REQUEST FOR PROPOSAL
8847 CURED-IN-PLACE PIPE
SANITARY SEWERS/STORMWATER MAINS REHABILITATION
The City of Fort Collins is requesting proposals from qualified Service Providers for Sanitary
Sewers/Stormwater Mains Rehabilitation. Various sizes of pipe are to be rehabilitated using the
Cured-In-Place Pipe process.
As part of the City’s commitment to Sustainable Purchasing, proposals submission via
email is preferred. Proposals shall be submitted in a single Microsoft Word or PDF file
under 20MB and e-mailed to: purchasing@fcgov.com. If electing to submit a hard copy
proposal we require one (1) hard copy and one (1) electronic copy on a jump drive to be
received at the City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort
Collins, Colorado 80524. Proposals must be received before 3:00 p.m. (our clock) on
March 11, 2019 and referenced as Proposal No. 8847. If delivered, they are to be sent to 215
North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box
580, Fort Collins, 80522-0580. Please note, additional time is required for bids mailed to the PO
Box to be received at the Purchasing Office.
The City encourages all Disadvantaged Business Enterprises (DBEs) to submit proposals in
response to all requests for proposals. No individual or business will be discriminated against
on the grounds of race, color, sex, or national origin. It is the City’s policy to create a level
playing field on which DBEs can compete fairly and to ensure nondiscrimination in the award
and administration of all contracts.
A pre-proposal meeting will be held at 1:00 PM MST, on February 20, 2019 at 700 Wood
Street, Fort Collins.
All questions should be submitted, preferably in writing via email, to Pat Johnson, CPPB,
Senior Buyer at pjohnson@fcgov.com, no later than 4:00 PM MT (our clock) on
February 26, 2019. Please format your e-mail to include: 8821 Independent Cost Estimating
Services in the subject line. Questions received after this deadline may not be answered.
Responses to all questions submitted before the deadline will be addressed in an addendum and
posted on the Rocky Mountain E-Purchasing System webpage.
Rocky Mountain E-Purchasing System hosted by Bidnet
A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins.
This RFP has been posted utilizing the following Commodity Code(s):
91377 Maintenance & Repair, Pipe Culvert
91378 Maintenance & Repair, Pipeline
Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records
Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject
to public disclosure by the City pursuant to CORA and City ordinances. Vendors may submit
one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 2 of 126
of the proposal, the Vendor may redact text and/or data that it deems confidential or proprietary
pursuant to CORA. Such statement does not necessarily exempt such documentation from
public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other
applicable law. Generally, under CORA trade secrets, confidential commercial and financial
data information is not required to be disclosed by the City. Proposals may not be marked
“Confidential” or ‘Proprietary’ in their entirety. All provisions of any contract resulting from
this request for proposal will be public information.
New Vendors: The City requires new Vendors receiving awards from the City to fill out and
submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the
W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s
Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please
do not submit with your proposal.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall
have a financial interest in the sale to the City of any real or personal property, equipment,
material, supplies or services where such officer or employee exercises directly or indirectly any
decision-making authority concerning such sale or any supervisory authority over the services to
be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity favor, entertainment, kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited.
Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will
be rejected and reported to authorities as such. Your authorized signature of this proposal
assures that such proposal is genuine and is not a collusive or sham proposal.
The City of Fort Collins reserves the right to reject any and all proposals and to waive any
irregularities or informalities.
Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow
other state and local governmental agencies, political subdivisions, and/or school districts to
utilize the resulting award under all terms and conditions specified and upon agreement by all
parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in
the current term or in any future terms.
The selected Vendor shall be expected to sign the City’s standard Agreement prior to
commencing Services (see sample attached to this Proposal).
Sincerely,
Gerry Paul
Purchasing Director
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 3 of 126
TABLE OF CONTENTS
Invitation 1
Table of Contents 3
Background & Objective 4
Scope of Services 4
Scope of Work 4
Additional Terms 11
Proposal Submittal 16
Review and Assessment Criteria 20
Exhibit A: Sample Services Agreement, Work Order Type 22
Work Order Form (short form, under $100,000) 29
Work Order Form (over $100,000) 31
00525 Work Order, Notice of Award & Bid Schedule 34
00530 Work Order Notice to Proceed 39
00600 Bonds and Certificates 40
00610 Performance Bond 41
00615 Payment Bond 43
00630 Certificate of Insurance 45
00635 Certificate of Substantial Completion 46
00640 Certificate of Final Acceptance 47
00650 Lien Waiver Release (SERVICE PROVIDER) 48
00651 Lien Waiver Release (SUBCONTRACTOR) 50
00660 Consent of Surety 52
00670 Application for Exemption Certificate 53
00950 Work Order Change Order Form 55
00960 Application for Payment 56
Attachment A DRAWING INDEX 58
General Scope of Services 59
Bid Schedule 60
Insurance Exhibit 61
Confidentiality Agreement 62
Change Order Form 63
CONDITIONS OF THE CONTRACT
Exhibit B: 00700 General Conditions 64
Exhibit C: 00800 Supplementary Conditions 118
Exhibit D: Sample Mutual Non-Disclosure Agreement 122
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 4 of 126
I. BACKGROUND & OBJECTIVE
A. Objective
The City of Fort Collins is requesting proposals from qualified Service Providers for Sanitary
Sewers/Stormwater Mains Rehabilitation. Various sizes of pipe are to be rehabilitated using
the Cured-In-Place Pipe process.
B. Background
Over the last thirty (30) years the City of Fort Collins has installed a variety of sizes of cured-
in-place pipe and the appurtenances to go with them. For the next several years, the intent
is to do approximately 10,000’ per year with sizes ranging from 6” to 33”. The combination of
sizes each year, comes from the size of the pipe in the ground for the specific projects that
are chosen. For the past 3 years, below is an average of the sizes used.
1,000’ of 6”
7,200’ of 8”
2,000’ of 10”
1,000’ of 12”
1,000’ of 15”
1,000” of 30”
100’ of 33”
130 service laterals
12 intruding taps
30 manhole rehabilitations
II. SCOPE OF SERVICES
A. SCOPE OF WORK
The following scope of work is the amount expected to be installed in a year’s time,
however there is no guarantee of any work.
Definitions:
VCP Vitrified Clay Pipe
RCP Reinforced Concrete Pipe
CIPPR Cured in Place Pipe Repair
1. Pipe Diameter Sanitary Sewer
6” VCP 1,000 lineal feet
8” VCP 4,000 lineal feet
10” VCP 2,000 lineal feet
12” VCP 1,000 lineal feet
18” VCP 1,200 lineal feet
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 5 of 126
2. Pipe Diameter Stormwater
10” VCP/RCP 100 lineal feet
12” VCP/RCP 300 lineal feet
15” VCP/RCP 200 lineal feet
18” VCP/RCP 500 lineal feet
24” VCP/RCP 200 lineal feet
30” VCP/RCP 100 lineal feet
36” VCP/RCP 100 lineal feet
3. CCIPR Point Repairs Stormwater
10” CIPPR 0’ - 5’ Length 1 Each
10” CIPPR 6’ - 10’ Length 1 Each
10” CIPPR 11’ - 15’ Length 1 Each
10” CIPPR 16’ - 20’ Length 1 Each
12” CIPPR 0’ - 5’ Length 1 Each
12” CIPPR 6’ - 10’ Length 1 Each
12” CIPPR 11’ - 15’ Length 1 Each
12” CIPPR 16’ - 20’ Length 1 Each
15” CIPPR 0’ - 5’ Length 1 Each
15” CIPPR 6’ - 10’ Length 1 Each
15” CIPPR 11’ - 15’ Length 1 Each
15” CIPPR 16’ - 20’ Length 1 Each
18” CIPPR 0’ - 5’ Length 1 Each
18” CIPPR 6’ - 10’ Length 1 Each
18” CIPPR 11’ - 15’ Length 1 Each
24” VCP 1,600 lineal feet
30” RCP 100 lineal feet
36” RCP 800 lineal feet
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 6 of 126
18” CIPPR 16’ - 20’ Length 1 Each
24” CIPPR 0’ - 5’ Length 1 Each
24” CIPPR 6’ - 10’ Length 1 Each
24” CIPPR 11’ - 15’ Length 1 Each
24” CIPPR 16’ - 20’ Length 1 Each
30” CIPPR 0’ - 5’ Length 1 Each
30” CIPPR 6’ - 10’ Length 1 Each
30” CIPPR 11’ - 15’ Length 1 Each
30” CIPPR 16’ - 20’ Length 1 Each
36” CIPPR 0’ - 5’ Length 1 Each
36” CIPPR 6’ - 10’ Length 1 Each
36” CIPPR 11’ - 15’ Length 1 Each
36” CIPPR 16’ - 20’ Length 1 Each
48” CIPPR 0’ - 5’ Length 1 Each
48” CIPPR 6’ - 10’ Length 1 Each
48” CIPPR 11’ - 15’ Length 1 Each
48” CIPPR 16’ - 20’ Length 1 Each
4. Service Connections
Service Connections: 130
Protruding Taps: 20
Manhole rehabilitation (Class A): 35
5. Preconstruction Conference
After the contract award and prior to commencing work, the Service Provider will
attend a preconstruction conference. The Service Provider will have the following
submittal available for City of Fort Collins approval: traffic control plans, fire hydrant
metering, homeowner notification letter, summary of equipment to be used, sources
of materials, summary of trenchless lining method to be used, subcontractors,
proposed method of handling existing sewage while replacing lines.
6. Pumping and Bypassing
When pumping and bypassing is required, the Service Provider shall provide a
bypass plan to the City for approval, supply the pumps, conduits, and other
equipment to divert the flow of sewage around the manhole section in which work is
to be performed. The bypass system shall be of sufficient capacity to handle existing
peak flow plus additional flow that may occur during a storm. The bypassing system
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 7 of 126
shall be water tight and not leak. The Service Provider will be responsible for
furnishing the necessary labor and supervision to set up and operate the pumping
and bypassing system. At no time will the bypass operation be unattended.
Pumps shall be equipped in a manner to keep hose noise to a minimum. Standby
equipment will be available to allow continuous operation of bypass pumping despite
equipment, pump, or generator failure. All bypassed sewage flow shall be returned
to the sanitary sewer system. The bypass piping shall not interfere with traffic unless
absolutely necessary. The use of steel plates or other ramp materials is anticipated.
With this type of sewer line rehabilitation, interruptions of the normal flow of sewage
from residences and businesses are expected. The Service Provider will be
responsible for notifying the affected users and insuring that any interruptions are as
brief as possible.
7. Flow Control Precautions
Precautions must be taken to insure sewer flow control operations do not cause
flooding or damage to public or private property being served by the sewers involved.
Service Provider will be liable for private property damages caused by sewer
blockages resulting from Service Provider’s activities or lack of action to prevent.
Service Provider will be liable for punitive damages should the City of Fort Collins
be fined by a regulatory agency because of the Service Provider’s failure to control
sewage flow.
8. Clean up
The Service Provider will remove all internal debris out of the sewer line that will
interfere with the installation of cured-in-place pipe.
Upon acceptance of the cured-in-place pipe installation and testing, the Service
Provider will restore surface to original condition within the project area affected by
the operations.
Waste material from sewer line and site restoration will be disposed of by the Service
Provider at his expense. All waste will be disposed of according to all local, state and
federal regulations. Waste disposal cost shall be included in the per unit pricing.
9. Line Obstruction
It will be the responsibility of the Service Provider to clear the line of obstructions
such as solids, roots and protruding service connections that will prevent the
insertion of the liner. If inspection reveals an obstruction such as protruding service
connection, dropped joint, or a collapse that will prevent the cured-in-place pipe
process, and it cannot be removed by conventional sewer cleaning equipment, then
the City of Fort Collins project manager will make a decision for the appropriate
action prior to the commencement of the work.
10. Service Line Location
During the inspection of the sanitary and storm sewer lines the Service Provider will
be responsible for locating all service connections to the sanitary and storm sewer
mains. The Service Provider will also determine if each individual service connection
is active or inactive and to what property they are connected. Inactive service
connections may or may not be reconnected. The project manager will make the
final decision on reconnecting inactive services.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 8 of 126
11. Inspection of Pipeline
Prior to lining the pipe the Service Provider will clean and television inspect the
sanitary and storm sewer lines. The Service Provider will inspect the sanitary and
storm lines with a closed circuit television unit (CCTV). At the time of this inspection
the Service Provider will produce a hard copy TV reports and video files of the
complete project.
