Loading...
HomeMy WebLinkAboutINVERNESS INNOVATION PARK - Filed DCP-DEV. CONSTRUCTION PERMIT - 2010-01-20City O[ Planning, Development & Transportation T Engineering Department ■ 281 North College Avenue F6rt CO ' n s PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 1 c0 - 0 ( Issuance Date: I it I zdl o Project Name: Inverness Innovation Park First Filing Project Location: north side of Vine Drive, west of Linden Street Permittee: City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400.00 �v Construction Inspection Fee (paid prior to issuance of this permit) $ S7,339.10 Total $ $7, 739.10 (� Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 211,010.06 Form of security deposited with the City: check to be replaced with a bond or loc) PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. COPY People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $ $211.010 Private infrastructure, estimated cost: $ I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the ftggired work. n Applicant Signature �% ( Date: ` < < ` o t GO) First National Bank Global Banking Group 1620 Dodge Street Omaha NE 68197-1096 1.888.464.7804 SWIFT: FNBOUS44 IRREVOCABLE LETTER OF CREDIT NO. STB10200004 JANUARY 13, 2010 CITY OF FORT COLLINS ENGINEERING DEPARTMENT 281 N. COLLEGE AVE. FORT COLLINS, COLORADO 80524 DEAR SIR OR MADAM: WE HEREBY ESTABLISH, AT THE REQUEST AND FOR THE ACCOUNT OF DOHN CONSTRUCTION, INC., LOCATED AT 2642 MIDPOINT DRIVE, UNIT A, FORT COLLINS, CO 80525, IN YOUR FAVOR AS BENEFICIARY, OUR IRREVOCABLE LETTER OF CREDIT NO. STB10200004, IN THE AMOUNT OF TWO HUNDRED ELEVEN THOUSAND TEN DOLLARS AND 06/100, ($211,010.06)(AS MORE FULLY DESCRIBED BELOW), EFFECTIVE IMMEDIATELY AND EXPIRING AT THE CLOSE OF BANKING BUSINESS ON NOVEMBER 15, 2010, AT OUR OFFICE LOCATED AT 1620 DODGE STREET, SC 1096, OMAHA, NEBRASKA 68197-1096. THIS LETTER OF CREDIT IS INTENDED FOR THE FUNDING REQUIRED FOR THE ROCKY MOUNTAIN INNOVATION INITIATIVE ON EAST VINE STREET IN FORT COLLINS, COLORADO ("DEVELOPMENT PROJECT") FOR THE ASSURANCE OF THE COMPLETION OF THE CONSTRUCTION AND THE MAINTENANCE AND REPAIR OF THE PUBLIC INFRASTRUCTURE IN CONNECTION WITH AFORESAID DEVELOPMENT PROJECT AND ITS ASSOCIATED DEVELOPMENT AGREEMENT AND DEVELOPMENT CONSTRUCTION PERMIT. FUNDS UNDER THIS LETTER OF CREDIT ARE AVAILABLE TO YOU FOR ONE OR MORE DRAWINGS PRIOR TO THE CLOSE OF BUSINESS ON NOVEMBER 15, 2010, AGAINST SIGHT DRAFTS IN AN AGGREGATE CUMULATIVE AMOUNT NOT TO EXCEED $211,010.06 DATED THE DATE OF PRESENTMENT, DRAWN ON OUR OFFICE REFERRED TO ABOVE, REFERRING THEREON TO THE NUMBER OF THIS LETTER OF CREDIT AND ACCOMPANIED BY YOUR WRITTEN CERTIFICATE SIGNED BY YOU AND ACKNOWLEDGED AS THEREIN PROVIDED IN THE FORM OF EXHIBIT 1 HERETO. PRESENTATION OF SUCH DRAFT AND CERTIFICATE SHALL BE MADE AT OUR OFFICE REFERRED TO ABOVE. UPON THE EARLIER OF (I) OUR HONORING YOUR DRAFT(S) TOTALING $211,010.06 IN THE AGGREGATE PRESENTED ON OR BEFORE THIS LETTER OF CREDIT EXPIRES PURSUANT TO THE TERMS HEREIN OR (II) THE SURRENDER TO US BY YOU OF THIS LETTER OF CREDIT FOR CANCELLATION, THIS LETTER OF CREDIT SHALL AUTOMATICALLY TERMINATE. IT IS UNDERSTOOD THAT THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED AS PUBLIC IMPROVEMENTS ARE CONSTRUCTED AND ACCEPTED BY THE CITY. AS COMPONENTS OF THE INFRASTRUCTURE