Loading...
HomeMy WebLinkAboutUNIVERSITY SHOPPING CENTER - Filed DCP-DEV. CONSTRUCTION PERMIT - 2004-09-03DEVELOPMENT CONSTRUCTION PERMIT Permit Number: _ 04-21 Issuance Date: July 16 2004 Project Name: McDonald's Restaurant Project A. K.A.: Project Location: _ 2401 S. College Avenue Fort Collins CO 80524 Permittee: Wavne Bisho City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid prior to issuance of this permit $ 150.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 235.00 Total $ 385.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ NA Form of security deposited with the City: NA PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and speci fications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved UtillityPlans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and ` Fngincer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Office: Cellphone: Fax number: Email: Paving contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Landscape contractor: Individual Name: Company Name: Address: Phone numbcr(s): Office: Cellphone: Fax number: Email: Other contractors and parties involved in the project: PAGE 4 OF 5 File: dproj11602130ocslFrom Ft Collins EngineeringlDCP Applicationdoc SUMMIT THE FOLLOWING ITEMS (Required for all projects): • SI/2"xII"copy ofthe Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required irchecked): Li Traffic control plan(s) for the project u Proposed haul routes shown on a City map u Shop drawings u Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting arc the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project). People to Attend: List the names and titles for those who will attend the pre -construction meeting: Nanne Title MR. WAYNE BISHOP, MCDONALD'S DEVELOPER MS. LISA SUNDERLAND, CC_B CNS PROJECT MGR. MR. WEYLAN BRYANT, PE PROJECT ENGINEER AS ASSIGNED, CCB PROJECT SUPER. ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. 'I he estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $ 2,885.50 Private infrastructure, estimated cost: $ 0.00 I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the properly (including all owners having legal or equitable interest in the real property, as defined in Section 12 of the City Code: and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter u)pon such property to perform work required of the applicant if the applicant were to fail to perform the r Iui e work. { Applicant Signature:. Date: A1U11A0rA 0G folz NNHG ktsNO� PAGE 5 OF 5 File I Ipro111602130ocslFrom Ft Collins EagineeringlDCPApplication.doc is tlNals � z a Wis rn3wvA v.v 3,wn s tl�tez u". ivxwa rva3ranos na avB axwa ui,reaa� � y mvwx ova+ 'ma awmm 9 3 ,:"'rsw 'on maen ., a. y C � pq i3r (n laamQrtl>.vxas ya a a $ d ! FlC3 STIAOYAY WU � � g r � 000©C)©000(0) oo®000 ©o o® o®®®®®®®®®o H R Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.63(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. if the Development Agreement does not specify times for completion of public improvements, orif there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspectorbefore any land disturbing activitybegins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: �n�i. T :�_4-7Z'Q_ Q D�i� eaaC C_ C>i.! Ztl i1 C---� G'"�-r_ �r.A jA..i, L:>t i-)CA.�I('�1`:a [e tr' `�-f`i �F_-"11"'�.�1la�i 1/:_4.% I t: r<..-ti.... �- !A. Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature: �lz �2� j�C . � �i ate: Approval for issuance: City Engineer Approval �/� %t'.� Ger � y t Date: /E t r^ (P16rrnil Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: McDonald's Restaurant City Staff Contact Persons: Development Engineer: Susan Joy 970-221-6605 Construction Inspector: Lance Newlin 970-222-0855 Building and Zoning: Peter Barnes 970-221-6760 Water Utilities Engineer: Jeff Hill 970-221-6674 Erosion Control Inspector: Bob Zakely 970-224-6063 Natural Resources: Doug Moore 224-6143 Traffic Operations: Eric Bracke 970-224-6062 Street closures: Syl Mireles 970-221-6815 Transportation Planning: Tom Reiff 970-416-2040 Forestry: Tim Buchanan 970-221-6361 Light and Power: Doug Martine 970-224-6152 Developer' Contact Persons: Project Manager: Wayne Bishop McDonald's Corporation 5251 DTC PKWY, Ste 300 Greenwood Village, CO 80111 303-262-3773 office 303-898-5765 cell Developer: Wayne Bishop McDonald's Corporation 5251 DTC PKWY, Ste 300 Greenwood Village, CO 80111 303-262-3773 office 303-898-5765 cell Development Constmction Permit, Page 515 Architect/Planner: Weylan Bryant Huitt-Zollars, Inc. 4582 S. Ulster Street, Ste 1303 Denver, CO 80237 303-740-7325 office 303-810-6007 Project Engineer: Weylan Bryant Huitt-Zollars, Inc. 4582 S. Ulster Street, Ste 1303 Denver, CO 80237 303-740-7325 office 303-810-6007 General Contractor: Lisa Sunderland Christofferson Comm. Build. Inc. 3235 Fillmore Ridge Hgts Colorado Springs, CO 80907 719-548-0999 office 719-330-1382 cell LU W W N W Q F Vi W F N 0 U Z Q N W F- H Z Q 7 0 F- U W N0 N.. a Z 0 0 0 O 0 0 .... 