12. Hours
Working hours are from 8:00 am to 5:00 pm Monday through Friday and does not
include recognized holidays. City Project Manager may agree, in writing, to overtime
or night work if conditions require it.
13. Confined Space Entry
Any Service Provider retained by the City of Fort Collins to perform permit space
entry operations shall: Inform the City of Fort Collins of the permit space program
that the Service Provider will follow and of any hazards confronted or created in
permit spaces, whether through a debriefing or during the entry operations.
14. Traffic Control
The Service Provider shall follow all City of Fort Collins codes and regulations, which
include the “Manual of Traffic Control Devices” and the “Colorado Supplement” to
this manual.
The Service Provider will submit a written Traffic Control Plan in accordance with
previously mentioned codes and manuals. When the contracted project requires
more than one traffic control plan, more than one will be provided. All traffic control
plans will be submitted to the Traffic Operations Superintendent.
The Service Provider shall appoint a Traffic Control Supervisor to this project. The
Traffic Control Supervisor shall be certified as a Worksite Traffic Supervisor by the
American Safety Services Association (ATSSA). Traffic control is to be paid for as
part of the unit price for various other work and shall not be paid for separately.
Awarded Contractor(s) may be required to provide traffic control for projects.
Contractor(s) will itemize traffic control on each scope of work based on the pricing
established by the Agreement.
Contractor(s) shall provide all equipment necessary to protect the safety and well-
being of employees, motorists and all others who come in contact with construction
areas. Such precautions include, but are not limited to, crash cushions, flashing
arrow boards, lighted barricades, steel plates, and concrete barriers.
Existing public streets or highways shall be kept open to traffic at all times by
Contractor(s) unless permission to close these streets, or portions thereof, is granted
by the City of Fort Collins, Larimer County and/or CDOT. In addition, the City of Fort
Collins Traffic Department must be contacted by the Contractor per permit
requirements if any streets are closed or partially closed, unless approved by the City
of Fort Collins Traffic Department to implement emergency repairs. The City of Fort
Collins’s PM may request that the Contractor(s) make additional notifications to
property owners.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 9 of 126
Traffic control devices shall be installed at the inception of construction operations,
and shall be properly maintained, relocated as necessary, cleaned, and operated
during the time they are in use. They shall remain in place only as long as they are
needed and shall be immediately removed thereafter. Where operations are
performed in stages, only those devices that apply to the conditions present shall be
left in place.
During periods when not warranted, warning signs and other devices shall be
removed from the work area, covered with specified material, or otherwise positioned
so that they do not convey their message to the traveling public. Covering material
shall be maintained in a neat manner during its use.
Contractor(s) shall continuously review and maintain all traffic control measures to
assure that adequate provisions have been made for the safety of the public and
workers.
15. Public Information and Notification
The Service Provider will be responsible for contacting each home/apartment or
business connected to the sanitary sewer informing them of the work to be done, and
when the system will be off line and including but not limited to the following:
a. Written notification to be delivered by mail one week prior to installation to each
home or business describing work, schedule, what impact or how it affects
tenants or owners, and a local telephone number of the Service Provider they
can call to discuss the project or problems. This is mandatory no exceptions will
be allowed. Service Provider is required to work with Utilities Customer
Connections staff to create the notification.
b. Personal contact with homeowners or apartment manager/front office on the day
of pre-installation inspection of the sewer. Each lateral shall be verified by
having the owner/tenant run water down their drain. If the owner/tenant is
unavailable, other arrangements shall be made to drain water through the lateral.
c. Personal contact with owner/tenant or apartment manager/front office and written
notice the day prior to beginning reconstruction of the section of sewer to which
they are connected.
d. Personal contact with any home or business which cannot be reconnected within
the time stated in the written notice.
e. If required by a served business or homeowner, portable toilets for use by the
occupants will be furnished and serviced by the Service Provider. The cost of
these items is considered to be included in the cost of the cured-in-place pipe
installation. No additional payment will be made for these items.
f. Daily notification of job location and schedule to the project manager is
mandatory. This will be accomplished by emailing a report the night before or on
the morning work will begin. This will be done for each location. The City of Fort
Collins Utilities project manager will provide the necessary email information at
the pre-construction meeting.
g. The use of water from fire hydrants will be free to the Service Provider. However
a hydrant meter/backflow preventer with auxiliary valve will be connected to the
approved fire hydrant. Only fire hydrants approved by the City of Fort Collins will
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 10 of 126
be used. All fire hydrant use will be coordinated through the Water Utilities leak
detection specialist Lindy Westcott @ 970-221-6234 or 970-222-0064.
16. Installation
Cured-in-place pipe installation shall be in accordance with ASTM F1216, Section 7.
The quantity of resin used for tube impregnation shall be sufficient to fill the volume
or air voids in the tube with additional allowances for polymerization shrinkage and
the loss of resin through cracks and irregularities in the original pipe wall. A vacuum
impregnation process shall be used. A roller system shall be used to uniformly
distribute the resin throughout the tube.
17. Reinstatement of branch connections
Branch connections will be reopened without excavation, utilizing a remote controlled
cutting device, monitored by a video TV camera. The Service Provider will certify
they have a minimum of two (2) complete working cutters before reconstruction. No
additional payment will be made for excavations for the purpose of reopening
connections and the Service Provider will be responsible for all costs and liability
associated with such excavation and restoration work. No service connection will
remain out of service for more than 24 hours without the Service Provider providing
some means of temporary facilities or hotel accommodations for the residents.
Service lines will be reconnected with 100% of their original capacity.
18. Quality control
The Service Provider will be responsible for the quality, safety and protection of work
until accepted by the City of Fort Collins.
19. Inspection
Cured-in-place pipe samples will be prepared and tested in accordance with ASTM
F1216, Section 8.1 using method 8.1.1 when space and size permits. The results
will be submitted to the City of Fort Collins.
A television inspection of the completed project will be performed by the Service
Provider. The City of Fort Collins will have a representative present at the time of
this inspection. At the time of this inspection the Service Provider will produce a
DVD of the entire project/work order. These video DVD’s will be delivered to the
project manager at completion of the project/work order. The Service Provider will
maintain bypassing operations during this inspection so the entire circumference of
the pipe can be viewed.
20. Materials
The tube requirement shall meet the requirements of ASTM F1216.
21. Quarter Section Maps and TV Report
Awarded Service Provider will be expected to sign a Non-Disclosure form (attached)
in order to receive the quarter section maps.
The City will provide a copy of the TV report, if available, to the awarded Service
Provider.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 11 of 126
B. ADDITIONAL TERMS
1. Standard of Conduct:
The successful firm shall be responsible for maintaining satisfactory standards of
employees' competency, conduct, courtesy, appearance, honesty, and integrity, and
shall be responsible for taking such disciplinary action with respect to any employee,
as may be necessary.
The personal conduct of the Service Provider and its staff has a direct impact on the
quality of performance. Unacceptable personal conduct/behavior by the Service
Provider, as defined herein, may result in immediate or early termination of the
Agreement.
The City may request the Service Provider to immediately remove from this
assignment any employee found unfit to perform duties due to one or more of the
following reasons: (1) Neglect of duty. (2) Disorderly conduct, use of abusive or
offensive language, quarreling, intimidation by words or actions or fighting. (3) Theft,
vandalism, immoral conduct or any other criminal action. (4) Selling, consuming,
possessing, or being under the influence of intoxicants, including alcohol, or
substances while on assignment for the City.
All City owned or operated facilities and their grounds are non-smoking sites. All City
parks, trails and natural areas are also non-smoking.
Agents and employees of Service Provider working for the City shall present a clean
and neat appearance. Prior to performing any work for the City, Service Provider
shall require each of their employees to wear ID badges or uniforms identifying:
Service Provider by name, the first name of their employee and a photograph of their
employee if using an ID badge. Their employee shall wear or attach the ID badge to
the outer garments at all times.
2. Language Requirement
The Service Provider shall have a person at each job site while work is being
performed who is able to speak English.
3. Unsatisfactory Operations
Should it be necessary to halt the work because of incorrect or unsatisfactory
operations under the terms of the awarded contract or because of failure to follow
safety standards applicable hereto, the Service Provider must take immediate steps
to remedy the deficiencies. Should repair or correction of any safety defect or
deficiency not be immediately undertaken and should the City of Fort Collins be
required to protect the site or make the repair or correction, the cost of such work
shall be deducted from payment due the Service Provider.
4. Fees, Licenses, Permits
The successful Vendor shall be responsible for obtaining any necessary licenses,
fees or permits without additional expense to the City. All equipment shall be
properly licensed and insured, carry the appropriate permits and be placarded as
required by law.
Projects within the State Highways require a permit from the Colorado Department of
Transportation. The Service Provider shall make application to the City of Fort
Collins by filling out the appropriate forms.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 12 of 126
Before and after normal working hours 8 am to 5 pm the City of Fort Collins requires
a noise ordinance variance permit. The request form can be obtained at
https://www.fcgov.com/specialevents/pdf/noise-variance-form.pdf.
If Service Provider vehicles or equipment are parked in designated parking areas
parking permits will need to be obtained from parking enforcement at 970-221-6617.
5. Project Contact
Service Provider(s) will be expected to provide a primary and a back-up contact
person for all Work Orders. Both the primary and back-up contact will be involved in
the following: agreement on the work to be performed, work schedules, prepare
quotes, construction details, making contact with customers, settling disputes, site
inspections, work acceptance, change orders, and other issues.
6. Measurement and payment
Payment will be made based on unit price of material actually installed in the sanitary
and storm water systems. Measurement for cured-in-place pipe payment will be that
footage measured from center of manhole to center of manhole or actual length of
line.
7. Invoicing and Payment
Invoices should be emailed monthly to invoices@fcgov.com with a copy to the
Project Manager. The cost of the work completed shall be paid to the Vendor each
month following the submittal of a correct invoice by the Vendor indicating the project
name, Purchase Order number, task description, hours worked, personnel/work type
category, hourly rate for each employee/work type category, date of the work
performed specific to the task, percentage of that work that has been completed by
task, 3rd party supporting documentation with the same detail and a brief progress
report.
Payments will be made using the prices listed on the agreed-to Unit Price Schedule.
In the event a service is requested which is not listed on the Unit Price Schedule, the
Vendor and the City will negotiate an appropriate unit price for the service prior to
Consultant initiating such work.
The City pays invoices on Net 30 terms.
8. Warranty
The Service Provider and the manufacturer shall warranty all materials and
workmanship for a period of two (2) calendar years. The warranty shall cover, but
not limited to the following: Defects discovered in material used in the project.
Failure of liner to remain formed to the previously existing sewer line. Lateral
connections that were active but not reconnected to the line at the time of
construction. Any damages resulting from same.
9. Certificate of Insurance and Bonds
Service Provider must provide certificate of insurance as indicated in the attached
Exhibit. Performance and Payment Bonds for one-hundred percent (100%) of the
project will be required from each project with a total cost exceeding one-hundred
thousand dollars ($100,000).
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 13 of 126
10. Retainage
Prior to Substantial Completion, Owner will be entitled to withhold as contract
retainage five percent (5%) of each progress payment, but, in each case, less the
aggregate of payments previously made and less such amounts as Project Manager
may withhold, in accordance with paragraph 14.7 of the General Conditions.
11. Use of Subcontractors
Vendors will be responsible for identifying any subcontractors in their proposal.
Please note that the City will contract solely with the awarded Vendor; therefore,
subcontractors will be the responsibility of the Vendor.
12. Construction Services
Construction services are to include, but are not limited to the following, as
necessary: full time site supervision; stormwater management; site protection and
security; traffic control; warranty and management of project safety and quality
control.
13. Contract Documents
Samples of the documents that may comprise the Agreement concerning the Work
include the Service Agreement, EJCDC General Conditions, Supplementary
Conditions, the City of Fort Collins Development Construction Standards for Water,
Wastewater and Stormwater located at
https://www.fcgov.com/utilities/img/site_specific/uploads/water_wastewater_construc
tion_standards.pdf, the documents included in the Work Orders, and such other
items as are referenced in this RFP.
