Loading...
HomeMy WebLinkAboutCOLLINDALE BUSINESS PARK - Filed DA-DEVELOPMENT AGREEMENT - 2003-07-31DEVELOPMENT AGREEMENT ri THIS AGREEMENT, made and entered into this j day of 19V8 by and between THE CITY OF FORT COLLINS, COLORADO, a Municl_ teal korporation, hereinafter referred to as "the City", and K. Bill Tilev, an individual, hercinaf ter referred to as "the Developer". WITN ESSETH WHEREAS, the Developer is the Owner of certain property situated in the County of Larimer, State of Colorado, and legally described as follows, to -wit: COLLINDALE BUSINESS PARK, situate in the East 1/2 of Section 31, Township 7 North, Range 68 west of the 6th P.M., Fort Collins, Larimer County, Colorado. WHEREAS, the Developer desires to develop said property and has submitted to the City a subdivision plat and/or a site plan and landscape plan, a copy of which is on file in the Office of the Director of Engineer- ing and made a part hereof by reference; and WHEREAS, the Developer has further submitted to the City a utility plan for said lands, a copy of which is on file in the office of the Director of Engineering and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of said lands will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat and/or site plan and ;landscape plan submitted by the Developer subject to certain requirements and conditions which involve the installation of and construc- tion of utilities and other municipal improvements in connection with said lands. NOW, THEREFORE, in consideration of the promises of the parties hereto and other good and valuable consideration, the receipt and adc- quacy of which is hereby acknowledged, it is agreed as follows: 1. General Conditions. A. The terms of this Agreement shall govern all development activities of the Developer pertaining to the subject property described above. For the purposes of this Agreement, "devel- opment activities" shall include, but not be limited to, the following: (1) The actual construction of improvements, (2) Obtaining a building permit therefor, or (3) Any change in grade, contour or appearance of said property caused by or on behalf of the Developer with the intent to construct EXHIBIT "A" 1. Schedule of water lines to be installed out of sequence. Not 1pplicablc. chcdulc ct* sanitary se�xcr lines to be installcd out of ,equo,,,: c. Not applicable. 3. Schedule of street improvements to be installed out of sequence. Not Applicable. 4. Storm drainage improvements to be installed out of sequence. Not applicable. WE EXHIBIT "B" The Development Agreement for This exhibit does not apply to Phis developrent. COST ESTIMATE FOR MAJOR DRAINAGE IMPROVEMENTS Include only those major storm drainage basin improvements required by an adopted basin master plan. ITEM DESCRIPTION 1. Storm sewer, manholes, end sections, etc. (a) e-4-" (b) ¢-8„ cL R cP (c) /NTE[:SE67"10" MIc:�NNOLr- (d) O UFKY=Low (e) 24 ' ADS N- I PIP): fl Sub -Total 2. Channel excavation, detention pond excavation and riprap (a) r?EMO�JC TRr-r_-5 (b) EXC/-)vlc�-Tr cH/CN"Al FL (c) E905) O N CONTROL PUFW-1 G- CONST, FE-SEFD CHAIVAIEV130FP/-)L0 G9ASf Z—YEAR n/1/,g1NTENP7NCF_ Sub -Total UANTITY UNIT COST TOTAL COST 4-� L.f. 5a.00 /L• f• $ 7-45-0,00 5S ' L.f. )0.00 /L.f. $ 4�so,oD I E a. ¢2 Oy. oU Ea. $ 42 oo. 00 1 Ea. 3 OUO. 0V Ea. $ 3000.00 Z3c7 L.F• Z7.00 L F. /O U S, `/35.0o/sV .3SCY1,00 $ 24553,00 l 0 C4, . $ / 50.U0 /SA • $ l 50:� 0 0 000 C.Y. $ 3.0U/C.Y. $ 2�-00.00 Lf $ /L.'. $ 44-00,CO /0 000 .S, F J 0.06 IS.F. / 000. 00 S7- WEEK 31 l OO.0(1 wk 5W61, 00 $IQS,50, 00 EXHIBIT B - Page 2 ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST 3. Ri ght-of-bray & easement acquisition (a) S.f. $ �r (b) Ac. $ /Ac. $ Sub -Total 4. Professional Design (a) Lump Sum $ Z6-09.OQ 5. Other (a) Ga1v57RVG /0 SU1z�/l �JN� — /Z t�R (7G.00 (b) (c) Total estimated cost of Storm Drainage improvements eligible for credit or City repayment $ 3064S. 00 Prepared by: � � Title: �E LS �50Z Address: X_ improvements thereon. B. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the Council -approved standards and specifications of the City on file in the Office of the Director of Engineering to the specific utility, subject to a three (3) year time limitation from the date of execution of this agreement. In the event that the Developer commences or performs any construction pursuant hereto after three (3) years from the date of execution of this agreement, the Developer shall resubmit the project utility plans to the Director of Engineering for reexamination. The City may require the Developer to comply with approved standards and specifications of the City on file in the Office of the Director of Engineering at the time of resubmittal. C. No building permit for the construction of any structure within the development shall be issued by the City until the water lines, fire hydrants, sanitary sewer and streets (with at least the base course completed) serving such structure have been completed and accepted by the City. No building permits shall be issued for any structure located in excess of' six hundred sixty feet (660') from a single point of access. D. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A", attached hereto, shall be installed within the time and/or sequence required on Exhibit "A". If the Director of Engineering has determined that any water lines, sanitary sewer lines, storm sewer facili- ties and/or streets are required to provide service or access to other areas of the City, those facilities shall be shown on the utility plans and shall be installed by the Developer within the time as established under "Special Conditions" in this document. E. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer and storm sewer facilities and appurtenances, and all streets, curbing, gutter, sidewalks, bikeways and other public improvements required by this development as shown on the plat, utility and landscape plans, and other approved docu- ments pertaining to this development on file with the City. F. Street improvements (except curbing, gutter and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all individual lot service lines leading in and from the main to the property line. G. The installation of all utilities shown on the utility drawings shall be inspected by the Engineering Department of the City -2- and shall be subject to such department's approval. The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specif ications applicable to such installation. In case of conflict, the utility drawings shall supersede the standard specifications. (l. All storm drainage facilities shall be so designed and con- structed by the Developer as to protect downstream and adja- cent pr,,Ycrtics against injury and to adequately serve t'. property to be developed (and other lands as may be required, if any). The Developer has met or exceeded mini- mum requirements for storm drainage facilities as have been established by the City in its Drainage Master Plans and Design Criteria. The Developer does hereby indemnify and hold harmless the City from any and all claims that might arise, directly or indirectly, as a result of the discharge of injurious storm drainage or seepage waters from the develop- ment in a manner or quantity different from that which was historically discharged and caused by the design or construc- tion of the storm drainage facilities, except for ( I ) such claims and damages as are caused by the acts or omissions of the Citv in maintenance of such facilities as have been accepted by the City for maintenance; (2) errors, if any, in the general concept of the City's master plans (but not to include any details of such plans, which details shall be the responsibility of the Developer); and (3) specific directives as may be given to the Developer by the City. Approval of and acceptance by the City of any storm drainage facility design or construction shall in no manner be deemed to con- stitute a waiver or relinquishment by the City of the afore- said indemnification. The Developer shall engage a licensed professional engineer to design the storm drainage facilities as aforesaid and it is expressly affirmed hereby that such engagement shall be intended for the benefit of the City, and subsequent purchasers of property in the development. I. The Developer shall pay storm drainage basin fees in accor- dance with Chapter 26, Article VII of the City Code. Storm drainage improvements eligible for credit or City repayment under the provisions of Chapter 26 are described together with the estimated cost of the improvements on the attached Exhibit "B", which improvements, if applicable, shall include right-of-way, design and construction costs. See Section 2.C, Special Conditions, Storm Drainage Lines and Appurtenances, for specific instructions. J. The Developer shall provide the Director of Engineering with certified Record Utility Drawing Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of the construction. 