ARE SATISFACTORILY COMPLETED IN ACCORDANCE WITH APPROVED UTILITY PLANS, THE VALUE OF THE COMPLETED COMPONENTS MAY BE ESTABLISHED FROM THE DEVELOPMENT CONSTRUCTION PERMIT WORKSHEET FOR DETERMINING COSTS OF INFRASTRUCTURE CONSTRUCTION AND INSPECTION FEES, WHEREUPON THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED BY THE VALUE OF THE COMPLETED COMPONENT(S), UPON EXECUTION OF A "REQUEST FOR AMENDMENT TO LETTER OF CREDIT" IN THE FORM ATTACHED HERETO AS EXHIBIT 2. PAGE 1 OF 2 ORIGINAL COPY First National Bank PAGE 2 OF 2 STB10200004 JANUARY 13, 2010 Global Banking Group 1620 Dodge Street Omaha NE 68197-1096 1.888.464.7804 SWIFT: FNBOUS44 THIS LETTER OF CREDIT SHALL BE SUBJECT TO THE UNIFORM COMMERCIAL CODE AS IN EFFECT IN THE STATE OF COLORADO, AND, TO THE EXTENT NOT INCONSISTENT WITH THE TERMS OF THIS LETTER OF CREDIT AND THE UNIFORM COMMERCIAL CODE, THE UNIFORM CUSTOMS AND PRACTICE FOR DOCUMENTARY CREDITS, 2007 REVISION, ICC PUBLICATION NUMBER 600. THIS LETTER OF CREDIT WILL BE AUTOMATICALLY EXTENDED WITHOUT AMENDMENTS FOR ONE YEAR FROM THE PRESENT, AND EACH FUTURE EXPIRATION DATE THEREOF, UNLESS ISSUER DELIVERS WRITTEN NOTICE AT LEAST SIXTY (60) DAYS PRIOR TO ANY SUCH EXPIRATION DATE TO THE CITY OF FORT COLLINS OF ITS INTENT NOT TO RENEW THIS LETTER OF CREDIT. ANY SUCH NOTICE SHALL BE IN WRITING AND SHALL BE DELIVERED WITH AN ACKNOWLEDGED RECEIPT, EITHER IN HAND OR BY CERTIFIED MAIL. ANY REQUESTS FOR AMENDMENTS TO THIS LETTER OF CREDIT SHALL BE MADE IN THE FORM OF EXHIBIT 2 ATTACHED HERETO. THE CITY MAY AT ANY TIME REQUEST THAT THE BANK AMEND THIS LETTER OF CREDIT BY SUBMITTING TO THE BANK A FULLY EXECUTED CERTIFICATE IN THE FORM OF EXHIBIT 2. THE BANK MAY THEREAFTER PROMPTLY ISSUE AN AMENDMENT TO THE LETTER OF CREDIT CORRESPONDING TO THE CHANGE OR CHANGES REQUESTED IN SUCH CERTIFICATE. THIS LETTER OF CREDIT IS NOT TRANSFERRABLE. THIS LETTER OF CREDIT SETS FORTH IN FULL OUR UNDERTAKING, AND SUCH UNDERTAKING SHALL NOT IN ANY WAY BE MODIFIED, AMENDED, AMPLIFIED OR LIMITED BY REFERENCE TO ANY DOCUMENT, INSTRUMENT OR AGREEMENT REFERRED TO HEREIN, EXCEPT ONLY THE CERTIFICATE AND DRAFT(S) REFERRED TO HEREIN; ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE HEREIN BY REFERENCE ANY DOCUMENTS, INSTRUMENT OR AGREEMENT EXCEPT FOR SUCH CERTIFICATE AND DRAFT(S). SINCERELY, NAME:` JOLDERSMA TITLE: TRADE SERVICES SPECIALIST OFFICE: FIRST NATIONAL BANK OF OMAHA, STREET, SC 1096, OMAHA, NE 68197-1096 PHONE NUMBER: 402-602-3564 INTERNATIONAL DEPARTMENT, 1620 DODGE 7% ORIGINAL COPY P ;1; O First National Bank Global Banking Group 1620 Dodge Street Omaha NE 68197-1096 1.888.464.7804 EXHIBIT 1 SWIFT: FNBOUS44 CERTIFICATE THE CITY OF FORT COLLINS HEREBY CERTIFIES AS FOLLOWS WITH RESPECT TO THE CERTAIN IRREVOCABLE LETTER OF CREDIT NUMBER STB10200004 DATED JANUARY 13, 2010, ESTABLISHED IN FAVOR OF THE CITY OF FORT COLLINS, COLORADO (THE "LETTER OF CREDIT"): (A) HE(SHE) IS AUTHORIZED TO EXECUTE THIS CERTIFICATE ON BEHALF OF THE CITY OF FORT COLLINS; (B) THE APPLICANT/DEVELOPER IS IN DEFAULT UNDER THE TERMS OF THE DEVELOPMENT AGREEMENT AND/OR THE DEVELOPMENT CONSTRUCTION PERMIT. (C) THE SUM OF $ WHICH IS THE AMOUNT OF THE DRAFT PRESENTED WITH THIS CERTIFICATE, IS THE AMOUNT CURRENTLY DUE TO THE CITY OF FORT COLLINS FROM (D) THE AMOUNT OF THE ACCOMPANYING DRAFT TOGETHER