14. Accident Reporting
Any accident resulting in damage to property or causing personal injury within the
limits of a work site shall be immediately reported to the appropriate police agency,
other required agencies, Project Manager and the City of Fort Collins Risk
Management Department.
The Service Provider shall immediately contact the Utility Operator/Owner and the
City of Fort Collins when damage to an underground facility is identified. If a natural
or propane gas line is damaged, the Service Provider must call 911 prior to notifying
the Utility Operator. The Service Provider shall not backfill around the underground
utility line until the Utility Operator has repaired the damage and has given clearance
to backfill. The City of Fort Collins will not pay the Service Provider for labor,
vehicles, material, or equipment or any other cost associated with the repair to any
at-fault damage. Failure to comply may result in a verbal warning, suspension of the
crew, loss of work, and/or termination of the Agreement.
15. Safety Practices, Safety Documentation and Training
Service Provider(s) shall comply with all engineering, safety, and operating
requirements concerning installation of equipment in, on or around utility facilities;
obtaining access facilities; and adhering to operating rules and requirements
involving safe contact with utility equipment and water, gas and power lines, and
confined spaces. Service Provider(s) shall adopt Utility's minimum safety standards
as the baseline requirements.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 14 of 126
16. Current standards
The Service Provider(s) shall also follow all applicable City of Fort Collins and State
of Colorado Department of Transportation Standard Specifications and Construction
Details, as applicable. The Service Provider(s) shall be aware of all standards and
their application. Ignorance or lack of knowledge shall not be an excuse for improper
work to occur. Any work constructed in violation of any applicable code shall be
corrected and re-installed properly at the Service Provider’s expense.
All work and/or materials must meet current standards in force by recognized
technical and professional societies, trade and materials supply associations,
institutes and organizations, bureaus and testing laboratories, and national, federal,
state, county, and local laws, codes and ordinances. All work shall be performed in
accordance with ANSI Z133.1 A300 and applicable OSHA and AWWA Standards.
Service Provider(s) are retained by the City of Fort Collins based on Service
Provider’s expertise and experience in the type of work that is the subject of this
Contract. Service Provider(s) represent and warrant that Service Provider is familiar
with the aforementioned Codes. Construction methods and techniques used by the
Service Provider(s) shall be in accordance with the recommended practices and
procedures published by leading industry manufacturers and trade associations.
17. Proposal Format
Please limit the total length of your proposal to a maximum of twenty-five (25) double
sided or fifty (50) single sided 8 ½ x 11” pages (excluding cover pages, table of
contents, dividers and Vendor Statement form). Font shall be a minimum of 10 Arial
and margins are limited to no less than .5” for sides and top/bottom. Extended page
sizes, such as 11” x 17”, count as a single page. Please, no embedded documents.
Proposals that do not conform to these requirements may be rejected.
18. Schedule:
All work to be completed within 90 days of notice to proceed.
Issuance of RFP February 11, 2019
Preproposal Meeting February 20, 2019
RFP Questions Due February 26, 2019
RFP Proposals Due March 11, 2019
Notice of Short List March 27, 2019
Interviews(tentative) April 10 &11
Start Work First week of June
19. Work Orders
The awarded Vendor(s) will be expected to sign the City’s standard work order type
services agreement, a sample of which is attached as Section VI for reference
purposes. In the event that the City has agreements with multiple Vendors for the
Work, the City reserves the right to choose which Vendor to contact regarding the
project, unless order of preference has been established during the contracting
process.
Individual work assignments will be requested and agreed to utilizing the City’s
standard Work Order (included in the agreement). Each Work Order form must
include a start and completion date, total cost and a general summary of work.
Subsequent supporting documentation pages may include a project schedule,
deliverables, hours, cost detail supporting total cost, and personnel details. Fees
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 15 of 126
outlined in the work order will conform with those submitted in the RFP response and
subsequently included in the contract.
No work order over $5,000 will be considered valid until signed, at a minimum,
by the Vendor, project manager and Purchasing Department representative.
Depending on the cost and nature of the work, additional signature authorization may
be required. Any changes to the dates, cost or scope of any Work Order must be
agreed upon in writing utilizing the City’s Change Order (included in the agreement)
and will not be considered valid until signed, at a minimum, by the Vendor, project
manager and Purchasing Department representative.
20. Pricing Specifications
Pricing shall remain valid during the initial term of the Agreement for the same
services and materials required for the expansion or modification of the particular
project scope or design. Proposed pricing for each unit shall reflect the entirety of
cost due to the Service Provider for the scope of work defined by this document,
inclusive of materials, shipping, labor, benefits, profit, overhead, permitting, and any
other direct and/or indirect costs. Pricing shall include all mobilization, site
preparation, work area protection, site restoration, and traffic control necessary to
perform the task safely and according to all applicable specifications referenced in
this document.
Unless otherwise specified, the basis of pricing and payment for lineal foot-based
units shall be network route distance, not material length (conduit, innerduct, etc.).
The City of Fort Collins shall not be invoiced for costs associated with scrap or waste
materials. Service Providers are to review the project specifications carefully to
determine if any miscellaneous materials not specified will be necessary to perform
the defined project scope, and to include all necessary materials in the proposal.
On most projects, the City of Fort Collins provides materials to the Service Provider
for installation. If Service Provider is to store and issue material from their facility, the
material shall be new and unused when it is installed at the project site and shall be
per the City specification. All pricing shall be “open book” and at the City’s request
the Service Provider shall provide cost or pricing data including but not limited to
subcontractor quotes, material quotes, invoices, labor, equipment usage, etc.
21. Interviews
In addition to submitting a written proposal, the top-rated Vendors may be
interviewed by the RFP assessment team and asked to participate in an oral
presentation to provide an overview of the company, approach to the project and to
address questions. The evaluation criteria for the oral interviews will be the same as
the criteria for the written evaluations and is included in Section IV.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 16 of 126
III. PROPOSAL SUBMITTAL
For this section, Service Providers are required to provide detailed written responses to the
following items in the order outlined below. The responses shall be considered technical
offers of what Service Providers propose to provide and shall be incorporated in the contract
award as deemed appropriate by the City. A proposal that does not include all the
information required may be deemed non-responsive and subject to rejection.
Responses must include all the items in the order listed below. It is suggested that the
Service Providers include each of the City’s questions with their response immediately
following the question.
The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and
presentation of their proposal.
Cover Letter / Executive Summary
The Executive Summary should highlight the content of the proposal and features of
the program offered, including a general description of the program and any unique
aspects or benefits provided by your firm.
Indicate your availability to participate in the interviews/demonstrations on the
proposed dates as stated in the Schedule section.
B. Service Provider Information
1. Describe the Service Provider’s business and background, including an overview
of services offered and qualifications
2. Number of years in the business
3. Details about ownership
4. Size of the firm
5. Location(s) of offices. If multiple, please identify which will be the primary for our
account.
6. Primary contact information for the company including contact name(s) and
title(s), mailing address(s), phone number(s), and email address(s). Complete
Vendor Statement.
7. Provide the name, address and phone number of the firm’s bonding agent.
Provide a letter from the bonding agent indicating the firm’s bonding capacity.
Capacity up to $1,000,000 may be required.
C. Scope of Proposal
1. Provide a detailed & technical narrative of the processes proposed if awarded the
contract per the scope above. The narrative should include any options that may
be beneficial for the City to consider. Materials to be used are to be mentioned.
2. Describe how the City’s projects will be managed.
3. Describe the methods and timeline of communication your firm will use with the
City’s Project Manager and other parties.
4. Include a description of the software and other analysis tools to be used.
5. Describe your pothole process, inception through restoration.
6. Provide a list of equipment and available labor that may be utilized during the
course of work. Hourly rates for equipment and labor shall be included.
7. List all projects and contract amounts completed by the firm in the past three (3)
years.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 17 of 126
8. Provide a brief summary of at least three (3) projects similar to this RFP’s scope
of work completed by the firm in the last three (3) years. Highlight any
participation by key staff proposed for this project. Provide data on:
a. Project title, owner’s name
b. Description of work
c. Bid/work order cost
d. Cost at completion and number of change orders
e. Service Provider, subcontractor or owner initiated claims and their resolution
f. Contracted amount of time for completion and actual completion time.
g. Subcontractors on the team
h. Brief discussion of any unusual factor is encouraged (e.g. Owner initiated
delays, additions to the work, etc.).
i. Provide an owner reference (contact name, phone number and email) for
cited projects.
9. Describe any damages caused by Service Provider to others’ property during the
last three (3) years. Indicate how the damages were handled, who handled them
and who paid for them.
10. Describe your change order process.
11. Provide specifications for the proposed material your firm would provide for us.
12. Provide a description of how and where your firm proposes to dispose of waste.
13. Indicate what warranty will be provided to the City of Fort Collins.
14. Describe project problems encountered in other similar implementation projects
and how your firm managed these issues.
D. Firm Capability
Provide relevant information regarding previous experience related to this or similar
Projects, to include the following:
1. Provide an Organization Chart/Proposed Project Team: An organization chart
containing the names of key personnel and subcontractor with titles and their
specific task assignment for this Agreement shall be provided in this section.
2. Job descriptions of key positions (i.e., onsite supervisor, all personnel of
installation crew, others as appropriate).
3. A list of qualifications for your firm and qualifications and experience of the
specific staff members proposed to perform the consulting services described
above.
4. Provide an owner reference for six (6) similar projects with agencies in the last
five (5) years that have involved the staff proposed to work on this project.
NOTE: If your firm has worked for the City previously, one City reference is
acceptable, while the other references and experience are from outside the City.
Include the following:
a. Project title, owner’s name
b. Description of work
c. Bid/work order cost
d. Cost at completion and number of change orders
e. Service Provider, subcontractor or owner initiated claims and their resolution
f. Contracted amount of time for completion and actual completion time.
g. Subcontractors on the team
h. Brief discussion of any unusual factor is encouraged (e.g. Owner initiated
delays, additions to the work, etc.).
i. Provide an owner reference (contact name, phone number and email) for
cited projects.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 18 of 126
5. Describe an experience by the firm or key staff which demonstrates your ability to
work with owners in a team environment.
6. Identify what portion of work, if any, may be subcontracted.
7. Describe which portions of the work (if any) will be performed by subcontractors.
8. Provide examples of at least two projects where you’ve worked with your
subcontractors. List the subcontractor firm(s) for this Agreement, their area(s) of
expertise, and include all other applicable information herein requested for each
subcontractor.
9. Describe the process for conflict resolution, both internally and externally.
10. Some functions of this project may require the use of subcontractors. If you
intend to utilize subcontractors, list each firm and provide a paragraph or two
identifying their key personnel.
11. Indicate the resources available for construction approach and methods,
construction sequencing and scheduling, and equipment scheduling.
E. Assigned Personnel
1. List of project personnel: This list should include the identification of the contact
person with primary responsibility for this Agreement, the personnel proposed
for this Agreement, and any supervisory personnel, including partners and/or
subcontractors, and their individual areas of responsibility. Resumes or work
history of individuals proposed to fill these key positions are to be included.
Please limit resumes to one-half page each.
2. Describe the roles and job duties of project personnel, including where that
person does the majority of his work (office/field).
3. Define who will negotiate (a) the master agreement; and (b) individual
workorders.
5. Indicate if key staff will be assigned to manage the work for the duration of the
contract.
6. Indicate if the City would be allowed to review resumes of any key replacement
staff.
F. Safety & Availability
1. Service Providers are asked to provide their “OSHA Lost Time Rate” and
“OSHA Recordable Incident Rate”, accompanied by the Service Providers
OSHA 300 log for the last full year. Service Providers must also provide a letter
from NCCI showing the current year Experience Modification Rate.
2. Describe the availability of project personnel to participate in this project in the
context of the Service Provider firm’s other commitments.
3. Provide an overview of your safety program.
4. What training is provided to employees regarding safety? Regarding being
around equipment? How often is it provided?
5. Explain how the Service Provider tracks potential project risks.
6. Explain how the Service Provider identifies, communicates and determines, with
the City, an acceptable level of risk.
