Loading...
HomeMy WebLinkAboutOVERLOOK AT WOODRIDGE PUD - Filed DA-DEVELOPMENT AGREEMENT - 2004-01-13DEVELOPMENT AGREEMENT THIS AGREEMENT, made and entered into this-1004 day of 199' , by and between the CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City"; B & N INVESTMENTS, INC., a Colorado corporation, DBA Woodcraft Homes, hereinafter referred to as the "Developer"; and ARAPAHOE FARMS INC., a Delaware corporation, hereinafter referred to as the "Owner". WITNESSETH: WHEREAS, the Developer has entered into an agreement with the Owner to acquire ownership of certain property situated in the County of Larimer, State of Colorado, (hereafter referred to as the "Property") and legally described as follows, to wit: THE GATES AT WOODRIDGE, P.U.D., FIRST FILING, and THE OVERLOOK AT WOODRIDGE, P.U.D., FIRST FILING, located in the Southwest Quarter of Section 34, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. WHEREAS, the Developer desires to develop the Property and has submitted to the City a subdivision plat and/or a site plan and landscape plan, a copy of which is on file in the office of the Director of Engineering and made a part hereof by reference; and WHEREAS, the Developer has further submitted to the City utility plans for the Property, a copy of which is on file in the office of the Director of Engineering and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of the Property will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat and/or site plan and landscape plan submitted by the Developer subject to certain requirements and conditions which involve the installation of and construction of utilities and other municipal improvements in connection with the Property. NOW, THEREFORE, in consideration of the promises of the parties hereto and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, it is agreed as follows: I. General Conditions A. The terms of this Agreement shall govern all development activities of the Developer pertaining to the Property. For the purposes of this Agreement, "development activities" shall include, but not be limited to, the following: (1) The actual construction of improvements, (2) Obtaining a building permit therefor, or (3) Any change in grade, contour or appearance of said property caused by, or on behalf of, the Developer with the intent to construct improvements thereon. EXHIBIT B - Page 2 ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST 3. Right-of-way & easement acquisition (a) S.F. $ /S.F. $ (b) Ac. $ /Ac. $ Sub -Total S 4. Professional Design (a) Offsite Drainage Analysis Based on Letter to Stormwater Utility (Susan Hayes) dated May 6, 1991 5. Other ( a) (b) (c) Lump Sum Total estimated cost of Storm Drainage improvements eligible for credit or City repayment Prepared by: ' Stan Myers P.E. (RBD jmL.Title: Project Manager Address: _2900 S. College Ave. Ft. Collins, CO. 80526 $ 62400.00 $ 6.400.00 B. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the Council - approved standards and specifications of the City on file in the office of the Director of Engineering at the time of approval of the utility plans relating to the specific utility, subject to a three (3) year time limitation from the date of execution of this Agreement. In the event that the Developer commences or performs any construction pursuant hereto after three (3) years from the date of execution of this agreement, the Developer shall resubmit the project utility plans to the Director of Engineering for reexamination. The City may require the Developer to comply with approved standards and specifications of the City on file in the office of the Director of Engineering at the time of resubmittal. C. No building permit for the construction of any structure within the development shall be issued by the City until the water lines, fire hydrants, sanitary sewer lines and streets (with at least the base course completed) serving such structure have been completed and accepted by the City. No building permits shall be issued for any structure located in excess of six hundred sixty feet (660') from a single point of access. D. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A," attached hereto, shall be installed within the time and/or sequence required on Exhibit "A." If the Director of Engineering has determined that any water lines, sanitary sewer lines, storm drainage facilities and/or streets are required to provide service or access to other areas of the City, those facilities shall be shown on the utility plans and shall be installed by the Developer within the time as established under "Special Conditions" in this document. E. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer, and storm drainage facilities and appurtenances, and all streets, curbs, gutters, sidewalks, bikeways and other public improvements required by this development as shown on the plat, site, landscape and utility plans, and other approved documents pertaining to this development on file with the City. F. Street improvements (except curbs, gutters and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all individual lot service lines leading in and from the main to the property line. G. The installation of all utilities shown on the utility plans shall be inspected by the Engineering Department of the City and shall be subject to such department's approval. The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict, the utility plans shall supersede the standard specifications. H. All storm drainage facilities shall be so designed and constructed by the Developer as to protect downstream and adjacent properties against injury and to adequately serve the Property (and other lands as may be required, if any). The Developer has met or exceeded the minimum requirements for storm drainage 2 facilities as have been established by the City in its Drainage Master Plans and Design Criteria. The Developer does hereby indemnify and hold harmless the City from any and all claims that might arise, directly or indirectly, as a result of the discharge of injurious storm drainage or seepage waters from the development in a manner or quantity different from that which was historically discharged and caused by the design or construction of the storm drainage facilities, except for (1) such claims and damages as are caused by the acts or omissions of the City in maintenance of such facilities as have