Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8164 PLAYGROUND SURFACING CONSTRUCTION SERVICESContractor: City of Fort Collins Contact: Lea Ann Email: lahaisch@fcgov.com Date: 3/14/2017 Phone: 970-416-2061 Job: Various Parks Refresh Description Unit x amount Price Westfield: Purchase, delivery and installation of 2" of Mason Sand over entire playground area (85 tons) 1 x $5,275.00 $ 5,275.00 City Park: Purchase, delivery and installation of 2" of Mason Sand over entire playground area (230 tons) 1 x $10,260.00 $ 10,260.00 English Ranch: Purchase, delivery and installation of 2" of Mason Sand over entire playground area (50 tons) Tandems would be driven along sidewalk for this install, we will not be responsible for sidewalk damage. 1 x $2,650.00 $ 2,650.00 Landings: Purchase, delivery and installation of 3" of Mason Sand over entire playground area (125 tons) 1 x $5,425.00 $ 5,425.00 Cottonwood Glen: Purchase, delivery and installation of EWF into playground with cleanup 75 cy x $32.00 $ 2,400.00 Registry: Purchase, delivery and installation of EWF into playground with cleanup 105 cy x $32.00 $ 3,360.00 Waters Way: Purchase, delivery and installation of EWF into playground with cleanup 40 cy x $32.00 $ 1,280.00 Total $ 30,650.00 Lea Ann Payment Terms: Net 30, unless current contract reflects other terms. All overdue invoices over 60 days will incur a late fee of $75 or 1.75% of the balance (whichever is greater) added to the original invoice amount for each 30 day period past terms. To accept this proposal, please sign below and fax or email back. ACCEPTANCE OF PROPOSAL Signature _______________________________________________________ Date ______/______/20____ If you have any questions, please call Mike at 970-744-0782 and thank you for your consideration! This bid includes all labor, materials and installation. Tax is not included on material. If tax exempt certificate listing Ground Solutions as a subcontractor is not provided then tax will be added to material. Cost breakdown for sand refresh is as follows for 2017: Material: $20.00/ton Delivery and Placement with Conveyor: $16.00/ton SkidSteer: $95.00/hr Dingo: $60.00/hr Laborer: $40.00/hr per laborer Plates: $750/per use up to 8 plates Bid Proposal: 42808 1501 Backhoe Rd Loveland CO 80537 Dispatch 970.776.8150 www.bedrockslingers.com www.groundsolutionsco.com Page 1 of 2 Mike Uittenbogaard, Operations Manager Page 2 of 2