7. Describe risk-sharing strategies employed by the Service Provider.
8. Describe the detailed Risk Management plan, tracking and mitigation process to
be included as part of this implementation.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 19 of 126
G. Sustainability/TBL Methodology
In concise terms (no more than two pages), please describe how your organization
strives to be sustainable. Address how your firm incorporates Triple Bottom Line
(TBL) into the workplace. See the section titled Review and Assessment for
additional information.
Please highlight any areas of opportunity in the project where sustainability could be
applied and/or improved.
H. Costs
1. Complete the Unit Price Schedule, issued separately as part of the Unit Price
Sheet.
2. Provide costs for additional services you offer that are not included on the Unit
Price Schedule.
3. Provide, in detail, the fee schedules for the following, if any, for:
a. Obtaining private locates
b. Quality control
c. Traffic control
4. Provide a list of equipment and available labor that may be utilized during the
course of work. Hourly rates for equipment and labor shall be included.
I. Additional Information
1. Provide any information that distinguishes Service Provider from its competition
and any additional information applicable to this RFP that might be valuable in
assessing Service Provider’s proposal.
2. Explain any concerns Service Provider may have in maintaining objectivity in
recommending the best solution. All potential conflicts of interest must be
disclosed.
3. Exceptions to the attached Sample Agreement shall be documented in this
section.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 20 of 126
IV. REVIEW AND ASSESSMENT CRITERIA
Proposal and Interview Criteria
Vendors will be evaluated on the following criteria. These criteria will be the basis for
review and assessment of the written proposals and optional interview session. At the
discretion of the City, interviews of the top-rated Vendors may be conducted.
The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating,
and 5 being an outstanding rating.
WEIGHTING
FACTOR QUALIFICATION STANDARD
2.0 Scope of Proposal
Does the proposal address all elements of the
RFP? Does the proposal show an
understanding of the project objectives,
methodology to be used and results/outcomes
required by the project? Are there any
exceptions to the specifications, Scope of Work,
or agreement?
2.0 Firm Capability
Does the firm have the resources, financial
strength, capacity and support capabilities
required to successfully complete the project on-
time and in-budget? Has the firm successfully
completed previous projects of this type and
scope?
2.0 Assigned Personnel
Do the persons who will be working on the
project have the necessary skills and
qualifications? Are sufficient people of the
requisite skills and qualifications assigned to the
project?
1.0 Safety & Availability
Can the work be completed in the necessary
time? Can the target start and completion dates
be met? Are other qualified personnel available
to assist in meeting the project schedule if
required? Is the project team available to attend
meetings as required by the Scope of Work?
How does your “OSHA Lost Time Rate” and
“OSHA Recordable Incident Rate” compare?
How does your firm manage safety training and
risk management?
1.0 Sustainability/TBL
Methodology
Does the firm demonstrate a commitment to
Sustainability and incorporate Triple Bottom Line
methodology in both their Scope of Work for the
project, and their day-to-day business operating
processes and procedures?
2.0 Cost & Work Hours
Does the proposal included detailed cost break-
down for each cost element as applicable and
are the line-item costs competitive? Do the
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 21 of 126
proposed cost and work hours compare
favorably with the Project Manager's estimate?
Are the work hours presented reasonable for the
effort required by each project task or phase?
Definitions
Sustainable Purchasing is a process for selecting products or services that have a lesser
or reduced negative effect on human health and the environment when compared with
competing products or services that serve the same purpose. This process is also known
as “Environmentally Preferable Purchasing” (EPP), or “Green Purchasing”.
The Triple Bottom Line (TBL) is an accounting framework that incorporates three
dimensions of performance: economic, or financial; environmental, and social. The
generally accepted definition for TBL is that it “captures the essence of sustainability by
measuring the impact of an organization’s activities on the world…including both its
profitability and shareholders values and its social, human, and environmental capital.”
Reference Evaluation Criteria
Prior to award, the Project Manager will check references using the following criteria.
Negative responses from references may impact the award determination.
CRITERIA STANDARD QUESTIONS
Overall Performance Would you hire this Vendor again? Did they show
the skills required by this project?
Timetable
Was the original Scope of Work completed within the
specified time? Were interim deadlines met in a
timely manner?
Completeness
Was the Vendor responsive to client needs; did the
Vendor anticipate problems? Were problems solved
quickly and effectively?
Budget Was the original Scope of Work completed within the
project budget?
Job Knowledge
If a study, did it meet the Scope of Work?
If Vendor administered a construction contract, was
the project functional upon completion and did it
operate properly? Were problems corrected quickly
and effectively?
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 22 of 126
EXHIBIT A
SAMPLE SERVICES AGREEMENT
WORK ORDER TYPE
THIS AGREEMENT made and entered into the day and year set forth below, by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and hereinafter referred to as "Service Provider".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed by
and between the parties hereto as follows:
1. Services to be Performed.
a. This Agreement shall constitute the basic agreement between the parties for services
for . The conditions set forth herein shall apply to all services performed by the
Service Provider on behalf of the City and particularly described in Work Orders
agreed upon in writing by the parties from time to time. Such Work Orders, a sample
of which is attached hereto as Exhibit A, consisting of two (2) pages and incorporated
herein by this reference, shall include a description of the services to be performed,
the location and time for performance, the amount of payment, any materials to be
supplied by the City and any other special circumstances relating to the performance
of services. No Work Order shall exceed $ . A general scope of services is
attached hereto as Exhibit C, consisting of ( ) page(s), and incorporated
herein by this reference.
The only services authorized under this Agreement are those which are performed
after receipt of such Work Order, except in emergency circumstances where oral work
requests may be issued. Oral requests for emergency actions will be confirmed by
issuance of a written Work Order within two (2) working days. Irrespective of
references in Exhibit A to certain named third parties, Service Provider shall be solely
responsible for performance of all duties hereunder.
b. The City may, at any time during the term of a particular Work Order and without
invalidating such Work Order, make changes to the scope of the particular services.
Such changes shall be agreed upon in writing by the parties by Change Order, a
sample of which is attached hereto as Exhibit B, consisting of one (1) page and
incorporated herein by this reference.
2. Changes in the Work. The City reserves the right to independently bid any services rather
than issuing work to the Service Provider pursuant to this Agreement. Nothing within this
Agreement shall obligate the City to have any particular service performed by the Service
Provider.
3. Time of Commencement and Completion of Services. The services to be performed
pursuant to this Agreement shall be initiated as specified by each written Work Order or oral
emergency service request. Oral emergency service requests will be acted upon without
waiting for a written Work Order. Time is of the essence.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 23 of 126
4. Contract Period. This Agreement shall commence , 20 and shall continue in
full force and effect until , 20 , unless sooner terminated as herein provided. In
addition, at the option of the City, the Agreement may be extended for additional one year
periods not to exceed ( ) additional one year periods. Renewals and pricing
changes shall be negotiated by and agreed to by both parties. Written notice of renewal
shall be provided to the Service Provider and mailed no later than thirty (30) days prior to
contract end.
5. Delay. If either party is prevented in whole or in part from performing its obligations by
unforeseeable causes beyond its reasonable control and without is fault or negligence, then
the party so prevented shall be excused from whatever performance is prevented by such
cause. To the extent that the performance is actually prevented, the Service Provider must
provide written notice to the City of such condition within fifteen (15) days from the onset of
such condition.
6. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the
City may terminate this Agreement at any time without cause by providing written notice of
termination to the Service Provider. Such notice shall be mailed at least fifteen (15) days
prior to the termination date contained in said notice unless otherwise agreed in writing by
the parties. All notices provided under this Agreement shall be effective when mailed,
postage prepaid and sent to the following address:
Service Provider: City: Copy to:
Attn:
City of Fort Collins
Attn:
PO Box 580
Fort Collins, CO 80522
City of Fort Collins
Attn: Purchasing Dept.
PO Box 580
Fort Collins, CO 80522
In the event of early termination by the City, the Service Provider shall be paid for services
rendered to the termination date, subject only to the satisfactory performance of the Service
Provider's obligations under this Agreement. Such payment shall be the Service Provider's
sole right and remedy for such termination.
7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The
actual amount of work to be performed will be stated on the individual Work Orders. The
City makes no guarantee as to the number of Work Orders that may be issued or the actual
amount of services which will in fact be requested.
8. Payments.
a. The City agrees to pay and the Service Provider agrees to accept as full payment for all
work done and all materials furnished and for all costs and expenses incurred in
performance of the work the sums set forth for the hourly labor rate and material costs,
with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit
, consisting of ( ) page(s), and incorporated herein by this reference.
Payment shall be made by the City Net 30 days from the date of the invoice and upon
acceptance of the work by the City and upon the Service Provider furnishing satisfactory
evidence of payment of all wages, taxes, supplies and materials, and other costs
incurred in connection with the performance of such work.
9. Liquidated Damages. OWNER and CONTRCTOR recognize that time is of the essence of
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 24 of 126
this Agreement and that OWNER will suffer financial loss if the Work is not completed within
the times specified in the Work Order, plus any extensions thereof allowed in accordance
with Article 12 of the General conditions. They also recognize the delays, expenses and
difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if
the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER
and SERVICE PROVIDER agree that as liquidated damages for delay (but not as penalty)
SERVICE PROVIDER shall pay OWNER the amount set forth in each Work Order.
10. City Representative. The City's representative will be shown on the specific Work Order
and shall make, within the scope of his or her authority, all necessary and proper decisions
with reference to the work requested. All requests concerning this Agreement shall be
directed to the City Representative.
11. Independent Service Provider. It is agreed that in the performance of any services
hereunder, the Service Provider is an independent responsible to the City only as to the
results to be obtained in the particular work assignment and to the extent that the work shall
be done in accordance with the terms, plans and specifications furnished by the City.
12. Subcontractors. Service Provider may not subcontract any of the Work set forth in the
Exhibit A, Statement of Work without the prior written consent of the city, which shall not be
unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of
the City), then the following provisions shall apply: (a) the subcontractor must be a reputable,
qualified firm with an established record of successful performance in its respective trade
performing identical or substantially similar work, (b) the subcontractor will be required to
comply with all applicable terms of this Agreement, (c) the subcontract will not create any
contractual relationship between any such subcontractor and the City, nor will it obligate the
City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor
will be subject to inspection by the City to the same extent as the work of the Service
Provider.
13. Personal Services. It is understood that the City enters into the Agreement based on the
special abilities of the Service Provider and that this Agreement shall be considered as an
agreement for personal services. Accordingly, the Service Provider shall neither assign any
responsibilities nor delegate any duties arising under the Agreement without the prior written
consent of the city.
14. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the
services shall not be construed to operate as a waiver of any rights under the Agreement or
of any cause of action arising out of the performance of this Agreement.
15. Warranty.
a. Service Provider warrants that all work performed hereunder shall be performed with the
highest degree of competence and care in accordance with accepted standards for work
of a similar nature.
b. Unless otherwise provided in the Agreement, all materials and equipment incorporated
into any work shall be new and, where not specified, of the most suitable grade of their
respective kinds for their intended use, and all workmanship shall be acceptable to City.
c. Service Provider warrants all equipment, materials, labor and other work, provided under
this Agreement, except City-furnished materials, equipment and labor, against defects
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 25 of 126
and nonconformances in design, materials and workmanship/workwomanship for a
period beginning with the start of the work and ending twelve (12) months from and after
final acceptance under the Agreement, regardless whether the same were furnished or
performed by Service Provider or by any of its subcontractors of any tier. Upon receipt
of written notice from City of any such defect or nonconformances, the affected item or
part thereof shall be redesigned, repaired or replaced by Service Provider in a manner
and at a time acceptable to City.
16. Default. Each and every term and condition hereof shall be deemed to be a material element
of this Agreement. In the event either party should fail or refuse to perform according to the
terms of this Agreement, such party may be declared in default thereof.
17. Remedies. In the event a party has been declared in default, such defaulting party shall be
allowed a period of ten (10) days within which to cure said default. In the event the default
remains uncorrected, the party declaring default may elect to (a) terminate the Agreement
and seek damages; (b) treat the Agreement as continuing and require specific performance;
or (c) avail himself of any other remedy at law or equity. If the non-defaulting party
commences legal or equitable actions against the defaulting party, the defaulting party shall
be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees
and costs incurred because of the default.
18. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire
agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors,
heirs, personal representative, successors and assigns of said parties.
