 1 assume there will be a trash enclosure. Please show location and indicate materials/color, etc. Stantec Response: See architectural building elevations. The trash enclosure will be part of the back of house enclosure. 3. Need a bike rack near front entrance. BHA Response: Yes, it is near the To -Go entrance. 4. The number of parking spaces proposed exceeds max. of 10/1000 s.f. for a restaurant use, but we are considering this as part of the shopping center parking lot, which allows up to 5spaces/1000 s.f. Need updated parking ratio count for the center and Famous Dave's. BHA Response: An overall land use table on the cover sheet has been provided as an overall running tally with Lot 7 information added. A separate table is provided on the site plan specific to Lot 7 only. It appears we are well under the 5 spaces per 1,000 SF on the overall land use table. 5. It appears that there are two projecting signs - the "flying pig" and the "to go" sign. It also appears that both project from the face of the canopy cover. Sec. 3.8.7(J) does Stantec March 24, 2008 Famous Dave's — Response Letter Page 8 of 8 not allow signs to project from the face of a canopy, nor can they be on top of the canopy. Therefore, the signs will need to be flushwall, or will need to be relocated to a location where they project from the wall of the building. If they are relocated, projecting wall signs may not project more than 6' from the wall and can't exceed 15 s.f. per side. Roberts Response: We can eliminate the "PIG" sign and mount the to -go sign flush on the wall above the doorway. 6. It appears that the east and north labels on the architectural elevations are switched. Roberts Response: The elevations have been adjusted to depict each elevation clearly. 7. Show parking lot light pole locations on architectural site plan. Are pole heights taller, shorter, or the same as poles in the rest of the center? BHA Response: The light pole heights are the same as shown on the Front Range Village project. We have attached a copy of the lighting plan from the FRV project as a reference. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 482-5922. Sincerely, STANTEC,CON.SU4TING INC. Fifth y P. Willkomm, P. Proje t ngineer Tel: 97 -482-5922 Fax: 970-482-6368 awillkommAstantec.com cc. Bob Randall Stantec file Page i of 1 Bird, Jason .............................................. Subject: Famous Dave's @ Front Range Village From: Eric Mallory [mailto:eric@eurekaventures.net] Sent: Thursday, March 20, 2008 2:01 PM To: Ted Shepard' Cc: Bird, Jason; 'Post, Chad'; 'Karen Foster' Subject: FW: Famous Dave's @ Front Range Village Ted, Front Range Retail Company LLC is in the process of creating the easement agreement to share the common access drive between lots 6 an 7. This easement agreement, or other agreement, will give Famous Daves the access to perform this work on lot 6. We are also in the process of completing a temporary construction easement agreement with HCC to modify the curb cut that is to the east of the proposed Famous Daves building to be built on lot 7. These agreements may not be completed by next Monday, but I don't anticipate any issue with any of these agreements. Please let me know if need any additional information. Thanks for your help, Eric Mallory Eureka! Ventures 2750 E. 146th Street Suite 202 Carmel, IN 46033 (317) 663-7864 (317) 660-6345 fax (317) 489-7251 cell eric@eurekaventures.net 3/24/2008 1 MODEL VrM HT WAREHOUSE 15008 8" 7" 15010 10" 8" 15106 6" 8" 15108 8" 12" 15109 8" 12" 15110 10" 13" 15112 12" 8" 15114 14" 9" 15116 16" 10 1/2" 15117 17" 10 1/2" 15118 18" 12" 15120 20"' 15" 15124 24" 151/2" 15127 27" 16" RADIAL SHADE 19008 8" 19108 8" 19010 10" 19110 10" 19116 16" 19118 18" 19120 20" 19124 24" ANGLE SHADE 18107 7" 18110 10" 18112 12" 18114 14" DEEP BOWL 16110 10" 16112 12" 16116 16" 7" 10" 7" 12" 8" 8" 8" 8" 8" 10 1/2" 12" 14 1/2" 11" 13" 16 1/2" LARGE MY REFLECTOR 17118 18" 18" EMBLEM SHADE, HEM-12 12" 14" PROj BULBS 1 MED 1 MED 8" 1 MED 10" 1 MED 10" 1 MED 13" 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 11" 1 