WITH ALL PREVIOUS DRAWS UNDER THE LTTER OF CREDIT DO NOT EXCEED IN THE AGGREGATE $ ; AND (E) THE LETTER OF CREDIT HAS NOT EXPIRED. IN WITNESS WHEREOF, THE UNDERSIGNED HAS EXECUTED THIS CERTIFICATE ON BEHALF OF THE CITY OF FORT COLLINS THIS DAY OF , THE CITY OF FORT COLLINS, COLORADO A MUNICIPAL CORPORATION (TITLE) ORIGINAL COPy First National Bank Global Banking Group 1620 Dodge Street Omaha NE 68197-1096 1.888.464.7804 SWIFT: FNBOUS44 EXHIBIT 2 REQUEST FOR AMENDMENT OR RELEASE OF LETTER OF CREDIT #STB10200004 THE CITY OF FORT COLLINS CERTIFIES THAT THE PERSON SIGNING BELOW IS AUTHORIZED TO EXECUTE THE REQUEST FOR AMENDMENT OR RELEASE OF LETTER OF CREDIT ON BEHALF OF THE CITY OF FORT COLLINS, AND FURTHER CERTIFIES WITH RESPECT TO THE PROVISIONS CONTAINED IN THE BUILDING PERMIT DATED AND/OR THE DEVELOPMENT AGREEMENT DATED , BETWEEN THE CITY OF FORT COLLINS (BENEFICIARY) AND (DEVELOPER) THE FOLLOWING: [CHECK APPLICABLE BOXES] ❑ THE LETTER OF CREDIT IS TO BE REDUCED TO S ❑ THE EXPIRATION DATE OF THE LETTER OF CREDIT IS REVISED TO BE ❑ THE 60-DAY AUTOMATIC ONE-YEAR RENEWAL PROVISION CONTAINED IN THE LETTER OF CREDIT IS NO LONGER IN EFFECT. ❑ RELEASE ORIGINAL LETTER OF CREDIT UPON RECEIPT OF SEPARATE REPLACEMENT MAINTENANCE LETTER OF CREDIT IN THE AMOUNT OF $ (CURRENT VALUE). ❑ RELEASE LETTER OF CREDIT. IN WITNESS WHEREOF, THE UNDERSIGNED HAS EXECUTED THIS CERTIFICATE ON BEHALF OF THE CITY OF FORT COLLINS THIS DAY OF I CITY OF FORT COLLINS, COLORADO A COLORADO MUNICIPAL CORPORATION BY: (NAME AND TITLE) ORIGINALCOPY 0) First National Bank BENEFICIARY: CITY OF FORT COLLINS ENGINEERING DEPARTMENT 281 N. COLLEGE AVE. FORT COLLINS, CO 80524 OUR L/C NO:STB10200004 AMENDMENT OF IRREVOCABLE STANDBY LETTER OF CREDIT DATE: JANUARY 15, 2010 AMENDMENT NO: 1 WE HAVE AMENDED THE CAPTIONED LETTER OF CREDIT FOR THE ACCOUNT OF: DOHN CONSTRUCTION, INC. 2642 MIDPOINT DRIVE UNIT A CONSTANCE DOHN FORT COLLINS, CO 80525 AMENDED TERMS AND CONDITIONS: Global Banking Group 1620 Dodge Street Omaha NE 68197-1096 1.888.464.7804 SWIFT: FNBOUS44 THE FOLLOWING SENTENCE IN PARAGRAPH 2 HAS BEEN REMOVED FROM THE ORIGINAL LETTER OF CREDIT: "THIS LETTER OF CREDIT IS INTENDED FOR THE FUNDING REQUIRED FOR THE ROCKY MOUNTAIN INNOVATION INITIATIVE ON EAST VINE STREET IN FORT COLLINS, COLORADO ("DEVELOPMENT PROJECT") FOR THE ASSURANCE OF THE COMPLETION OF THE CONSTRUCTION AND THE MAINTENANCE AND REPAIR OF THE PUBLIC INFRASTRUCTURE IN CONNECTION WITH AFORESAID DEVELOPMENT PROJECT AND ITS ASSOCIATED DEVELOPMENT AGREEMENT AND DEVELOPMENT CONSTRUCTION PERMIT." IT HAS BEEN REPLACED WITH THE FOLLOWING: "THIS LETTER OF CREDIT IS INTENDED FOR THE FUNDING REQUIRED FOR THE INVERNESS INNOVATION PARK FIRST FILING ON EAST VINE STREET IN FORT COLLINS, COLORADO ("DEVELOPMENT PROJECT") FOR THE ASSURANCE OF THE COMPLETION OF THE CONSTRUCTION AND THE MAINTENANCE AND REPAIR OF THE PUBLIC INFRASTRUCTURE IN CONNECTION WITH AFORESAID DEVELOPMENT PROJECT AND ITS ASSOCIATED DEVELOPMENT AGREEMENT AND DEVELOPMENT CONSTRUCTION PERMIT." THIS AMENDMENT IS SUBJECT TO RECEIPT OF BENEFICIARY'S CONSENT. PLEASE CONFIRM YOUR CONSENT TO US BY COMPLETING THE ENCLOSED BENEFICIARY'S CONSENT TO THE AMENDMENT FORM BY MAIL. THIS AMENDMENT MUST BE ATTACHED TO AND BECOME AN INTEGRAL PART OF THE ORIGINAL CREDIT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. Iv / MARY 0 SMA Page 1 of 2 ORIGINAL COPY First National Bank Global Banking Group 1620 Dodge Street Omaha NE 68197-1096 1.888.464.7804 Page: 2 SWIFT: FNB0US44 Date: January 15, 2010 Our Reference No: STB10200004 BENEFICIARY'S CONSENT TO THE AMENDMENT TO: FIRST NATIONAL BANK, INTERNATIONAL DEPARTMENT, 1620 DODGE STREET, OMAHA, NE 68197-1096. RE: LETTER OF CREDIT NO FOR THE ACCOUNT OF: STB10200004 DOHN CONSTRUCTION, INC. 2642 MIDPOINT DRIVE UNIT A CONSTANCE DOHN FORT COLLINS, CO 80525 ON BEHALF OF THE BENEFICIARY OF THE ABOVE MENTIONED LETTER OF CREDIT AND BY SIGNING THIS LETTER I CONFIRM THAT THE BENEFICIARY IS: y� ACCEPTING AMENDMENT NO. 1 REJECTING AMENDMENT NO. 1 BENEFICIARY: CITY OF FORT COLLINS ENGINEERING DEPARTMENT 281 N. COLLEGE AVE. FORT COLLINS, CO 80524 AUTHORIZED SIGNER:.`' n 0-r.. TITLE: DATE: 1 / 1 / [ 1© Page 2 of 2 copy A L Development Construction Permit, Page 2/5 3. Construction time restrictions: No construction activities shall commence until such time as a Development Construction Permit Meeting has occurred with representatives of the City and the Developer (including the Developer's general contractor present. 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: N/ Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms d conditions so stated in this permit. Applicant/Project Manager' s Signatur : _ Date: Approval for issuance: fd�City Engineer Approval -- Date: (Permit Issuance Date) f� Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS City Staff Contact Persons: Development Engineer: Marc Virata 281 North College Avenue, Fort Collins, CO 80524 970 221-6605 Construction Inspector: Tracy Dyer 281 North College Avenue, Fort Collins, CO 80524 970 222-0855 Current Planner: Ted Shepard 281 North College Avenue, Fort Collins, CO 80524 970 221-6341 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 970 221-6854 Erosion Control Inspector: D.A. Black 700 Wood Street, Fort Collins, CO 80521 970 221-6700 Natural Resources: Dana Leavitt 281 North College Avenue, Fort Collins, CO 80524 970 221-6143 Traffic Operations: Joe Olson 626 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Forestry: Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 970 221-6641 Light and Power: Doug Martine 700 Wood Street, Fort Collins, CO 80521 970 224-6154 Developer' Contact Persons: Developer/Owner: Project Manager/Permittee: Development Construction Permit, Page 515 Michael Jensen Urban Development Partners, LLC 1220 South College Avenue Fort Collins, CO 80524 mike@fortcollinsre.com Michael Bello Urban Development Partners, LLC 1220 South College Avenue Fort Collins, CO 80524 970 566-4541 mbello 10@comcast.net Planner: Olexa Tkacheno Preview Architecture & Planning 204 Walnut Street #A Fort Collins, CO 80524 970 493-3391 970 493-3398 (fax) of@previewap.com Landscape Planner: Terence Hoaglund Vignette Studios, LLC PO Box 1889 Fort Collins, CO 80522-1889 970 472-9125 886 902-4163 (fax) hoaglund@vignettestudios.com Project Engineer: Bob Gowing Apex Engineering 171 North College Avenue Fort Collins, CO 80524 970 797-2906 970 407-9244 (fax) 970 219-2834 (cell) chalfantl@ayersassociates.com General Contractor: Doug Dohn Dohn Construction 2642 Midpoint Drive Fort Collins, CO 80525 970 490-1855 970 490-6093 (fax) DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1/16/06) For City use only: Application Number. Application Date: Permit application fee: S 400.