992 2. Special Conditions. A. Water lines. The Developer shall reimburse the City the sum of $539.45 for the cost of installation of the 16" water line in Timberline Road adjacent to the developmcnt (calculated at the rate of 52.7664 per i'ront foot for 195 feet). Said reimbursement shall be paid prior to the time the first building per, ,it is issued for tn: development. )3. Sewer lines. The Developer shall reimburse the City the sum of $19,503.19 for the installation of the Warren Trunk Sewer which serves this development. Said reimbursement shall be paid prior to any construction activities beginning on this development. C. Storm drainage lines and appurtenances. (i) The Developer and the City agree that all on -site 4 and off -site storm drainage improvements shall be� completed by the Developer prior to the issuance �� of the first building���paFt. Completion of �GzrVAV improvements shall include the certification by a licensed professional engineer that the drainage facilities which service this development, have been constructed in conformance with the approved plans. (i i) The Developer agrees to provide and maintain erosion control improvements as shown on the approved utility plans to stabilize all over -lot grading in and adjacent to this development. The erosion control improvements must be completed prior to the issuance of any building permit. D. Streets. (i) Subject to the conditions of this agreement, the City agrees to reimburse the Developer for oversizing public street improvements along Timberline Road for those portions of the said street as shown on the approved utility plans. The City shall make reimbursement to the Developer for the aforesaid oversized street improvements in accordance with Section 24-21 of the Code of the City. The Developer agrees and understands that the City shall have no obligation to make reimbursement payments for street oversizing unless funds for such payments shall first have been budgeted and appropriated from the Street Oversizing Fund by the City Council; -4- and the Developer further understands that to the extent that funds are not available for such reimbursement, the City may not, in the absence of the Developer's agreement, require the construction, at the Developer's expense, of any oversized portion of streets not reasonably necessary to offset the traffic impacts of the development. The Developer does hereby agree to construct the aforesaid oversized street improvements with the understanding that the Developer may not be fully reimbursed by the City for the cost of such construction. The Developer further agrees to accept payment in accordance with Section 24-21 (d) of the Code of the City as full and final settlement and complete accord and satisfaction of all obligations of the City to make reimbursements to the Developer for street oversizing expenses. It is anticipated by the City that the City's reimbursement, in accordance with Section 24-21 (d), would not be less than fifty percent (50%) of the Developer's actual expenses incurred and will be calculated in accordance with the formula as set forth in Section 24-21 (d). (ii) Prior to beginning construction of improvements to Timberline Road, the Developer shall deposit with the City a cash guarantee in the form of a certificate of deposit, cash, performance bond, letter of credit or other City approved means to guarantee the completion of all public improvements to be constructed in the street rights of way in accordance with the approved utility plans on file in the office of the Director of Engineering. The amount deposited shall be equal to 100% of the estimated cost of the improvements. The estimate shall be prepared by the Developer and submitted to the Director of Engineering for review and approval. E. Hazards and Emergency Access. No combustible material will be allowed on the site until a temporary or permanent water system is installed by the Developer and approved by the City. 2. The Developer shall provide an accessway to any building under construction, adequate to handle any emergency vehicles or equipment, and to properly maintain such accessway at all times. Such accessway shall be at a minimum, 20' wide -5- with 4" aggregate base course material compacted according to City Standards and with an 80' radius turnaround at the building end of said accessway. 3. The issuance of any footing foundation permit by the City is made solely at the Developer's own risk and the Developer shall hold the City harmlcss from any and all damages or injuries arising directly or indirectly out of the issuance of said permit prior to the completion of the requirements in accordance with Section 29-678 of the Code of the City. 3. Miscellaneous. A. The Developer agrees to provide and install, at his expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the Director of Engineering in accordance with the Cit_v's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been approved by the Director of Engineering. B. The Developer shall, at all times, keep the public right- of-way free from accumulation of waste material or rub- bish caused by the Developer's operation, shall remove such rubbish no less than weekly and, at the completion of the work, shall remove all such waste materials, rub- bish, tools, construction equipment, machinery, and sur- plus materials