been accepted by the City for maintenance; (2) errors, if any, in the general concept of the City's master plans (but not to include any details of such plans, which details shall be the responsibility of the Developer); and (3) specific directives that may be given to the Developer by the City. Approval of and acceptance by the City of any storm drainage facility design or construction shall in no manner be deemed to constitute a waiver or relinquishment by the City of the aforesaid indemnification. The Developer shall engage a licensed professional engineer to design the storm drainage facilities as aforesaid and it is expressly affirmed hereby that such engagement shall be intended for the benefit of the City, and subsequent purchasers of property in the development. I. The Developer shall pay storm drainage basin fees in accordance with Chapter 26, Article VII of the City Code. Storm drainage improvements eligible for credit or City repayment under the provisions of Chapter 26 are described together with estimated cost of the improvements on the attached Exhibit "B," which improvements, if applicable, shall include right-of-way, design and construction costs. See Section II.C, Special Conditions, Storm Drainage Lines and Appurtenances, for specific instructions. J. The Developer shall provide the Director of Engineering with certified Record Plan Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of the construction. II. Special Conditions A. Water Lines Not Applicable Sewer Lines 1. The Developer shall reimburse the City the sum of $178 per gross acre for the cost of installation of the Warren Lake Trunk Sewer to serve the development. Said reimbursement shall be paid prior to the time the first building permit is issued for this development. Storm Drainage Lines and Appurtenances 1. The Developer and the City agree that all on -site and off -site storm drainage improvements shall be completed by the Developer in accordance with the approved plans prior to the issuance of more than 13 building permits. Completion of improvements shall include the certification by a licensed professional engineer that the drainage facilities which serve this development have been constructed in conformance with said approved plans. 2. The Developer agrees to provide and maintain erosion control improvements as shown on the approved utility plans to stabilize all over -lot grading in and adjacent to this development. The Developer is also required to post a security deposit prior to beginning construction to guarantee the proper installation and maintenance of the erosion control measures shown on the approved plans. Said security deposit shall be made in accordance with the criteria set forth in the Storm Drainage Design Criteria and Construction Standards. 3. Due to the lack of information about the impact of the alignment of existing culverts immediately downstream from lot 1 of The Gates at Woodridge, P.U.D., (The Gates), and the potential for realignment of said culverts, the Developer and the City agree that no building permit shall be issued for said lot for a period of six months from the date of this Agreement. The Developer shall perform the analysis/design for said culvert realignment and the City shall reimburse the Developer for the cost of said analysis/design in accordance with the City Code for actual documented costs (the estimated amount is shown on the attached Exhibit "B"). If the design demonstrates that it is feasible to realign said culverts and the City approves the realignment, then this agreement shall be amended for purposes of revising Exhibit "B" to include the estimated cost for said realignment as a reimbursable item pursuant to the City Code upon completion of the improvements by the Developer. If the six month period expires and the City has not made a decision or if the City determines that it is not feasible to reconstruct the culverts, the culverts shall remain as they presently exist and the Developer shall propose revisions to the utility plans that define the high water elevation on said lot and the minimum opening elevations for the building shall be set at least one foot higher than the high water elevation. Upon the City approval of the revisions to said plans, this restriction on issuance of a building permit shall be removed. Streets. 1. Subject to the conditions of this Agreement, the City agrees to reimburse the Developer for oversizing public street improvements along Harmony Road and Seneca Drive for those portions of said streets abutting the Property as shown on the approved utility plans. Reimbursement for Harmony Road shall be for oversizing the street from residential standards to arterial standards. Reimbursement for Seneca Drive shall be for oversizing the street from residential standards to collector standards. The City shall make reimbursement to the Developer for the aforesaid oversized street improvements in accordance with Section 24-121 of the Code of the City. The Developer agrees and understands that the City shall have no obligation to make reimbursement payments for street oversizing unless funds for such payments shall first have been budgeted and appropriated from the Street Oversizing Fund by the City Council; and the Developer further understands that to the extent that funds are not available for such reimbursement, the City may not, in the absence of the Developer's agreement, require the construction, at the Developer's expense, of any oversized portion of streets not reasonably necessary to offset the traffic impacts of the development. The Developer does hereby agree to construct the aforesaid oversized street improvements with the understanding that the Developer may not be fully reimbursed by the City for the cost of such construction. The Developer further agrees to accept payment in accordance with Section 24-121 (d) of the Code of the City as full and final settlement and complete accord and satisfaction of all obligations of the City to make reimbursements to the Developer for street oversizing expenses. It is anticipated by the City that the City's reimbursement, in accordance with Section 24-121 (d), would not be less than fifty percent (50%) of the Developer's actual expenses incurred and will be calculated in accordance with the formula as set forth in Section 24-121 (d). III. Miscellaneous A. The Developer agrees to provide