MED 1 MED 10" 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED 1 MED WATT 100W 100W 100W 100W 100W 100W 20OW 20OW 20OW 20OW 20OW 20OW 20OW 20OW 100W 100W 100W 100W 20OW 20OW 20OW 200W Q 20OW 20OW 200W 20OW 20OW 20OW 20OW 1 MED 20OW 1 MED 20OW 0 1 53 1 8.5" 1/2-14 N.P.T. / 12.5 R 20' i � 7" I1 3/4-14 N.P.T. f 34" HL-A r 1 °" n 3/4-14 N.P.T. 7.75" HL-B - 32.5' 6.25" 1 R4.5' 3/4-14 N.P.T. 48.25' HL-C i - 29.75" HL-D HL-E 24.75' 40.25" 13.25" , _1 3/4-14 N.P.T. 7.5' 13.75' 2" T� 1 wMlmdwy dROOlkAT T ARGET SF C b,l I Fjxh,,emanufach—. McGhawfdj,oh pd Mehl Haw_ 1, LaMP TYPe: 75�W M. "hp W.Mes Vertical Coi L-106-ot-Wh: Fiu. TyWShoe Box Pol Ph0,omtk ( Values Ae M�o'M ITING PHOTOMETRIC PLAN IT- Revision: Dote: W 0 Lu ai (D Z- Z go C) z 0 OL', OLL. MAII0806OL1 11/13/2006 AS NOTED SAZANRT SLI-I�H � City of Fort Collins - Engineering Department Phone: (970) 221-6605 Fax: (970) 221-6378 mvirata@fcgov.com >>> "Bird, Jason" <jason.bird@stantec.com> 6/10/2008 10:07:40 AM >>> Marc, I am emailing you to inquire about the status of the Famous Daves mylars? Last I heard, Basil was signing them and sending them back to Engineering. Please let me know so we can plan to pick them up and make necessary copies. Thanks, Jason M. Bird Civil Designer / Project Coordinator Stantec 209 South Meldrum Street Fort Collins CO 80521-2603 Ph: (970) 482-5922 Ext. 132 Fx: (970) 482-6368 jason.bird@stantec.com stantec.com <http://www.stantec.com/> The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately. ii Please consider the environment before printing this email. 2 Transmittal _ Stantec Consulting Inc. 209 South Meldrum Street Fort Collins CO 80521-2603 Tel: (970) 482-5922 Fax: (970) 482-6368 Stantec To: Peter Barnes Company: City of Fort Collins Address: Planning Dept. 281 North College Ave. Fort Collins, CO 80522 Phone: (970) 221-6750 Date: June 16, 2008 File: Stantec job # 187700050 Delivery: Hand Deliver From: Jason M. Bird ❑ For Your Information ❑ For Your Approval ❑ For Your Review x As Requested Reference: Famous Daves BBQ at Front Range Village — Lot 7 signed Mylars Minor Amendment Plans for City # MA-08-00014 Attachments: (1) copy of the signed set of 24 x 36 mylar utility plans (7) copies of the signed set of 24 x 36 utility plans STANTEC CONSULTING INC. Jason M. Bird Civil Designer Tel: (970) 482-5922 Fax: (970) 482-6368 iason.bird &stantec.com cc. BHA — David Kasprzak Bob Randall Mark Naylor Liz Hyde Stantec file One Team. Infinite Solutions. jmb v:\52877f\active\187700050\management\correspondence\transmittals\2008-06-16_peter_bames.doc Stantec Consulting Inc. 209 South Meldrum Street Fort Collins CO 80521-2603 Tel (970) 482-5922 Fax: 1,970) 482-6368 stantec.c, )m April 18, 2008 Development Review Dept. City of Fort Collins 281 North College Avenue Fort Collins, CO 80522 Attention: Peter Barnes Reference: Famous Daves — Minor Amendment (MA-08-00014) Stantec Project # 187700050 This letter is in response to Staff Review Comments for the Famous Dave's project. Our responses are shown in bold text below your comments. Department. Current Planning Issue Contact. Ted Shepard 1. On the Cover Sheet, in the Land Use Table, the Building Coverage total of 810,595 square feet appears low. At the P & Z Hearing in September of 2006, Staff indicated to the Board that the total square footage of gross leasable area was 850,000 square feet. Please use Gross Leasable Area, not Building Coverage as the proper metric by which to establish the running tally for the number of parking spaces to building square footage ratio. Be sure to add in the office floor area above the retail. By increasing this number, all nine pad sites are eligible for additional parking. BHA Response: Tables have been updated to reflect parking/building SF ratios in terms of GLA not building coverage. The following three tables have been provided: Overall Front Range Village (shopping center), Cumulative (overall with Lot 7), and Lot 7 only. 2. On the Site Plan, please remove the contour lines. This layer is not needed. BHA Response: Contour lines are removed. 