19. Indemnity/Insurance.
a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents
and employees against and from any and all actions, suits, claims, demands or liability
of any character whatsoever, brought or asserted for injuries to or death of any person
or persons, or damages to property arising out of, result from or occurring in connection
with the performance of any service hereunder.
b. The Service Provider shall take all necessary precautions in performing the work
hereunder to prevent injury to persons and property.
c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider
shall provide and maintain insurance coverage naming the City as an additional insured
under this Agreement of the type and with the limits specified within Exhibit ,
consisting of one (1) page, attached hereto and incorporated herein by this reference.
The Service Provider before commencing services hereunder shall deliver to the City's
Purchasing Director, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a
certificate evidencing the insurance coverage required from an insurance company
acceptable to the city.
20. Entire Agreement. This Agreement, along with all Exhibits and other documents
incorporated herein, shall constitute the entire Agreement of the parties. Covenants or
representations not contained in this Agreement shall not be binding on the parties.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 26 of 126
21. Law/Severability. This Agreement shall be governed in all respect by the laws of the State
of Colorado. In the event any provision of this Agreement shall be held invalid or
unenforceable by any court of competent jurisdiction such holding shall not invalidate or
render unenforceable any other provision of this Agreement.
22. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et.
seq., Service Provider represents and agrees that:
a. As of the date of this Agreement:
1. Service Provider does not knowingly employ or contract with an illegal alien who will
perform work under this Agreement; and
2. Service Provider will participate in either the e-Verify program created in Public Law
208, 104th Congress, as amended, and expanded in Public Law 156, 108th
Congress, as amended, administered by the United States Department of Homeland
Security (the “e-Verify Program”) or the Department Program (the “Department
Program”), an employment verification program established pursuant to Section 8-
17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired
employees to perform work under this Agreement.
b. Service Provider shall not knowingly employ or contract with an illegal alien to perform
work under this Agreement or knowingly enter into a contract with a subcontractor that
knowingly employs or contracts with an illegal alien to perform work under this
Agreement.
c. Service Provider is prohibited from using the e-Verify Program or Department Program
procedures to undertake pre-employment screening of job applicants while this
Agreement is being performed.
d. If Service Provider obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien, Service
Provider shall:
1. Notify such subcontractor and the City within three days that Service Provider has
actual knowledge that the subcontractor is employing or contracting with an illegal
alien; and
2. Terminate the subcontract with the subcontractor if within three days of receiving the
notice required pursuant to this section the subcontractor does not cease employing
or contracting with the illegal alien; except that Service Provider shall not terminate
the contract with the subcontractor if during such three days the subcontractor
provides information to establish that the subcontractor has not knowingly employed
or contracted with an illegal alien.
e. Service Provider shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the “Department”) made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the
authority established in Subsection 8-17.5-102 (5), C.R.S.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 27 of 126
f. If Service Provider violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If
this Agreement is so terminated, Service Provider shall be liable for actual and
consequential damages to the City arising out of Service Provider’s violation of
Subsection 8-17.5-102, C.R.S.
g. The City will notify the Office of the Secretary of State if Service Provider violates this
provision of this Agreement and the City terminates the Agreement for such breach.
23. Dust Control. The Service Provider shall abide by the City of Fort Collins “Dust Control and
Prevention Manual,” which is available for public download at
https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is
incorporated herein by this reference. The City of Fort Collins has implemented this manual
for all projects performed for the City of Fort Collins or located within the City of Fort Collins
City limits.
24. Haul Routes. All trucks used for work contracted by the City utilizing asphalt from the asphalt
plant located at 1800 North Taft Hill Road may only enter North Taft Hill Road from the North
using CR 54 G and only exit the site on North Taft Hill Road to the North to CR 54G.
25. Special Provisions. Special provisions or conditions relating to the services to be performed
pursuant to this Agreement are set forth in Exhibit - Confidentiality consisting of three
(3) pages, attached hereto and incorporated herein by this reference.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 28 of 126
THE CITY OF FORT COLLINS, COLORADO
By:
Gerry Paul
Purchasing Director
DATE:
ATTEST:
APPROVED AS TO FORM:
SERVICE PROVIDER'S NAME
By:
Printed:
Title:
CORPORATE PRESIDENT OR VICE PRESIDENT
Date:
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 29 of 126
EXHIBIT
WORK ORDER FORM (Short form)
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
SERVICE PROVIDER'S NAME
WORK ORDER NUMBER: PM's Tracking #
PROJECT TITLE:
ORIGINAL BID/RFP NUMBER & NAME:
MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date
ARCHITECT/ENGINEER: If using a 3rd party architect/engineer or City
PM/Engineer
OWNER’S REPRESENTATIVE: City PM
WORK ORDER COMMENCEMENT DATE:
WORK ORDER COMPLETION DATE:
MAXIMUM FEE: (time and reimbursable direct costs):
PROJECT DESCRIPTION/SCOPE OF SERVICES:
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of ( ) pages are hereby accepted and incorporated
herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this
document.
SERVICE PROVIDER: Service Provider's Name
By: Date:
Name: Title:
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 30 of 126
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Name, Project Manager
REVIEWED: Date:
Name, Buyer or Senior Buyer
APPROVED AS TO FORM: Date:
Name,City Attorney's Title
(if greater than $1,000,000)
ACCEPTANCE: Date:
Name, Title
ACCEPTANCE: Date:
Name, Title
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 31 of 126
EXHIBIT
WORK ORDER FORM (Construction over $100,000)
FORT COLLINS UTILITIES
CONSTRUCTION WORK ORDER
PROJECT TITLE
WORK ORDER NO. PM'S TRACKING #
SERVICE PROVIDER: Company Name
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 32 of 126
TABLE OF CONTENTS
AGREEMENT FORMS
00525 Work Order, Notice of Award & Bid Schedule
00530 Work Order Notice to Proceed
00600 Bonds and Certificates
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (SERVICE PROVIDER)
00651 Lien Waiver Release (SUBCONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
00800 Supplementary Conditions
00900 Addenda, Modifications and Payment
00950 Work Order Change Order Form
00960 Application for Payment
ADDITIONAL DOCUMENTS
Attachment A DRAWING INDEX
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 33 of 126
SECTION 00500
CONSTRUCTION WORK ORDER AGREEMENT FORMS
00525 Work Order, Notice of Award & Bid Schedule
00530 Work Order Notice to Proceed
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 34 of 126
SECTION 00525
WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE
TO: Company Name
WORK ORDER NUMBER: PM's Tracking #
PROJECT TITLE:
ORIGINAL BID/RFP NUMBER & NAME:
MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date
ARCHITECT/ENGINEER: If using a 3rd party architect/engineer or can
be City PM/Engineer
OWNER’S REPRESENTATIVE: City PM
WORK ORDER COMMENCEMENT DATE:
MAXIMUM FEE: (time and reimbursable direct costs):
NOTICE OF AWARD DATE: Date of this Document
OWNER: City of Fort Collins (hereinafter referred to as OWNER)
1. WORK. Pursuant to your MASTER AGREEMENT with OWNER dated Original
Contract Date, and your Work Order Proposal dated Date of Quote, you have been
awarded a Work Order for Project Title.
PROJECT DESCRIPTION & SITE LOCATION:
2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is
Written Dollar Amount ($Numerical Dollar Amount). Pursuant to the AGREEMENT and
the Work Order Documents, Performance and Payment Bonds and insurance are
required.
3. CONTRACT TIMES. Pursuant to the MASTER AGREEMENT and the Work Order
Documents, the date for Substantial Completion of this Work Order is Date, and after
Substantial Completion, the date for Final Completion is Date.
4. LIQUIDATED DAMAGES. OWNER and SERVICE PROVIDER recognize that time is
of the essence of this Work Order and that OWNER will suffer financial loss if the Work
is not completed within the times specified in paragraph 3 above, plus any extensions
thereof allowed in accordance with Article 12 of the General Conditions. They also
recognize the delays, expenses and difficulties involved in proving in a legal proceeding
the actual loss suffered by OWNER if the Work is not completed on time. Accordingly
instead of requiring any such proof, OWNER and SERVICE PROVIDER agree that as
liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the
amounts set forth hereafter.
1) Substantial Completion: Written Dollar Amount ($Numerical Dollar Amount) for
each calendar day or fraction thereof after Date until the work is Substantially
Complete.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 35 of 126
2) Final Acceptance: After Substantial Completion, Written Dollar Amount
($Numerical Dollar Amount) for each calendar day or fraction thereof after XX
number of calendar days until the Work is ready for Final Payment and
Acceptance.
5. PAYMENT PROCEDURES. SERVICE PROVIDER shall submit Applications for
Payment in accordance with Article 14 of the General Conditions. Applications for
Payment will be processed by OWNER.
PROGRESS PAYMENTS. OWNER shall make progress payments on account of the
Contract Price on the basis of SERVICE PROVIDER's Application for Payment, once
each month during construction as provided below. All progress payments will be on
the basis of the progress of the Work measured by the schedule of values
established in paragraph 2.6 of the General Conditions and in the case of Unit Price
Work based on the number of units completed, and in accordance with the General
Requirements concerning Unit Price Work.
Prior to Substantial Completion, Owner will be entitled to withhold as contract
retainage five percent (5%) of each progress payment, but, in each case, less the
aggregate of payments previously made and less such amounts as OWNER may
withhold, in accordance with paragraph 14.7 of the General Conditions. If, in the sole
discretion of Owner, Owner determines that the character and progress of the Work
have been satisfactory to OWNER, OWNER may determine that as long as the
character and progress of the Work remain satisfactory to them, there will be no
additional retainage on account of Work completed in which case the remaining
progress payments prior to Substantial Completion will be in an amount equal to
100% of the Work completed. 95% of materials and equipment not incorporated in
the Work (but delivered, suitably stored and accompanied by documentation
satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions)
may be included in the application Section 00960.
Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to
increase total payments to SERVICE PROVIDER to 95% of the Contract Price, less such
amounts as OWNER may withhold in accordance with paragraph 14.7 of the General
Conditions or as provided by law.
Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of
the General Conditions, OWNER shall pay the remainder of the Contract Price as provided
in said paragraph 14.13.
6. EXECUTION. Work Order Documents must be executed in DocuSign within fifteen (15)
calendar days of the date of this Notice of Award. Service Provider shall attach Payment
and Performance Bonds and Certificate of Insurance(COI) to the Work Order
Documents in DocuSign. In addition, one original set of executed Bonds and COI shall
be provided to the Buyer.
Failure to comply with these conditions within the time specified will entitle OWNER to
consider your Work Order Proposal abandoned and to annul this Work Order & Notice of
Award.
SERVICE PROVIDER’S NOTICE OF AWARD REPRESENTATION & EXECUTION:
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 36 of 126
SERVICE PROVIDER agrees to perform the services identified above, in accordance with the
terms and conditions contained herein, the MASTER AGREEMENT, and the NOTICE OF
AWARD between the parties. In the event of a conflict between or ambiguity in the terms of the
MASTER AGREEMENT or specific Work Orders, the MASTER AGREEMENT shall control.
SERVICE PROVIDER: Company Name
By: Date:
Name: Title:
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 37 of 126
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Documents are hereby accepted and incorporated herein by
this reference.
ACCEPTANCE: Date:
Name, Project Manager
REVIEWED: Date:
Name, Buyer or Senior Buyer
APPROVED AS TO FORM: Date:
Name,City Attorney's Title
(if greater than $1,000,000)
ACCEPTANCE: Date:
Name, Title
ACCEPTANCE: Date:
Name, Title
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 38 of 126
BID SCHEDULE
Insert Work Order Quote/Proposal Here
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 39 of 126
SECTION 00530
WORK ORDER NOTICE TO PROCEED
NOTICE TO PROCEED DATE:
WORK ORDER TITLE:
WORK ORDER NUMBER:
TO:
Attn:
This notice is to advise you:
That the Work Order and all amendments and supplements to the Work Order Documents
covering the above described Work have been fully executed by the SERVICE PROVIDER and
the OWNER. That the required SERVICE PROVIDER's Performance and Payment Bonds and
insurance have been received by the OWNER. That the OWNER has approved the said Work
Order and Work Order Documents.