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Inverness Innovation Park first filing Project A.K.A. (Marketing name if different from Project Name): RM12 — First Phase Project Location: 209 to 500 blocks of East Vine Drive north and south sides of East Vine Drive Property Owner (At the time of this permit issuance): Individual Name: Michael L Jensen, Manager Company Name: Urban Development Partners LLC Address: 1220 South College Avenue Fort Collins CO 80524 Phone number(s): Office: 970 212-2420 Cell phone: 970 222-8136 Fax number: 970 206-0090 Email: mikegfortcollinsre.com Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Michael L Jensen Manager Company Name: Urban Development Partners LLC Address: 1220 South College Avenue Fort Collins CO 80524 Phone number(s): Office: 970 212-2420 Cell phone: 970 222-8136 Fax number: 970 206-0090 Email: mikegfortcollinsre.com Permittee (Person who is to sign the Development Construction Permit): Individual Name: Michael L Jensen, Manager Company Name: Urban Development Partners LLC Address: 1220 South College Avenue Fort Collins CO 80524 Phone number(s): Office: 970 212-2420 Cell phone: 970 222-8136 Fax number: 970 206-0090 Email: mike ,fortcollinsre.com Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Bob Gowing Company Name : Apex Engineering Address: 171 North College Avenue Fort Collins CO 80524 Phone number(s): Office: 970 797-2906 Cell phone: 970 219-2834 Fax number: 970 407-9244 Email: bob(a,apex-engineer.com Professional License Number: #34290 Architect/Planner (The person responsible for the site design of this project) Individual Name: Olexa Tkachenko Company Name : Preview Architecture+Planning Address: 204 Walnut Street, Fort Collins CO 80524 Phone number(s): Office: 970 493-3391 Cell phone: 970 443-5289 Fax number: none Email: otna_previewa .com Professional License Number: #34290 Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement —add additional names below): Individual Name: Michael L Jensen MaMer Company Name: Urban Development Partners LLC Address: 1220 South College Avenue Fort Collins CO 80524 Phone number(s): Office: 970 212-2420 Cell phone: 970 222-8136 Fax number: 970 206-0090 Email: mike&fortcollinsre.com General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Doug Dohn Company Name : Dohn Construction Inc Address: 2642 Midpoint Drive Fort Collins CO 80525 Phone number(s): Office: 970 490-1855 Cellphone: 970 566-0261 Fax number: 970 490 6093 Email: _ ddohngdohnconstruction com If you have no General Contractor, list all other contractors below Grading contractor: Individual Name: Company Name Address: Phone number(s): Office: Cellphone: Fax number: Email: Utility contractor: Individual Name: Company Name: _ Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for structures: Individual Name: Company Name Address: Phone number(s): Office: Cellphone: Fax number: Email: Paving contractor: Individual Name: _ Company Name Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Landscape contractor: Individual Name: _ Company Name: Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"xl1" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project)