3. On the Site Plan, please add the electrical transformer to both the plan and legend. If the transformer is marked by the T, then it is not within ten feet of hard surface as required by Light and Power. BHA Response: Transformer was moved to within ten -feet of a hard surface and landscape was adjusted. Stantec April 18, 2008 Famous Dave's — Response Letter Page 2 of 3 4. Please add a note that handicap parking signs and "to go" parking signs shall not exceed 60 inches above the sidewalk. Stantec Response: A note has been added to sheet C-110 regarding the sign height. A note was also added to the Site Plan. 5. On the architectural sheet, please indicate the two colors of the building field. For example, we typically see "Dryvit Parchment #36813" or "Dryvit Pearl #455A." This will help with the building permit review. Roberts Response: The building field EIFS colors have been added to the elevations. 6. On the Lighting Plan sheet 4 of 8, please add the information on the 15 wall -mounted fixtures that was provided on separate 8 1/2 x 11 sheets. Please add these fixtures to the Light Fixture Schedule. Hyde Response: Specs on the wall mounted light fixtures has been added to the Light Fixture Schedule on the lighting plans. 7. One final thought on lighting, for Famous Dave's, this will not be an issue requiring a revision, but for future pad sites, please use a light loss factor of 1.00 in the Luminaire Schedule. And, note that lighting levels for the Chase and Compass Bank will not need to be as high as for a standard restaurant. Hyde Response: Comment Noted. Department: Engineering Issue Contact: Marc Virata 1. Please coordinate the different titles between the bha and Stantec drawings, they still do not match. Note that if the intention is to go with Stantec's complete title, remove the reference to MA #5 in the title. Stantec & BHA Response: The reference to MA # 5 has been removed from the Civil plan cover sheet. Per Ted's direction the reference to MA #5 has remained for Planning Department tracking. 2. The legal description shown on the first sheet of bha's drawings is technically incorrect, it's Lot 7 of Front Range Village First Replat. BHA Response: The legal description has been changed to the above. 3. We will need to have signed easement agreements from Bayer and Harmony Corporate Center for the proposed work on their properties prior to sign off on the construction drawings. Stantec Response: Copies of the signed easement agreements with Bayer (Front Range Retail Company, LLC.) and with Harmony Corporate Center (Case Grande Capital Group, LLC.) are enclosed with this submittal. 4. The applicant will need to fill out a Development Construction Permit (DCP) application and project quantities spreadsheet for review by City Inspection. This information will be then used to determine whether a DCP or a lesser excavation permit is required, and whether security requirements will apply. Stantec Response: The applicant will fill out and submit a DCP application and project quantities spreadsheet. This information will follow this resubmittal. j« Stantec April 18, 2008 Famous Dave's — Response Letter Page 3 of 3 Department: Storm water Issue Contact: Basil Hamdan 1. The proposed work on the adjacent lot (Lot 6 First Replat) should be approved by the owner of that lot. The inlet proposed on Lot 6 should be within a drainage easement. Stantec Response: The work on Lot 6 has been approved by the owner (Front Range Retail Company, LLC.) and is demonstrated via the signed easement agreement. Department. Water & Wastewater Issue Contact: Roger Buffington 1. It appears that a valve is shown at the end of the fire line that has been stubbed on the site. There should not be a valve (existing or proposed) at that location. Could this be a locater station for the tracer wire? If not, there should be one somewhere to facilitate locating the line in the future. Stantec Response: The symbol shown on the survey as an existing valve is actually a temporary valve box containing a temporary blowoff. This will be removed when the fire service line is extended to the building. A note indicating this has been added to our plan sheet C-185. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 482-5922. Sincerely, ST#NTEC/FONSULTING INC. Anth ny . Willkomm, P.E. Proje gineer Tel: 970-482-5922 Fax: 970-482-6368 awilikomm@stantec.com cc. Bob Randall — Famous Daves David Kasprzak — BHA Mark Naylor — Robert's Group Liz Hyde — Hyde Engineering Stantec file Stantec Consulting Inc. 209 South Meldrum Street Fort Collins CO 80521-2603 Tel: (970) 482-5922 Fax: (970) 482-6368 stmttec.com Stantec March 24, 2008 Development Review Dept. City of Fort Collins 281 North College Avenue Fort Collins, CO 80522 Attention: Peter Barnes Reference: Famous Daves — Minor Amendment (MA-08-00014) Stantec Project # 187700050 This letter is in response to Staff Review Comments for the Famous Dave's project. Our responses are shown in bold text below your comments. Department: Current Planning Issue Contact: Ted Shepard The east -west drive aisles are too wide. Parking bays featuring 90-degree parking stalls can be separated by a 24-foot drive aisle. Keep in mind that a Residential Local Street in Fort Collins is 30 feet from flowline to flowline. Since this parking lot will not experience the speeds and volume associated with Residential Local Street, all drive aisles should be reduced in width to 24 feet. Stantec Response: Per our discussion with Ted, the joint access drive entry and drive isle has been maintained as 30 feet wide, but the remainder of the drive isles have been reduced to 24 feet wide. 2. By reducing the four east -west drive aisles to 24 feet, an extra 12 feet can be gained. These 12 feet should be applied to the south property line to mitigate the long row of parking facing south. We are already conceding that the front of the restaurant can face west instead of south. As part of this concession, the south edge of the pad should be enhanced with additional landscape area and plant material to screen the large parking lot. Stantec Response: The additional space gained by reducing the drive isles to 24 feet wide has been placed along the South property line for additional landscaping space. 3. Within this enhanced landscape area, please plant additional trees from the Oak palette. The Harmony Corridor calls for the "Harmony Oaks" concept to be Stantec March 24, 2008 Famous Dave's — Response Letter Page 2 of 8 implemented on a corridor -wide basis. The City Forester has approved the Chinkapin, Bur and English varieties as best suited to our local climate. BHA Response: The previously approved Harmony Setback trees include oaks. The revised planting plan has oak trees added to the parking landscape. 4. There is a diminishment of trees along the south property line when compared to the approved landscape plan for Front Range Village. Attached please find the approved sheet from the Final Plan. There should be no loss of trees. While trees can be shifted, there should be no loss of quantity. BHA Response: The quantity of trees approved per Front Range Village remains the same. These trees have been labeled on the plans. Trees within the property line shall be installed per this project. 5. The shopping center is approved for five spaces per thousand square feet. We need an overall running tally that demonstrates what the parking ratio for the center would be by adding in 7,000 square feet with 105 parking spaces. We will make a reasonable estimation of all nine future pad sites to make sure that at full build -out, we maintain the 5.00 spaces per 1,000 square feet overall ratio. All nine pad users will be asked for the same analysis. BHA $ Bayer Response: An overall land use table on the cover sheet has been provided as an overall running tally with Lot 7 information added. A separate table is provided on the site plan specific to Lot 7 only. It appears we are well under the 5 spaces per 1,000 SF on the overall land use table. 