HomeMy WebLinkAboutCHANGE ORDER - RFP - 8127 ENGINEERING SERVICES FOR ELECTRIC FACILITIES CAPITAL IMPROVEMENTS (2)Page 1 of 2 January 11, 2017 Ms. Janet McTague Project Engineering Supervisor City of Fort Collins 700 Wood Street Fort Collins, CO 80522 Re: Harmony Duct Bank Phase 2 – Change Order 2 Dear Ms. McTague: Exponential Engineering Company (EEC) is requesting a change order to provide the City of Fort Collins with additional professional engineering services for the Harmony Duct Bank Phase 2 project. EEC proposes the following not to exceed price agreement for the scope listed herein as follows: Not-to-Exceed Harmony Duct Bank Phase 2: Change Order 2 $17,760 The price provided is for the work scope outlined in this letter only. Any work outside of this scope will be considered extra and negotiated with the City of Fort Collins. Scope of Work: 1. Base Map Survey (Section 5): Lat40 will survey new pothole and elevation information as required by the modified vault locations and duct bank routing. EEC will coordinate potholing and pothole survey. Lat40 will coordinate traffic control. 2. Base Map Profile Drawings (Section 5): Lat40 will create new profile drawings as required for the reroute onto the travel lane of Harmony Road from west of Timberline Road to the western edge of the Union Pacific Railroad easement. New elevation information will be surveyed as required by the modified route in areas not previously surveyed. 3. Line Route Modification Plan and Profile Drawings (Section 5): Provide modified duct bank route and vault locations as required for reroute onto travel lane of Harmony Road from west of Timberline Road to the western edge of the Union Pacific Railroad easement. Rerouting will include office and field investigation and modifications of route as required by the utility locates for construction in new route. Add the new electrical infrastructure to the base map plan and profile drawings provided by Lat40. Page 2 of 2 HARMONY DUCT BANK PHASE 2: CHANGE ORDER 2 4. Railroad Crossing Permitting – Assist with creation and submittal of permitting package for Union Pacific Railroad crossing. This includes preparation of modified drawings specific to the crossing, preparation of required forms, and interpretation of requirements relevant to engineering and design. Harmony Duct Bank Phase 1 and 2 Items Not Included in Scope of Work: 1. Utility locates for potholing and construction will be ordered by Colorado Boring Company. 2. Colorado Boring Company will provide potholing services. The potholes used for engineering will also be used for construction. Please call me at (970) 207-9648 x117 if you have any questions or need additional information. EEC looks forward to working with you on this project. Sincerely, Tyler Swaney, P.E. EXPONENTIAL ENGINEERING COMPANY Electrical Engineer ESTIMATE OF ENGINEERING SERVICES COSTS PROJECT: FTCL-1502 PROJECT TITLE: Harmony Duct Bank Phase 2 - Change Order 2 DATE: 1/11/2017 PROJECT MANAGER: T. Swaney PROJECT ENGINEER: S. Benoit BILLING GROUP: 20.0% PM 5.0% QC TASK DESCRIPTION # OF DWGS Engineer I-2 Engineer II-2 Senior Designer Project Controls Manager (Select One) (Select One) (Select One) Engineer II-2 Engineer II-2 TOTAL HOURS TOTAL LABOR COSTS $132.00 $155.00 $100.00 $125.00 $0.00 $0.00 $0.00 $155.00 $155.00 HOURS HOURS HOURS HOURS HOURS HOURS HOURS HOURS HOURS Coordinate Potholing & Pothole Survey 2 0.5 11 5 $682.50 Coordinate Base Map Profile Drawing 2 0.5 11 5 $682.50 Line Route Modifications 00 0 $0.00 Line Routing 16 16 0.5 7242 $5,169.50 Plan View 4 16 0.5 5228 $3,275.50 Profile View 8 12 0.5 5228 $3,403.50 Railroad Permitting Assistance 4 2 0.5 2110 $1,255.50 00 0 $0.00 00 0 $0.00 00 0 $0.00 00 0 $0.00 00 0 $0.00 00 0 $0.00 TOTAL HOURS 32 4 46 3 0 0 0 21 9 TOTAL LABOR COSTS $4,224.00 $620.00 $4,600.00 $375.00 $0.00 $0.00 $0.00 $3,255.00 $1,395.00 TOTAL HOURS AND LABOR COSTS: 115 $14,469.00 TOTAL HOURS AND ROUNDED LABOR COSTS (TO BE USED IN PROPOSAL): 115 $14,470.00 AVERAGE BILLING GROUP RATE: $0.00 REIMBURSABLE EXPENSES RATE QTY COST REIMBURSABLE TRIP EXPENSES - TRIP 1 Prints and Plots (22" X 34") BW $1.20 $0.00 Trip 1 Name: Prints (22" x 34") COLOR $10.00 $0.00 EXPENSE RATE QTY # PEOPLE # OF TRIPS COST Labor Costs $14,470.00 Copies (11" x 17") $0.20 $0.00 Mileage $0.775 $0.00 Reimbursable Expenses $0.00 Copies (11" x 17") COLOR $0.50 $0.00 Airfare $750.00 $0.00 Outside Services $3,290.00 Copies (8.5" x 11") $0.10 $0.00 Per Diem (per day) $46.00 $0.00 Trip 1 $0.00 Copies (8.5" x 11") COLOR $0.25 $0.00 Lodging (per night) $125.00 $0.00 Trip 2 $0.00 High Level Design and Analysis Software $12.50 $0.00 Car Rental (per day) $50.00 $0.00 Billing Group Total $17,760.00 PSS/E Power Systems Analysis Software $100.00 $0.00 Parking and Tolls (total) $15.00 $0.00 GPS Survey Grade Equipment (per week) $1,500.00 $0.00 (Other) $0.00 GPS Survey Grade Equipment (per day) $500.00 $0.00 (Other) $0.00 Arc Flash Labels (each) $1.50 $0.00 (Other) $0.00 (Other) $0.00 TOTAL "TRIP 1" REIMBURSABLE EXPENSES: $0.00 (Other) $0.00 TOTAL ROUNDED "TRIP 1" REIMBURSABLE EXPENSES $0.00 (Other) $0.00 (Other) $0.00 REIMBURSABLE TRIP EXPENSES - TRIP 2 TOTAL REIMBURSABLE EXPENSES: $0.00 Trip 2 Name: TOTAL ROUNDED REIMBURSABLE EXPENSES $0.00 EXPENSE RATE QTY # PEOPLE # OF TRIPS COST Mileage (per mile) $0.775 $0.00 OUTSIDE SERVICES (SUB'S, ETC.) RATE QTY COST Airfare $750.00 $0.00 Lat40 Pothole Survey $2,200.00 1 $2,200.00 Per Diem (per day) $46.00 $0.00 Traffic Control $1,090.00 1 $1,090.00 Lodging (per night) $125.00 $0.00 $0.00 Car Rental (per day) $50.00 $0.00 $0.00 Parking and Tolls (total) $15.00 $0.00 $0.00 (Other) $0.00 TOTAL OUTSIDE SERVICES: $3,290.00 (Other) $0.00 0% Markup $0.00 (Other) $0.00 TOTAL OUTSIDE SERVICES WITH MARKUP: $3,290.00 TOTAL "TRIP 2" REIMBURSABLE EXPENSES: $0.00 TOTAL ROUNDED OUTSIDE SERVICES $3,290.00 TOTAL ROUNDED "TRIP 2" REIMBURSABLE EXPENSES $0.00 COST SUMMARY 002 - DESIGN SERVICES