Therefore, as the SERVICE PROVIDER for the above described Work, you are hereby
authorized and directed to proceed within ( ) calendar days from receipt of this
notice as required by the Work Order and the AGREEMENT.
The dates for Substantial Completion and Final Acceptance shall be , and ,
respectively.
Dated this _____________ day of ___________, _____.
CITY OF FORT COLLINS (OWNER)
By:
Name, Title
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Work Order Notice to Proceed is hereby acknowledged this Day day of
Month, Year.
(SERVICE PROVIDER)
By: ___________________________________________
Name, Title
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 40 of 126
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (SERVICE PROVIDER)
00651 Lien Waiver Release (SUBCONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 41 of 126
SECTION 00610
PERFORMANCE BOND
Bond No __
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the
payment of which sum well and truly to be made, we bind ourselves, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Master Agreement with the OWNER, dated the Day day of Month, Year, a copy of which
is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work
Order, titled Work Order Project Title, Work Order Number PM's Tracking #, dated Work Order
Date, a copy of which is hereto attached and made a part hereof.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said Work Order and Master
Agreement during the original term thereof, and any extensions thereof which may be granted by
the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if
the Principal shall satisfy all claims and demands incurred under such Work Order and Master
Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages
which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all
outlay and expense which the OWNER may incur in making good any default, then this obligation
shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Work Order and Master
Agreement or to the Work to be performed thereunder or the Specifications accompanying the
same shall in any way affect its obligation on this bond; and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the Work Order and Master
Agreement or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the SERVICE
PROVIDER shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the
State of Colorado and be acceptable to the OWNER.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 42 of 126
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which
shall be deemed an original, this _____ day of ___________, _____.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: Surety
_____________________________ By:
_____________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Work Order. If SERVICE PROVIDER is
Partnership, all partners should execute Bond.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 43 of 126
SECTION 00615
PAYMENT BOND
Bond No __
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the
payment of which sum well and truly to be made, we bind ourselves, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Master Agreement with the OWNER, dated the Day day of Month, Year, a copy of which
is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work
Order, titled Work Order Project Title, Work Order Number PM's Tracking #, dated Work Order
Date, a copy of which is hereto attached and made a part hereof.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors,
and corporations furnishing materials for or performing labor in the prosecution of the Work
provided for in such Work Order and Master Agreement and any authorized extension or
modification thereof, including all amounts due for materials, lubricants, repairs on machinery,
equipment and tools, consumed, rented or used in connection with the construction of such Work,
and all insurance premiums on said Work, and for all labor, performed in such Work whether by
subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and
effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Work Order and Master
Agreement or to the Work to be performed thereunder or the Specifications accompanying the
same shall in any way affect its obligation on this bond; and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the Work Order and Master
Agreement or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the SERVICE
PROVIDER shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the
State of Colorado and be acceptable to the OWNER.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 44 of 126
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which
shall be deemed an original, this _____ day of ___________, _____.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: Surety
_____________________________ By:
_____________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Work Order. If SERVICE PROVIDER is
Partnership, all partners should execute Bond.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 45 of 126
SECTION 00630
CERTIFICATE OF INSURANCE
SERVICE PROVIDER shall submit Certificate of Insurance in compliance with the Work Order
Documents.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 46 of 126
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS (OWNER) PROJECT TITLE:
DATE OF SUBSTANTIAL COMPLETION: LOCATION: Fort Collins, Colorado
OWNER: City of Fort Collins
PROJECT OR SPECIFIED PART SHALL SERVICE PROVIDER:
INCLUDE:
WORK ORDER DATE:
The Work performed under this Work Order, pursuant to the Work Order Documents, has been
inspected by authorized representatives of the OWNER, SERVICE PROVIDER, and the
ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared
to be substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto. This list may not be
exhaustive, and the failure to include an item on it does not alter the responsibility of the SERVICE
PROVIDER to complete all the Work in accordance with the Work Order Documents.
_____________________________ By: __________________________ ________
PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE
The SERVICE PROVIDER accepts the above Certificate of Substantial Completion and agrees
to complete and correct the items on the tentative list within the time indicated.
_____________________________ By: __________________________ ________
SERVICE PROVIDER AUTHORIZED REPRESENTATIVE
DATE
The OWNER accepts the project or specified area of the project as substantially complete and
will assume full possession of the project or specified area of the project at 12:01 a.m., on
. The responsibility for heat, utilities, security, and insurance
under the Work Order Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS ________ By: __________________________ ________
OWNER AUTHORIZED REPRESENTATIVE DATE
REMARKS: _________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 47 of 126
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
DATE:
TO:
You are hereby notified that on the Day day of Month, Year, the City of Fort Collins, Colorado,
has accepted the Work completed by Service Provider Company Name, for the City of Fort Collins
Work Order, titled Project Title, Work Order Number PM's Tracking #.
Your continuing obligations and guarantees for the Project will be as provided in the Work Order
and Work Order Documents.
Sincerely,
City of Fort Collins
OWNER
By: ___________________________________________
___________________________________________
Name, Title
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 48 of 126
SECTION 00650
LIEN WAIVER RELEASE
(SERVICE PROVIDER)
TO: City of Fort Collins, Colorado (OWNER)
FROM: Company Name (SERVICE PROVIDER)
WORK ORDER TITLE:
WORK ORDER NUMBER:
1. The SERVICE PROVIDER acknowledges having received payment, except retainage from
the OWNER for all work, labor, skill and material furnished, delivered and performed by the
SERVICE PROVIDER for the OWNER or for anyone in the construction, design,
improvement, alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the SERVICE PROVIDER voluntarily
waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act
claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond
rights which the SERVICE PROVIDER may now or may afterward have, claim or assert for
all and any work, labor, skill or materials furnished, delivered or performed for the
construction, design, improvement, alteration, addition or repair of the above described
project, against the OWNER or its officers, agents, employees or assigns, against any fund
of or in the possession or control of the OWNER, against the project or against all land and
the buildings on and appurtenances to the land improved by the project.
3. The SERVICE PROVIDER affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair of
the project were furnished, delivered or performed by the SERVICE PROVIDER or its
agents, employees, and servants, or by and through the SERVICE PROVIDER by various
Subcontractors or materialmen or their agents, employees and servants and further affirms
the same have been paid in full and have released in full any and all existing or possible
future mechanic's liens or rights or claims against the project or any funds in the OWNER'S
possession or control concerning the project or against the OWNER or its officers, agents,
employees or assigns arising out of the project.
4. The SERVICE PROVIDER agrees to defend and hold harmless the OWNER, the lender, if
any, and the Surety on the project against and from any claim hereinafter made by the
SERVICE PROVIDER's Subcontractors, materialmen, employees, servants, agents or
assigns against the project or against the OWNER or its officers, employees, agents or
assigns arising out of the project for all loss, damage and costs, including reasonable
attorneys fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes an
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and
may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material
bonds for the project.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 49 of 126
Signed this ______ day of __________, ___.
SERVICE PROVIDER: Company Name
By: ___________________________________________
___________________________________________
Name, Title
ATTEST:
_____________________________
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this _________ day of __________, _____, by
________________________________________________________________.
Witness my hand and official seal.
My Commission Expires: ___________________________.
_________________________
Notary Public
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 50 of 126
SECTION 00650
LIEN WAIVER RELEASE
(SUBCONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: Company Name (SERVICE PROVIDER)
WORK ORDER TITLE:
WORK ORDER NUMBER:
1. The SubService Provider acknowledges having received payment from the SERVICE
PROVIDER for all work, labor, skill and material furnished, delivered and performed by the
Subcontractor for the SERVICE PROVIDER or for anyone in the construction, design,
improvement, alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the Subcontractor voluntarily waives all
rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40
U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which
the Subcontractor may now or may afterward have, claim or assert for all and any work,
labor, skill or materials furnished, delivered or performed for the construction, design,
improvement, alteration, addition or repair of the above described project, against the
SERVICE PROVIDER or its officers, agents, employees or assigns, against the project or
against all land and the buildings on and appurtenances to the land improved by the project.
3. The Subcontractor affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair of
the project were furnished, delivered or performed by the Subcontractor or its agents,
employees, and servants, or by and through the Subcontractor by various subcontractors
or materialmen or their agents, employees and servants, and further affirms the same have
been paid in full and have released in full any and all existing or possible future mechanic's
liens or rights or claims against the project or against the SERVICE PROVIDER or its
officers, agents, employees or assigns arising out of the project.
4. The Subcontractor agrees to defend and hold harmless the SERVICE PROVIDER, the
lender, if any, and the Surety on the project against and from any claim hereinafter made by
the Subcontractor's subcontractors, materialmen, employees, servants, agents or assigns
against the project or against the SERVICE PROVIDER or OWNER, lender or Surety or
their officers, employees, agents or assigns arising out of the project for all loss, damage
and costs, including reasonable attorneys fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes an
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and
may be relied upon by the SERVICE PROVIDER, OWNER, the lender, if any, and Surety
on any labor and material bonds for the project.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 51 of 126
Signed this ______ day of _________, ___.
SUBCONTRACTOR:
By: ___________________________________________
___________________________________________
Name, Title
ATTEST:
_____________________________
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this _________ day of __________, _____, by
__________________________________________________________________.
Witness my hand and official seal.
My Commission Expires: ___________________________.
__________________________________
Notary Public
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 52 of 126
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER")
SERVICE PROVIDER: Company Name
TITLE:
WORK ORDER NUMBER:
WORK ORDER DATE:
In accordance with the provisions of the Work Order and Master Agreement between the OWNER
and the SERVICE PROVIDER as indicated above, for the Work Order titled Work Order Project
Title on bond of , (Surety)
_______________________________________ hereby approves of the Final Payment to the
SERVICE PROVIDER, and agrees that Final Payment to the SERVICE PROVIDER shall not
relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety
Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of
_________ _, _____.
____________________________________________
(Surety Company)
By: ________________________________________
(Name) Attorney-in-Fact
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 53 of 126
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 54 of 126
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950 Change Order
00960 Application for Payment
RFP 8847 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 55 of 126
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE:
SERVICE PROVIDER: [Service Provider]
WORK ORDER NUMBER:
PO NUMBER:
DESCRIPTION:
1. Reason for Change: Why is the change required?
2. Description of Change: Provide description of the changes to the Work
3. Change in Work Order Price:
4. Change in Work Order Time:
ORIGINAL WORK ORDER PRICE $ .00
TOTAL APPROVED CHANGE ORDER .00
TOTAL PENDING CHANGE ORDER .00
TOTAL THIS CHANGE ORDER .00
TOTAL % OF THIS CHANGE ORDER %
TOTAL C.O.% OF ORIGINAL WORK ORDER %
ADJUSTED WORK ORDER COST $ .00
SERVICE PROVIDER: Company Name
By: Date:
Name: Title:
ACCEPTED: Date:
City PM Name, Title
REVIEWED: Date:
Name, Buyer or Senior Buyer
ACCEPTED: Date:
Name, Title
ACCEPTED: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 56 of 126
SECTION 00960APPLICATION FOR PAYMENT
PROJECT Page 1 of 1
OWNER:
ENGINEERS:
ADDRESS:
NUMBER DATE AMOUNT
$ -
$ -
$ -
NUMBER DATE AMOUNT FUND OBJECT
Amount Due this Pay Application (before retainage):
$ -
$ -
0.00%
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager
BY: DATE: DATE:
NAME & TITLE:
BY: DATE:
NAME & TITLE: Official Purchasing Form
Last updated 10/2017
Net Change by Change Order:
Change order %:
Original Contract Amount
Net Change by Change Order
Revised Current Contract Amount
Total Work Completed to Date:
Total Stored to Date:
CHANGE ORDERS PAY APPLICATION
Application is made for Payment as shown below in connection with the Contract.
The present status of the account for this Contract is as follows:
CONTRACTOR:
$ -
$ -
RETAINAGE
$ -NumbersCharge
$ -
$ -
Less Previous Payments:
Total Completed and Stored Materials to Date:
Less Retainage
$ -
$ -
$ -
AMOUNT DUE THIS APPLICATION: $ -
The above Amount Due this Application is requested by the CONTRACTOR's Project Manager.