and install, at its expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the Director of Engineering in accordance with the City's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been completed and approved by the Director of Engineering. B. The Developer shall, at all times, keep the public right-of-way free from accumulation of waste material or rubbish caused by the Developer's operation; shall remove such rubbish no less than weekly and; at the completion of the work, shall remove all such waste materials, rubbish, tools, construction equipment, machinery, and surplus materials from the public right-of-way. The Developer further agrees to maintain the finished street surfaces so that they are free from dirt caused by the Developer's operation. Any excessive accumulation of dirt and/or construction materials shall be considered sufficient cause for the City to withhold building permits and/or certificates of occupancy until the problem is corrected to the satisfaction of the Director of Engineering. If the Developer fails to adequately clean such streets within two (2) days after receipt of written notice, the City may have the streets cleaned at the Developer's expense and the Developer shall be responsible for prompt payment of all such costs. C. The Developer hereby insures that its subcontractors shall cooperate with the City's construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. When the inspector determines that erosion (either by wind or water) is likely to be a problem, the surface area of erodible earth material exposed at any one time shall not exceed 200,000 square feet for earthworks operations. Temporary or permanent erosion control shall be incorporated into the development at the earliest practicable time. By way of explanation and without limitation, said control may consist of seeding with approved grasses, temporary dikes, gabions, and/or other devices. E. The Developer shall, pursuant to the terms of this Agreement, complete all improvements and perform all other obligations, required herein, as such improvements or obligations may be shown on the original plat and related documents, or any replat as subsequently filed by the Developer, and the City may withhold such building permits and certificates of occupancy as it deems necessary to ensure performance hereof. A F. Nothing herein contained shall be construed as a waiver of any requirements of the City Code, and the Developer agrees to comply with all requirements of the same. G. In the event the City waives any breach of this Agreement, no such waiver shall be held or construed to be a waiver of any subsequent breach hereof. H. Financial obligations of the City of Fort Collins payable after the current fiscal year and/or not appropriated or budgeted are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. I. This Agreement shall run with the Property and shall be binding upon the parties hereto, their personal representatives, heirs, successors, grantees and assigns. It is agreed that all improvements required pursuant to this Agreement touch and concern the Property regardless of whether such improvements are located on the Property. Assignment of interest within the meaning of this paragraph shall specifically include, but not be limited to, a conveyance or assignment of any portion of the Developer's real or proprietary interest in the Property, as well as any assignment of the Developer's rights to develop the Property under the terms and conditions of this Agreement. J. In the event the Developer transfers title to the Property and is thereby divested of all equitable and legal interest in the Property, the City hereby agrees to release said Developer from liability under this Agreement with respect to any breach of the terms and conditions of this Agreement occurring after the date of any such transfer of interest. In such event, the succeeding property owner shall be bound by the terms of this Agreement. K. Each and every term of this Agreement shall be deemed to be a material element hereof. In the event that either party shall fail to perform according to the terms of this Agreement, such party may be declared in default. In the event that a party has been declared in default hereof, such defaulting party shall be given written notice specifying such default and shall be allowed a period of five (5) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to: (a) terminate the Agreement and seek damages; (b) Treat the Agreement as continuing and require specific performance or; (c) avail itself of any other remedy at law or equity. L. In the event of the default of any of the provisions hereof by either party which shall require the party not in default to commence legal or equitable action against said defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney's fees and costs incurred by reason of the default. Nothing herein shall be construed to prevent or interfere with the City's rights and remedies specified in Paragraph III.E of this Agreement. 2 THE CITY OF FORT COLLINS, COLORADO, a Munic'pal Corporation By: 4A—C ity Manager ATTEST: CITY CL RK APPROVED AS TO FORM irecto bf Engineering City Attorney DEVELOPER: B & N INVE corporatiy 92 ATTEST: By: . � Li G. Berger, Secrets y e suy`e ATTEST: By;>; /i' ✓��ati� Rob rta S. Martin, Secretary (corporate seal) , a Colorado aft Homes OWNER: ARAPAHOE FARMS INC., a Delaware corporation Michael S. Byrne President (corporate seal) EXHIBIT "A" 1. Schedule of water lines to be installed out of sequence. Not Applicable. 2. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable. 3. Schedule of street improvements to be installed out of sequence. Not Applicable. 4. Schedule of storm drainage improvements to be installed out of sequence. Not Applicable. 3 EXHIBIT "B" The Development Agreement for The Gates at Woodridge First Filing The Overlook at Woodridge First Filing This exhibit does not apply to this development. COST ESTIMATE FOR MAJOR DRAINAGE IMPROVEMENTS Include only those major storm drainage basin improvements required by an adopted basin master plan. ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST 1. Storm sewer, manholes, end sections, etc. (a) L.f. /L.f. $ (b) L.f. /L.f. $ (c) Ea. Ea. $ (d) Ea. Ea. $ Sub -Total $ 2. Channel excavation, detention pond excavation and riprap (a) C.Y. $ /C.Y. $ (b) C.Y. $ /C.Y. $ (c) C.Y. $ /C.Y. $ Sub -Total $