6. Add a connecting walkway from the building entrance to the public sidewalk along Harmony Road. Be sure to reconcile any conflicts between the walk alignment and landscaping. Stantec & BHA Response: A connecting sidewalk has been added from the restaurant entrance to the walk along Harmony Road and the Landscaping has been adjusted accordingly. 7. Regarding the shared north -south drive aisle along the west property line, please note that this can also be reduced to 24 feet wide. Also, could you have Bayer Properties send us a letter or e-mail stating that they approve the sharing of the portion of the drive that is on Lot Six. Stantec Response: The shared access drive has been maintained as 30 feet wide. An email was sent to Ted Shepard from Eric Mallory stating that Bayer approves of the shared driveway and for the work on Lot 6. A copy of this email is provided. 8. Is there a screen wall that partially obscures the north side of the building? Please indicate on the plans and call out the height and materials. Robert's Response: Yes, there is a screen wall around the North side of the building, which encloses the back of house area. The height will be approx. 12 feet and the top of columns being 13'-8", and the materials and finish will match the remainder of the building. Stantec March 24, 2008 Famous Dave's — Response Letter Page 3 of 8 9. Regarding the architectural elevations, please refer to notes 10 and 11 on the Cover Sheet of the Final Plan. The restaurant needs to tie into the center in some manner. The most obvious common feature is the use of stone. In order to match the center, please specify that this stone is to be "Eldorado Stone — Western Series." Robert's Response: We are using the "Eldorado" Cultured Stone and have noted this on the revised elevations. 10. Thank you for adding a feature over the entrance along the south elevation. It would look better if this doorway treatment included a metal roof that matches the treatment along the west elevation. Please indicate how far off the wall this entry treatment will project. The site plan does not indicate any columns that project off the wall plane. Such feature should be illustrated on the right side of the west elevation as a feature that is beyond the wall plane of the west wall. Robert's Response: We have added a roof and porch projection at this door location to further add the "front" feel you are looking for. 11. Please indicate on the architectural elevations that the dashed lines behind the parapet represent roof top mechanical equipment that appears to be totally below the top of the parapet. If, upon final inspection, rooftop equipment exceeds the height of the parapet, then you will be asked to provide additional screening based on how these units are represented. Robert's Response: The roof top equipment is screened by the parapet wall and notes to this affect have been added to the rendered elevations. 12. Please provide a cornice detail so we can see the measurements of the depth and the three -dimensionality. Robert's Response: This has been added to the elevation sheet. 13. Along the east elevation (labeled as the north) there is one column/pilaster next to the door that does not extend past the roofline. Is there a good reason why this column does not match the height of the others? Robert's Response: You are correct; this was an oversight on our part and has been revised accordingly. 14. Please label the red band around the roof line as painted and non -illuminated Robert's Response: Your assumption is accurate, there is no light band. Notes describing the cap flashing have been added to the plans. 15. Most commercial buildings feature a roof access ladder that extends above the parapet in an unattractive manner. Although you are not showing one, my guess is that such ladder will be along the north elevation. If provided, please notch the ladder into the parapet as best as possible to minimize the exposure above the parapet. Robert's Response: The roof ladder is internal to the building; there is not an exterior roof ladder. 16. For the next round, we will need to have the architectural elevations on a 24" x 36" sheet. At the time of final approval, we will need all sheets to be on 24" x 36"