BY:
PO NUMBER
ADDRESS: ADDRESS:
APPLICATION NUMBER
APPLICATION DATE
PERIOD BEGINNING
PERIOD ENDING
PROJECT NUMBER
Retainage to Date:
NAME & TITLE:
Total (after retainage):
Payment of the above Amount Due This Application is approved by the OWNER.
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the WORK have been satisfied as required in paragraph 14.3 of the General Conditions
of the Contract.
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 57 of 126
Unit Price Total Quanitity Total Quantity Total Quantity Total
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
$ -
$ -
$ -
$ -
$ -
0.00%
$ - $ - $ - $ - $ - 0.00%
Official Purchasing Form
Last Updated 10/2017
Total to Date Less Retention
Change Orders to Date (see attached)
$ -
$ -
CONTRACT SUMMARY
Total Due
Adjusted Contract Amount
$ -
Total Change Order Work to Date (see attached)
Value of Work in Place
Percent Complete Including Stored Materials
Less Retention @ 10% up to 50% complete, 5% beyond 50% of Adjusted Contract
Crosscheck
Total Completed to Date
Total Materials Remaining @ Site
$ -
$ -
$ -
Original Contract Amount
Less Previous Billings $ -
$ -
$ -
$ -
$ -
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation
Page 58 of 126
ATTACHMENT A
DRAWING INDEX
WORK ORDER #
WORK ORDER TITLE
BY: Company Name who last revised the drawings
Sheet Title Drawing Revision
Date
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation
Page 59 of 126
EXHIBIT
GENERAL SCOPE OF SERVICES
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation
Page 60 of 126
EXHIBIT
(BID SCHEDULE/COMPENSATION)
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 61 of 126
EXHIBIT
INSURANCE REQUIREMENTS
1. The Service Provider will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work
under this bid, the Service Provider shall furnish the City with certificates of insurance
showing the type, amount, class of operations covered, effective dates and date of
expiration of policies, and containing substantially the following statement:
“The insurance evidenced by this Certificate will not reduce coverage or limits and
will not be cancelled, except after thirty (30) days written notice has been received
by the City of Fort Collins.”
In case of the breach of any provision of the Insurance Requirements, the City, at its
option, may take out and maintain, at the expense of the Service Provider, such
insurance as the City may deem proper and may deduct the cost of such insurance from
any monies which may be due or become due the Service Provider under this
Agreement. The City, its officers, agents and employees shall be named as additional
insureds on the Service Provider 's general liability and automobile liability insurance
policies for any claims arising out of work performed under this Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Service Provider shall
maintain during the life of this Agreement for all of the Service Provider's
employees engaged in work performed under this Agreement:
1. Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident,
$500,000 disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Service Provider shall maintain
during the life of this Agreement such commercial general liability and automobile
liability insurance as will provide coverage for damage claims of personal injury,
including accidental death, as well as for claims for property damage, which may
arise directly or indirectly from the performance of work under this Agreement.
Coverage for property damage shall be on a "broad form" basis. The amount of
insurance for each coverage, Commercial General and Vehicle, shall not be less
than $1,000,000 combined single limits for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Service Provider shall
be responsible for any liability directly or indirectly arising out of the work
performed under this Agreement by a subcontractor, which liability is not covered
by the subcontractor's insurance.
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 62 of 126
EXHIBIT
CONFIDENTIALITY
IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to
this Agreement (the “Agreement”), the Service Provider hereby acknowledges that it has been
informed that the City has established policies and procedures with regard to the handling of
confidential information and other sensitive materials.
In consideration of access to certain information, data and material (hereinafter individually and
collectively, regardless of nature, referred to as “information”) that are the property of and/or relate
to the City or its employees, customers or suppliers, which access is related to the performance
of services that the Service Provider has agreed to perform, the Service Provider hereby
acknowledges and agrees as follows:
That information that has or will come into its possession or knowledge in connection with the
performance of services for the City may be confidential and/or proprietary. The Service Provider
agrees to treat as confidential (a) all information that is owned by the City, or that relates to the
business of the City, or that is used by the City in carrying on business, and (b) all information
that is proprietary to a third party (including but not limited to customers and suppliers of the City).
The Service Provider shall not disclose any such information to any person not having a legitimate
need-to-know for purposes authorized by the City. Further, the Service Provider shall not use
such information to obtain any economic or other benefit for itself, or any third party, except as
specifically authorized by the City.
The foregoing to the contrary notwithstanding, the Service Provider understands that it shall have
no obligation under this Agreement with respect to information and material that (a) becomes
generally known to the public by publication or some means other than a breach of duty of this
Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the
request for such disclosure is proper and the disclosure does not exceed that which is required.
In the event of any disclosure under (b) above, the Service Provider shall furnish a copy of this
Agreement to anyone to whom it is required to make such disclosure and shall promptly advise
the City in writing of each such disclosure.
In the event that the Service Provider ceases to perform services for the City, or the City so
requests for any reason, the Service Provider shall promptly return to the City any and all
information described hereinabove, including all copies, notes and/or summaries (handwritten or
mechanically produced) thereof, in its possession or control or as to which it otherwise has
access.
The Service Provider understands and agrees that the City’s remedies at law for a breach of the
Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that
the City shall, in the event of any such breach, be entitled to seek equitable relief (including without
limitation preliminary and permanent injunctive relief and specific performance) in addition to all
other remedies provided hereunder or available at law.
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 63 of 126
EXHIBIT
CHANGE ORDER
NO.
PROJECT TITLE:
SERVICE PROVIDER: Company Name
WORK ORDER NUMBER:
PO NUMBER:
DESCRIPTION:
1. Reason for Change: Why is the change required?
2. Description of Change: Provide details of the changes to the Work
3. Change in Work Order Price:
4. Change in Work Order Time:
ORIGINAL WORK ORDER PRICE $ .00
TOTAL APPROVED CHANGE ORDER .00
TOTAL PENDING CHANGE ORDER .00
TOTAL THIS CHANGE ORDER .00
TOTAL % OF THIS CHANGE ORDER %
TOTAL C.O.% OF ORIGINAL WORK ORDER %
ADJUSTED WORK ORDER COST $ .00
SERVICE PROVIDER: Company Name
By: Date:
Name: Title:
ACCEPTANCE: Date:
Name, Project Manager
REVIEWED: Date:
Name, Buyer or Senior Buyer
ACCEPTANCE: Date:
Name, Title
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director (if greater than $60,000)
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 64 of 126
EXHIBIT B
SECTION 00700
GENERAL CONDITIONS
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 65 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 66 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 67 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 68 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 69 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 70 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 71 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 72 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 73 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 74 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 75 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 76 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 77 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 78 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 79 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 80 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 81 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 82 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 83 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 84 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 85 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 86 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 87 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 88 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 89 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 90 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 91 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 92 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 93 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 94 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 95 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 96 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 97 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 98 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 99 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 100 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 101 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 102 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 103 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 104 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 105 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 106 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 107 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 108 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 109 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 110 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 111 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 112 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 113 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 114 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 115 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 116 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 117 of 126
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 118 of 126
EXHIBIT C
SECTION 00800
SUPPLEMENTARY CONDITIONS
These Supplementary Conditions amend or supplement the General Conditions of the
Construction Contract (EJCDC General Conditions 1910-8, 1990 edition, with City of Fort Collins
Modifications, Rev. 9/94) and other provisions of the Work Order Documents as indicated below.
SC-1 DEFINITIONS
SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General
Conditions:
1.38. Substantial Completion. .... Substantial Completion is further defined as that
degree of completion of the operating facilities or systems of the Project defined in the
Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous,
beneficial operation of the modifications, and all inspections required have been
completed and identified conditions corrected.
SC-1.43.A. Add the following new paragraph immediately after paragraph 1.43 of the General
Conditions:
1.43.A. Work Order--A written document executed by OWNER and SERVICE
PROVIDER that provides for the construction of the Work, or a portion of the Work
pursuant to the Master Agreement and all as required by the Work Order Documents,
and that becomes a Work Order Document when executed.
SC-2 PRELIMINARY MATTERS
SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the
following paragraph:
2.8. Preconstruction Conference. Within ten days after the Work Order
Times for a Work Order start to run, but before any Work at the site is started, a
conference attended by SERVICE PROVIDER, ENGINEER and others as appropriate
will be held to establish a working relationship among the parties as to the Work and
to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop
Drawings and other submittals, processing Applications for Payment, and maintaining
required records.
SC-2.10. Add the following new paragraph immediately after paragraph 2.9 of the General
Conditions:
2.10. Work Order Required for All Work. References to the Master Agreement in
this Article 2 and in the General and Supplementary Conditions and Work Order
Documents notwithstanding, no Work shall be initiated or performed until SERVICE
PROVIDER has received a signed and executed Work Order, and the Notice to
Proceed, from OWNER; and no provision of this Article 2 or of the General and
Supplementary Conditions and Work Order Documents shall permit or require any
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 119 of 126
action of SERVICE PROVIDER in the absence of a signed and executed Work Order.
All provisions of this Article 2 and of the General and Supplementary Conditions and
Work Order Documents referencing the Master Agreement or other parts of the Work
Order Documents, or permitting or requiring any action of SERVICE PROVIDER, shall
be read as referencing and, as appropriate, requiring a signed and executed Work
Order.
SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the
General Conditions:
4.2.1.2.1. No drawing of physical conditions in or relating to existing surface or
subsurface structures (except Underground Facilities referred to in paragraph 4.3)
which are at or contiguous to the site have been utilized by the Engineer in preparation
of the Work Order Documents, except the following:
SC-5 BONDS AND INSURANCE
SC-5.4.7. Include the following parties or entities as additional insureds, as provided in
paragraph 5.4.7 of the General Conditions:
5.4.7.1. City of Fort Collins, Colorado, PO Box 580, Fort Collins, CO 80522.
5.4.7.2. list all entities to be included as named additional insureds
SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the
General Conditions:
6.4.8.1. Limits of Liability. The limits of liability for the insurance required by the paragraph
numbers of the General Conditions listed below are as follows:
For Paragraphs 5.02.A.1 and 5.02.A.2: Coverage A - Statutory Limits; Coverage B -
$100,000 / $100,000 / $500,000.
For Paragraphs 5.02.A.3 and 5.02.A.5: The Commercial General Liability policy will
have limits of $1,000,000 combined single limits (CSL). This policy will include
coverage for Explosion, Collapse, and Underground coverage unless waived by the
Owner.
For Paragraph 5.02.A.6: The Comprehensive Automobile Liability Insurance policy
will have limits of $1,000,000 combined single limits (CSL).
For Paragraph 5.02.B.3: This policy will include completed operations coverage /
product liability coverage with limits of $1,000,000 combined single limits (CSL). This
policy shall also include an Umbrella Excess Liability as follows: General liability and
automobile liability insurance in an amount not less than $1,000,000 per occurrence
in excess of the above stated primary limits.
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 120 of 126
SC-6 SERVICE PROVIDER’S RESPONSIBILITIES
SC-6.14.3. Add the following new paragraph immediately after paragraph 6.14.2 of the
General Conditions:
6.14.3. The following Laws or Regulations are included in the Work Order
Documents as mandated by statute or for the convenience of the SERVICE
PROVIDER. Other Laws and Regulations apply which are not included herein, and
are within the SERVICE PROVIDER's duty and responsibility for compliance thereto:
6.14.3.1. Notice to owners of Underground Facilities is required prior to excavations in
the vicinity of such facilities.
6.14.3.2. Unless otherwise decided by reason of the amount of the Work Order Price
involved, or other good reason, before or at the time that the contract is awarded to a
corporation outside the State of Colorado, such corporation must carry out the proper
procedure to become authorized to do business in the State of Colorado, designate a
place of business therein, and appoint an agent for service of process.
Such corporation must furnish the OWNER with a certificate from the Secretary of
State of Colorado has been issued by its office and there shall also be procured from
the Colorado Secretary of State or certified copy of the designated of place of business
and appointment of agent for service of process, or a letter from the Colorado
Secretary of State that such designation of place of business and agent for service of
process have been made.
6.14.3.3. The SERVICE PROVIDER must conform to the rules and regulations of the
Industrial Commission of Colorado. Particular reference is made to rules and
regulations governing excavation Work adopted by the Industrial Commission of
Colorado.
