Page 1 of 2
June 20, 2016
Ms. Janet McTague
Project Engineering Supervisor
City of Fort Collins
700 Wood Street
Fort Collins, CO 80522
Re: Harmony Duct Bank Phase 1 and 2 – Additional Scope Proposal Revision 1
Dear Ms. McTague:
Exponential Engineering Company (EEC) is pleased to submit a proposal to provide
the City of Fort Collins with additional professional engineering services for the
Harmony Duct Bank Phase 1 and 2.
EEC proposes the following not to exceed price agreement for the scope listed herein
as follows:
Not-to-Exceed
Harmony Duct Bank Phase 1 and 2 – Additional Scope $9,720
The price provided is for the work scope outlined in this letter only. Any work outside
of this scope will be considered extra and negotiated with the City of Fort Collins.
Harmony Duct Bank Phase 1 and 2 Proposed Scope of Work:
1. Phase 2 Existing Easement Staking – Lat40 will stake the northerly limits of
the existing easements that parallel the proposed duct bank route at 100 foot
intervals. In areas where there is not an existing easement or the existing
easement is blanket in nature across the parcel Lat40 will stake the centerline
of the proposed duct bank.
2. Phase 1 and 2 Pothole Survey – Lat40 will locate pothole locations for the 7
vault to vault spans as staged by construction scheduling. Colorado Boring
Company will provide existing utility depths to Lat40.
3. Line Route Modifications per Utility Locates – Provide modified duct bank
route and vault locations as required by the utility locates for construction.
Page 2 of 2
FTCL-1502 HARMONY DUCT BANK PHASE 1 AND 2 ADDITIONAL SCOPE
Harmony Duct Bank Phase 2 Items Not Included in Scope of Work:
1. Utility locates for construction will be ordered by Colorado Boring Company.
2. Colorado Boring Company will provide potholing services. The potholes used
for construction will also be used for engineering.
Please call me at (970) 207-9648 x117 if you have any questions or need additional
information. EEC looks forward to working with you on this project.
Sincerely,
Tyler Swaney, P.E.
EXPONENTIAL ENGINEERING COMPANY
Electrical Engineer
ESTIMATE OF ENGINEERING SERVICES COSTS
PROJECT: FTCL-1502
PROJECT TITLE: Harmony Duct Bank Phase 1 & 2 - Additional Scope
DATE: 6/20/2016
PROJECT MANAGER: T. Swaney
PROJECT ENGINEER: S. Benoit
BILLING GROUP:
5.0% PM 2.5% QC
TASK DESCRIPTION # OF DWGS Engineer I-2 Engineer II-1 Senior Designer (Select One) (Select One) (Select One) (Select One) Engineer II-1 Engineer II-1 TOTAL HOURS TOTAL LABOR
COSTS
$132.00 $142.00 $100.00 $0.00 $0.00 $0.00 $0.00 $142.00 $142.00
HOURS HOURS HOURS HOURS HOURS HOURS HOURS HOURS HOURS
Easement Staking Site Investigation 1 1 10 3 $416.00
Design Changes Per Utility Locates / Site Investigation 16 16 2135 $4,138.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
00 0 $0.00
TOTAL HOURS 17 1 16 0 00031
TOTAL LABOR COSTS $2,244.00 $142.00 $1,600.00 $0.00 $0.00 $0.00 $0.00 $426.00 $142.00
TOTAL HOURS AND LABOR COSTS: 38 $4,554.00
TOTAL HOURS AND ROUNDED LABOR COSTS (TO BE USED IN PROPOSAL): 38 $4,560.00
AVERAGE BILLING GROUP RATE: $0.00
REIMBURSABLE EXPENSES RATE QTY COST REIMBURSABLE TRIP EXPENSES - TRIP 1
Prints and Plots (22" X 34") BW $1.20 $0.00 Trip 1 Name:
Prints (22" x 34") COLOR $10.00 $0.00 EXPENSE RATE QTY # PEOPLE # OF TRIPS COST Labor Costs $4,560.00
Copies (11" x 17") $0.20 $0.00 Mileage $0.775 $0.00 Reimbursable Expenses $0.00
Copies (11" x 17") COLOR $0.50 $0.00 Airfare $750.00 $0.00 Outside Services $5,160.00
Copies (8.5" x 11") $0.10 $0.00 Per Diem (per day) $46.00 $0.00 Trip 1 $0.00
Copies (8.5" x 11") COLOR $0.25 $0.00 Lodging (per night) $125.00 $0.00 Trip 2 $0.00
High Level Design and Analysis Software $12.50 $0.00 Car Rental (per day) $50.00 $0.00 Billing Group Total $9,720.00
PSS/E Power Systems Analysis Software $100.00 $0.00 Parking and Tolls (total) $15.00 $0.00
GPS Survey Grade Equipment (per week) $1,500.00 $0.00 (Other) $0.00
GPS Survey Grade Equipment (per day) $500.00 $0.00 (Other) $0.00
Arc Flash Labels (each) $1.50 $0.00 (Other) $0.00
(Other) $0.00 TOTAL "TRIP 1" REIMBURSABLE EXPENSES: $0.00
(Other) $0.00 TOTAL ROUNDED "TRIP 1" REIMBURSABLE EXPENSES $0.00
(Other) $0.00
(Other) $0.00 REIMBURSABLE TRIP EXPENSES - TRIP 2
TOTAL REIMBURSABLE EXPENSES: $0.00 Trip 2 Name:
TOTAL ROUNDED REIMBURSABLE EXPENSES $0.00 EXPENSE RATE QTY # PEOPLE # OF TRIPS COST
Mileage (per mile) $0.775 $0.00
OUTSIDE SERVICES (SUB'S, ETC.) RATE QTY COST Airfare $750.00 $0.00
Lat40 Easement Staking $2,450.00 1 $2,450.00 Per Diem (per day) $46.00 $0.00
Lat40 Pothole Survey $2,705.00 1 $2,705.00 Lodging (per night) $125.00 $0.00
$0.00 Car Rental (per day) $50.00 $0.00
$0.00 Parking and Tolls (total) $15.00 $0.00
$0.00 (Other) $0.00
TOTAL OUTSIDE SERVICES: $5,155.00 (Other) $0.00
0% Markup $0.00 (Other) $0.00
TOTAL OUTSIDE SERVICES WITH MARKUP: $5,155.00 TOTAL "TRIP 2" REIMBURSABLE EXPENSES: $0.00
TOTAL ROUNDED OUTSIDE SERVICES $5,160.00 TOTAL ROUNDED "TRIP 2" REIMBURSABLE EXPENSES $0.00
COST SUMMARY
002 - DESIGN SERVICES