Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9151212February 20, 2015 Dwight Dufloth Water Department, City of Fort Collins Dear Mr. Dufloth, I wanted to send a follow up letter to make sure that there was clarity with the invoice that was submitted from Square Shopping Center LLC. The invoice for $21506.00 was reflective of the agreement reached between the City of Fort Collins and Square Shopping Center LLC for the paving that was needed on the private property owned by Square Shopping Center LLC after the City of Fort Collins water department replaced the water main in the parking areas of Square Shopping Center LLC. Sincerely, Square Shopping Center LLC Carrie Carrie Ann Gillis Square Shopping Center LLC 970-217-0790 quare hopping Center LLC P.O. BOX 1001 TUSTIN, CA 92781 Phone: (714) 838-3737 Fax: (714) 832-9160 COST ESTIMATE JOB LOCATION The Square Shopping Center - Trader Joes Water Line w/ Chili's service Parking lot alignment patching only, 6" x 7' x 865' LABOR Employee Crew # of emp Rate Hrs. Total Crew Chief Streets / Rehab 1 $51.00 11 $561.00 EO-2 Streets / Rehab 2 $45.00 11 $990.00 EO-1 Streets / Rehab 5 $38.00 11 $2,090.00 MATERIAL Type Tons Cost Total 1.5" Asphalt $43.00 $0.00 .75" Asphalt 165 $47.00 $7,755.00 .50" Asphalt 82 $50.00 $4,100.00 Crack Seal Lbs. $0.53 $0.00 EQUIPMENT Description Number of units Hrs. Rate Total Trucks 4 10.5 $66.00 $2,772.00 Loader 1 5.5 $55.00 $302.50 Back Hoe $55.00 $0.00 Mill 1 2.5 $325.00 $812.50 Paver 1 4.5 $225.00 $1,012.50 Roller 2 4.5 $40.00 $360.00 Tool Truck 1 2 $24.00 $48.00 Crew Truck $10.00 $0.00 Grade Tractor $44.50 $0.00 Blade $90.00 $0.00 Skid Steer 1 4.5 $40.00 $180.00 Saw 1 1.5 $15.00 $22.50 Air Compressor $14.00 $0.00 Crack Seal Machine $35.00 $0.00 TOTALS Estimate Actual LABOR $3,641.00 MATERIAL $11,855.00 EQUIPMENT $5,510.00 TRAFFIC CONTROL $500.00 CONTINGENCY TOTAL $21,506.00 Doug Groves Construction Inspector Streets Department City of Fort Collins (970) 221-6280 Office (970) 222-0596 Mobile degroves@fcgov.com S:\Streets\WFO\2014\Estimates\TheSquare1.xls 6/23/2014