HomeMy WebLinkAboutWORK ORDER - RFP - 7616 WETLAND RIVER & FLOODPLAIN ECOLOGICAL RESTORATION (11)Professional Services Agreement – Work Order Type
7616 Wetland, River & Floodplain Ecological Restoration Page 13 of 15
EXHIBIT C
COMPENSATION
DocuSign Envelope ID: 77D2F1D4-9FBD-435B-B8B8-F032F06A367F
April 27, 2016
Rick Bachand
Project Manager
Fort Collins Natural Areas Program
PO Box 580
Fort Collins, CO 80522-0580
PROJECT: Willow Outfall Live Staking
PROJECT NO. 14912.XX 2014 Ecological Restoration On-Call
Dear Mr. Bachand,
In response to the recent communications regarding the new Willow Outfall in Udall Natural
Area, Biohabitats is submitting to you this proposal to harvest and install live willow stakes in the
outfall riprap. Biohabitats will harvest willow branches from the populations surrounding Udall
Ponds. From the harvested branches, we will cut stakes and install them in the riprap joints,
using a stinger attachment to bore pilot holes into the riprap joints. The exact number of stakes
will depend on material availability and ease of installation; we are aiming for an installation
density that results in an average grid with stakes on between 1-foot to 2-foot centers.
This proposal covers up to 2 days of installation work. Additional time over 2 days will require a
change order to this agreement. Our fee to conduct this project is $9,800.
This work is dependent on Poudre River water levels. If river levels are too high, it may need to
be postponed.
Thanks for your consideration of this proposal and for the opportunity to continue to assist you
and the Natural Areas Department. If you have any questions or concerns, please call me at
(303) 477-0660.
Sincerely,
Michael Lighthiser, Project Manager