from the public right-of-way. The Devel- oper further agrees to maintain the finished street sur- faces free from dirt caused by the Developer's oper- ation. Any excessive accumulation of dirt and/or con- struction materials shall be considered sufficient cause for the City to withhold building permits and/or certifi- cates of occupancy until the problem is corrected to the satisfaction of the Director of Engineering. If the Devel- oper fails to adequately clean such streets within two (2) days after receipt of written notice, the City may have the streets cleaned at the Developer's expense and the Developer shall be responsible for prompt payment of all such costs. C. The Developer hereby insures that his subcontractors shall cooperate with the City's construction inspectors by ceasing operations when winds are of sufficient velo- city to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. When the inspector determines that erosion (either by wind or water) is likely to be a problem, the surface area of erodible earth material exposed at any one time I Me shall not exceed 200,000 square feet for earthworks operations. Temporary or permanent erosion control shall be incorporated into the subdivision at the earliest prac- ticable time. By way of explanation and without limita- tion, said control may consist of seeding of approved grasses, temporary dikes, gabions, and/or other devices. E. The Developer shall, pursuant to the terms of this agreement, complete all improvements and perform all other obligations required herein, as such improvements or obligations may be shown on the original plat and related documents, or on any replat subsequently filed by the Developer, and the City may withhold such build- ing permits and certificates of occupancy as it deems necessary to ensure performance hereof. F. Nothing herein contained shall be construed as a waiver of any requirements of the City Code, and the Developer agrees to comply with all requirements of the same. G. In the event the City waives any breach of this agree- ment, no such waiver shall be held or construed to be a waiver of any subsequent breach hereof. H. Financial obligations of the City of Fort Collins payable after the current fiscal year and/or not appropriated or budgeted are contingent upon funds for that purpose being appropriated, budgeted and otherwise made avail- able. This Agreement shall run with the real property herein above described and shall be binding upon the parties hereto, their personal representatives, heirs, succes- sors, grantees and assigns. Assignment of interest within the meaning of this paragraph shall specifically include, but not be limited to, a conveyance or assign- ment of any portion of the Developer's real or propriet- ary interest in the real property herein after described, as well as any assignment of the Developer's rights to develop such property under the terms and conditions of this Agreement. J. In the event the Developer transfers title to such real property and is thereby divested of all equitable and legal interest in said property, the City hereby agrees to release said Developer from liability under this Agree- ment with respect to any breach of the terms and condi- tions of this Agreement occurring after the date of any such transfer of interest. In such event, the succeeding property owner shall be bound by the terms of this Agreement. -7- K. Each and every term and condition of this Agreement shall be deemed to be a material element thereof. In the event either party shall fail or refuse to perform according to the terms of this Agreement, such party may be declared in default. In the event a party has been declared in default hereof, such defaulting party shall be allowed a period of (5) days l_ F n which to cure said default. In the event the default remains uncorrected, the party declaring default may elect tz): (a) terminate the Agreement and seek - damages; (b) treat the Agreement as continuing and require specific performance; or, (c) avail itself of any other remedy at law or emiity. L. In the event the default of any of the provisions hereof by either party which shall require the party not in default to commence legal or equitable action against said defaulting party, the defaulting party shall be liable to the non -defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney's fees and costs incurred by reason of the default. Nothing herein shall be construed to prevent or interfere with the City's rights and remedies specified in Paragraph 3 E of this Agreement. -8- THE CITY OF FORT COLLINS, COLORADO A Muni ipal Corporation B v: ity ivianagir r "F EST - City Clerk APPROVED AS TO FORM: Dirccvor o,11 Engineering f City Attorney DEVELOPER: by: 7K. Bill Tiley, an individual I a,