Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (4)Estimate Date 8/20/2015 Estimate # C1219 Bill To: City of Fort Collins Engineering Department P.O. Box 580 Fort Collins, Co. 80522 Project Location McClelland and Swallow Bus stop P.O./ Work order # Terms Net 30 Representat... CH We look forward to hearing from you! Phone # 970-484-3880 Fax # 970-416-6230 E-mail mail@Lightfieldenterprises.com Total We propose to furnish material and labor-complete in accordance with the above specifications. All work to be completed in a professional manner and in accordance with industry standards. Any alteration or deviation from above specifications must be done in writing. Estimate is good for 30 days. Acceptance of Proposal: The above prices, specifications and conditions are satisfactory and are hereby accepted. Lightfield Enterprises, Inc. is authorized to do work as specified. I agree to pay as outlined in the "Terms" stated above. Date of acceptence________________________Signature_____________________________________________ 2601 Riverbend Ct #100 Fort Collins CO 80525 Description QtyUnit Total Remove Concrete Curb & Gutter 475 SF 1,933.25 Remove Concrete Pavement - 10" 450 SF 1,899.00 Remove Asphalt - 6" 450 SF 994.50 Excavation - General Over 50 CY 325 CY 11,700.00 Stormwater Protection - Rock Filled Wattle 20 LF 240.00 Aggregate Base Course/Recycled Concrete Base > 5 Tons 100 TN 3,193.00 Concrete Pavement 8" (Joints Sealed) 1,600 SF 11,872.00 Replace Flatwork - 1" Additional Depth 4,000 SF 4,680.00 Flatwork - 6" 1,600 SF 8,032.00 Vertical Curb and Gutter - No Sidewalk 200 LF 5,082.00 Traffic Control Supervisor 16 DAY 6,015.20 Flagging 250 HR 7,000.00 Cone With Reflective Strip 300 PEPD 270.00 Vertical Panel Without Light 240 PEPD 276.00 Size A Sign With Stand 108PEPD 199.80 Contracted potholing 1 LS 2,400.00 $65,786.75