00 000 ... 0 0 o 0 0 0 000 ... ..000. 0.".. 0: q O o 0 00 ci o e»<»F»wu��n 000000000 F»v>»rn r»f»e>F»ca c o y O oO 0 H n w 0 W O a w w c� N O Z LL J a w � F 0 0 j o O O o O o m 0 O O O o 0 0 o 0 0 0 r r r 0 0 0 0 0 0 0 0 0 v o 0 o v o W} QJ O O M M M M E9NM V100 O O O O O M O m M Nln V3 O O O fA E/INtA fA E9 z a LU W > H ~O Z > V r 00 w aF � Wf z m Z'o Z D o O O O O O O 000 O O O O.O O O O O O O O O 000 O O O O O O O O O O O O O O 00 O O O O O N z w W W 2' 000000 t»v>r»wcn �n 0000000000 v>F»w»cn �nwwv>ei OO000 NNin�oF»F» W W IfJ m m zO ~O U z N W o W J w N U a 3 a O Z a w ~ w O O F_ W 0 0 0 0 0 0 00 .... .110.0000. CIO .... 0000 0 0000.. 0 0 0 m 0 O 0 �Y d N W � w o 0 0 0 00 vi in Fn F»v>v> 0 00 0 0.600. »�n �n v, v�F»F»«»e3 Fn 0 0 o m o Oo �n F»F»�N ww � jONFFS- a F- m w T U O m O Q > tin OU Q it > LL (1) 0. w 0 c o 0 0 o Oo 000 0 OOo 0 00 000 QNoo 2 o w } F t+ U w�pw� LU C t p w O w m z u 0 Z g a z a w W a > a m W�a=w 0 ? o o � > Q w z LL W ow J m Ny LLLL>YUU WLLLLUUUUUUU a a a Q VJJLLLLLLYY 3 d J J U V Q a W w J J J a a a W W W W W W W J(n J J J fn (n Z W Z O O O U F .c O w 0 O L N Q z > � � U N W U z_ m c Z a CY U O J w K a a v 3 ¢ ' v z W M v w NN U a in 3 o w N 0 Z m Z N @ J = W o 0 N H p R J H a v U vo Zo amW JN> 7 (Z0 Er � zp aKa d > 0 0 J �r � UJ�H �ii�>�u. >i in c7w Uoa¢U m DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/ 16/99) For City use only: Application Number: d Application Date: permit application fee: S -.00 1:, , �i INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Fngineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJF,CT INFORMATION: Project Name (as approved by the City): McDONALD'S RESTAURANT Project A.K.A. (Marketing name if different from Project Name): Project Location: 2401 S. COLLEGE AVENUE — CITY OF FORT COLLINS, CO Property Owner(At the time of this permit issuance): Individual Name: MR. WAYNE BISHOP (PROJECT MANAGER) Company Name: MCDOsIALD'S CORPORATION Address: 5251 DTC PKWY, STE 300 — GREENWOOD VILLAGE, CO 80111 Phone number(s): Office: (303) 262-3773 Ccllphone: (303) 898-5765 Fax number: (303) 773-6960 Finail: WAYNE.BISHOPOMCD.COM Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: MR. WAYNE BISHOP (PROJECT MANAGER) Company Name: MCDONALD'S CORPORATION Address: 5251 DTC PKWY, STE 300 —GREENWOOD VILLAGE, CO 80111 Phone number(s): Office: (303) 262-3773 Ccllphone: (303) 898-5765 _ Fax number: (303) 773-6960 Email: WAYNE.BISHOP@MCD.COM PAGE 1 OF 5 File: Clpro111602130ocslFrom Ft Collins EngineennglDCP Application.doc Permittee (Person who is to sign the Development Construction Permit): Individual Name: MR. WAYNE BISHOP (PROJECT MANAGER) Company Name: MCDONALD'S CORPORATION Address: 5251 DTC PKWY, STE 300 — GREENWOOD VILLAGE, CO 80111 Phone number(s): Office: (303) 262-3773 Ccllphone: (303) 898-5765 Fax number: (303) 773-6960 limail: WAYNE.BISHOPOMCD.COM Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the dcsign of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number. MR. WEYLAN BRYANT, P.E. (VICE PRESIDENT & OFFICE MGR) HUITT-ZOLLARS, INC. 4582 S. ULSTER STREET, STE 1303 — DENVER, GO W237 (303) 740-7325 (303) 810-6007 (303) 224-9997 Ismail: WBR Professional License Number: 28427 Architect/Planner (The person responsible for the site design of this project) Individual Name: Company Name: Address: Phone number(s): Office: Ccllphone: Fax number: MR. WEYLAN BRYANT, P.E. (VICE PRESIDENT & OFFICE MGR) HUITT-ZOLLARS, INC. 4582 S. ULSTER STREET, STE 1303 — DENVER, CO 80237 740-7325 810-6007 224-9997 Ismail: WBRYANT(a� Professional License Number: 28427 Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement —add additional names below): Individual Name: MR. WAYNE BISHOP (PROJECT MANAGER) Company Name: MCDONALD'S CORPORATION _ Address: 5251 DTC PKWY, STE 300 — GREENWOOD VILLAGE, CO 80111 Phone number(s): — -- — — Office: (303) 262-3773 Ccllphone: (303) 898-5765 Fax number: (303) 773-6960 Ismail: WAYNE.BISHOP(@MCD.COM PAGE 2 OF 5 File: I:Ipro111602130ocslFrom Ft Collins EngineeringlOCP Application.doc General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Names MS. LISA SUNDERLAND (PROJECT MANAGER (MCD-S)) Company Name: CHRISTOFFERSON COM. BUILD. INC. Address: 3235 FILLMORE RIDGE HGTS - COLORADO SPRINGS, CO 80907 Phone number(s): Office: (719) 548-0999 Ccllphone: (719) 330-1382 Fax number: 473-2280 Email: __(719) LISACCB@AOL.COM If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Narne: Address: Phone number(s): Office: Cellphone: Fax number: Email: Utility contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name: Address: Phone number(s): Office: Ccllphone: Fax number: Email: Concrete contractor, for structures: Individual Name: Company Name: Address: Phone number(s): PAGE 3 OF 5 File: I: Iprg11602131DocslFrom Ft Collins EngineeringOCP Application doc