COST BREAKDOWN
SCOPE DESCRIPTION UNIT COST
$ 421.00
$ 5,100.00
$ 14,142.89
Hr. $ 6,000.00
Hr. $ 1,400.00
Hr. $ 360.00
Hr. $ 400.00
$ 27,823.89
$ 1,391.19
$ 277.54
$ 1,622.09
$ 31,114.72
CLARIFICATIONS
1) Estimated Duration: 2 Weeks
2) Price does not include permitting.
3) This proposal is a "Not to Exceed" with the potential for savings.
4)
5)
WORK ORDER REQUEST STATUS
Poudre Fire Authority Brinkman Construction, Inc.
Signature: Signature:
Date: Date:
CHANGE REQUEST TOTAL
The Owner agrees to pay for all changes in the Work performed by the Contractor under this Work Order Request according to the terms of the
Agreement. The amount paid by the Owner shall be full compensation for all Work requested and for all effects of this document on the Work. The
Owner understands that this Change Request, along with other approved Change Requests, will be complied into a Change Order at a later date.
SUBTOTAL COSTS
CONTINGENCY 5.00%
INSURANCE 0.95%
CONTACTOR OH&P 5.50%
01-04-500 BCI Project Accountant $ 50.00 8
01-01-030 BCI Asst. Project Manager $ 70.00 20
01-04-400 BCI Project Coordinator $ 45.00 8
15-40-100 Linds Plumbing
Per proposal dated 7/22/15 - Provide and install
Gas line and utilities for the temp trailer. $ 14,142.89 1
01-01-100 BCI Superintendent $ 75.00 80
08-36-100 DH Pace
Per email dated 9/21/15 - provide 1 red/green light
with auxilliary card. $ 421.00 1
05-10-100 Gregory
Per Proposal dated 9/24/15 - Provide and install
electricla service for the temp trailer. $ 5,100.00 1
TIMNATH, CO 80547 WORK ORDER PROPOSAL #: 002
Proposal includes pricing for the Gas line, utilities and electrical service to trailer. Provide and install red/green light to overhead door. Move elctrical
line conflicting with overhead door.
COST CODE SUBCONTRACTOR COST QUANTITY
PFA - WORK ORDER PROPOSAL
PROJECT NAME: PFA TEMP STATION 8 PROJECT #: 1544
PROJECT ADDRESS: 4104 MAIN ST.