SC-11 CHANGE OF CONTRACT PRICE
SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions:
11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed
by the Master Agreement shall be used in lieu of any SERVICE PROVIDER'S fee,
overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2,
and 11.6.2.3.
SC-12 CHANGE OF CONTRACT TIMES
SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions:
12.3. .... Lost days due to abnormal weather conditions will be allocated as
required.
SC-14 PAYMENTS TO SERVICE PROVIDER AND COMPLETION
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 121 of 126
SC-14.1. Add the following language to the end of paragraph 14.1 of the General Conditions:
14.1. Schedule of Values. .... Progress payments on the fixed fee shall be in
proportion to the cumulative actual Cost of the Work as a percentage of the Allowable
Cost of the Work. An amount not to exceed fifteen (15%) percent of the fixed fee shall
be advanced to the Service Provider for mobilization in the first progress payment.
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 122 of 126
EXHIBIT D
SAMPLE MUTUAL NON-DISCLOSURE AGREEMENT –
NOT TO BE COMPLETED AT THIS TIME
THIS MUTUAL NON-DISCLOSURE AGREEMENT (this “Agreement”), effective as of the
day of , 20 , is between the City of Fort Collins, a Colorado home rule municipal
corporation (the “City”), and (“Vendor”). The City and Vendor may hereinafter be referred
to individually as a “Party” or collectively as the “Parties.”
WHEREAS, Vendor and the City may engage in discussions regarding the City’s strategic
technologies in relationship to sanitary sewers/stormwater mains rehabilitation (the “Purpose”);
and
WHEREAS, in the course of discussions, communications, and/or negotiations each Party may
disclose to and/or receive from the other Party certain information belonging to the disclosing
Party or its affiliates (collectively, the “Discloser”) that includes trade secrets, privileged
information, or confidential commercial and information (“Confidential Information”);
NOW, THEREFORE, in consideration of the foregoing and of the mutual covenants and promises
set forth herein and for other good and valuable consideration, the receipt and sufficiency of which
are hereby acknowledged, the Parties agree as follows:
1. Records maintained by the City are subject to public disclosure pursuant to the Colorado
Open Records Act (“CORA”). Certain confidential business records are exempt. If Vendor
provides to the City documents that include trade secrets, privileged information, or
confidential commercial or financial information, Vendor shall segregate any documents
including such information from other documents provided to the City and shall clearly
identify such documents with a stamp, watermark or other clear mark identifying the
documents as confidential pursuant to CORA.
2. The Party receiving Confidential Information (the “Recipient”) (i) shall use such
Confidential Information only for the Purpose; (ii) shall reproduce such Confidential
Information only to the extent necessary for the Purpose; (iii) shall restrict disclosure of
such Confidential Information to its, and its affiliates', employees and agents who need to
know such Confidential Information to carry out the Purpose and who are not direct
competitors of the Discloser (and require such employees and agents to undertake
confidentiality and use obligations at least as restrictive as those Recipient assumes
herein); (iv) shall not disclose such Confidential Information to any other Party without prior
written approval of Discloser; and (v) shall protect such Confidential Information with at
least the same degree of care as it normally exercises to protect its own proprietary
information of a similar nature, which shall be no less than reasonable care. If Recipient
discloses Confidential Information to an employee, affiliate, or other person in accordance
with the terms of this Agreement, any subsequent disclosure or use of such Confidential
Information by such employee, affiliate, or other person shall be deemed a disclosure or
use by Recipient and Recipient shall be responsible for such disclosure or use. The
Recipient shall immediately notify the Discloser upon the discovery of any loss or
unauthorized disclosure or use of the Confidential Information of the Discloser.
3. The restrictions on use and disclosure of Confidential Information shall not apply unless
such Confidential Information, when in tangible, electronic or viewable form is marked
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 123 of 126
confidential or proprietary by Discloser, or when disclosed only orally is both identified as
confidential or proprietary at the time of disclosure and summarized in a writing so marked
and provided to Recipient within thirty (30) days following the oral disclosure; except that
any unmarked material and any verbally disclosed information that Recipient knows or
reasonably should know to contain Confidential Information of the Discloser, including but
not limited to business or technical information not generally known to the public, such as
patents, copyrights, trademarks and trade secrets, as well as all written or oral pricing and
contract proposals exchanged between the Parties shall be subject to the use and
disclosure restrictions of this Agreement. Within the 30-day period referenced above, all
Confidential Information communicated only orally shall be subject to the use and
disclosure restrictions of this Agreement.
4. The restrictions on the use or disclosure of Confidential Information shall not apply to any
information:
a. Which is independently developed by the Recipient as evidenced by
documentation in such Party's possession; or
b. Which is lawfully received from another source free of restriction and without
breach of this Agreement by the Recipient; or
c. After it has become generally available to the public without breach of this
Agreement by the Recipient; or
d. Which at the time of disclosure to the Recipient was known to the Recipient free of
restriction as evidenced by documentation in such Party's possession; or
e. Which the Discloser agrees in writing is free of such restrictions.
5. All Confidential Information shall remain the exclusive property of the Discloser, and no
license under any intellectual property right is either granted or implied by this Agreement
or the conveying of Confidential Information to Recipient hereunder. Discloser makes no
representations, warranties, assurances, guarantees or inducements of any kind, and, in
particular, with respect to the non- infringement of any intellectual property rights, or other
rights of third persons or of Discloser.
6. Neither this Agreement nor the disclosure or receipt of Confidential Information hereunder
shall constitute or imply any promise or intention by either Party to enter into any
transaction or business relationship, nor is it an inducement for either Party or its affiliated
companies to spend funds or resources or purchase or provide products or services, nor is
it any commitment by either Party or its affiliated companies with respect to the present or
future marketing of any product or service. No such agreement will be binding unless and
until stated in a separate writing signed by authorized representatives of both Parties.
7. Each Party agrees not to announce or disclose to any other person (other than persons
described in Section 2(iii), above) the Confidential Information or the nature of any
discussions concerning the Purpose without first securing the prior written approval of the
other Party. All Confidential Information furnished hereunder shall be returned or
destroyed upon written request or upon Recipient’s determination that it no longer has a
need for such Confidential Information, except that Recipient’s legal counsel may retain
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 124 of 126
one copy in counsel’s files solely to provide a record of such Confidential Information for
archival purposes.
8. The restrictions on use and disclosure of Confidential Information disclosed hereunder
shall survive for a period of three (3) years from the date of last disclosure of any such
Confidential Information (except in the case of software, for an indefinite period). Either
Party may terminate this Agreement upon thirty (30) days advance written notice to the
other.
9. All notices or communications required or permitted as a part of this Agreement shall be in
writing (unless another verifiable medium is expressly authorized) and shall be deemed
delivered when:
a. actually received,
b. upon receipt by sender of a certified mail, return receipt signed by an employee or
agent of the Party,
c. upon receipt by sender of proof of email receipt, or
d. if not actually received, ten (10) days after deposit with the United States Postal
Service authorized mail center with proper postage (certified mail, return receipt
requested) affixed and addressed to the respective other party at the address set
forth in this Agreement or such other address as the Party may have designated by
notice or Agreement amendment to the other Party.
The consequences of failure to receive a notice due to improper notification by the
intended Recipient of a new address will be borne by the intended Recipient. The
addresses of the Parties to this Agreement are as follows:
City of Fort Collins
215 N. Mason
PO Box 580
Fort Collins, CO 80522
Attention: Attention: Purchasing Director
10. This Agreement shall not be construed to limit either Party's right to independently develop
or acquire products or services without use of the other Party's Confidential Information.
11. The restrictions on disclosure of Confidential Information under this Agreement shall not
preclude Recipient, on the advice of counsel, from complying with applicable law,
regulation, other governmental requirement or other demand under lawful process,
including a discovery request in a civil litigation, if Recipient first gives Discloser notice of
the required disclosure and cooperates with Discloser, at Discloser’s expense, in seeking
reasonable protective arrangements. In no event shall Recipient be required to take any
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 125 of 126
action which, on the advice of Recipient’s counsel, could result in the imposition of any
sanctions or other penalties by a court or government body.
12. Neither Party has any obligation to disclose Confidential Information to the other. Either
Party may, at any time: (i) cease giving Confidential Information to the other Party without
any liability, or (ii) request in writing return of Confidential Information previously disclosed.
13. Recipient acknowledges that Confidential Information provided under this Agreement may
be subject to U.S. export laws or regulations. Recipient shall not use, distribute, transfer or
transmit Confidential Information (even if incorporated into products, software or other
information) except in compliance with such laws and regulations. If requested, Recipient
shall sign written assurances and other export-related documents as may be required to
comply with such laws or regulations.
14. Each Party agrees that all of its obligations undertaken herein as Recipient shall survive
and continue after any termination of this Agreement, subject to Section 8 above.
15. No amendment or modification of this Agreement shall be valid or binding on the Parties
unless made in writing and signed by duly authorized representatives of each Party.
16. Subject to the limitations set forth in this Agreement, this Agreement will inure to the
benefit of and be binding upon the Parties. This Agreement may not be assigned by one
Party without the other Party's prior written consent.
17. If any provision of this Agreement shall be held by a court of competent jurisdiction to be
illegal, invalid or unenforceable, the remaining provisions shall remain in full force and effect
to the greatest extent permitted by law.
18. No forbearance, failure or delay in exercising any right, power or privilege is waiver
thereof, nor does any single or partial exercise thereof preclude any other or future
exercise thereof, or the exercise of any other right, power or privilege. This Agreement is
binding upon and inures to the benefit of the Parties and their heirs, executors, legal and
personal representatives, successors and assigns, as the case may be.
19. This Agreement shall be governed by the laws of the State of Colorado, U.S.A., without
regard to its conflicts of law principles. Each Party acknowledges and agrees that a breach
by it or one of its affiliates, employees or representatives of any of the covenants set forth
in this Agreement will cause irreparable injury to the other Party and its business for which
damages, even if available, will not constitute an adequate remedy. Accordingly, each
Party, for itself and its affiliates, employees and representatives, agrees that the other
Party, in addition to any other remedy available at law or in equity, shall be entitled to the
issuance of injunctive relief (including, without limitation, specific performance) by a court
of competent jurisdiction in order to enforce the covenants and agreements contained
herein.
20. Any judicial proceeding brought by or against any of the Parties on any dispute arising out
of this Agreement or any matter related hereto shall be brought exclusively in the state
district court sitting in Larimer County, Colorado, and by execution and delivery of this
Agreement, each of the Parties accepts for itself the exclusive jurisdiction and venue of the
aforesaid court as trial courts. Each Party expressly waives any objection (including,
without limitation, objections based on forum non conveniens) which any Party may have
RFP 8874 Cured-In-Place Pipe Sanitary Sewers/Stormwater Mains Rehabilitation Page 126 of 126
now or hereafter to the laying of venue or to the jurisdiction of any such suit, action, or
proceeding, and irrevocably submits generally and unconditionally to the jurisdiction of any
such court in any such suit, action, or proceeding. Each Party agrees that its attorneys
shall accept service of process.
21. This Agreement constitutes the entire understanding between the Parties as to the
treatment of Confidential Information disclosed for the Purpose and merges all prior
discussion between them relating thereto. Each Party has read this Agreement,
understands it and agrees to be bound by its terms and conditions. This Agreement may
be executed in counterparts, each of which shall be deemed an original, but all of which
taken together shall constitute one single agreement between the Parties. Signatures
exchanged by facsimile or other electronic means are effective for all purposes hereunder
to the same extent as original signatures.
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first set forth
above.
CITY OF FORT COLLINS, COLORADO
By:
By:
Printed:
Printed:
Title:
Title:
UNIT PRICE SCHEDULE
8847 CURED-IN-PLACE PIPE
SANITARY SEWER/STORMWATER MAINS REHABILITATION
Linear foot cost must include all permits, mobilization, labor, materials, debris removal, installation,
equipment, tools, traffic control, transportation, and supplies required.
QTY. DESCRIPTION PRICE/UNIT EXTENSION
1,000 Lineal Feet 6” VCP $ $
4,000 Lineal Feet 8” VCP $ $
2,100 Lineal Feet 10” VCP/RCP $ $
1,300 Lineal Feet 12” VCP/RCP $ $
200 Lineal Feet 15” VCP/RCP $ $
1,700 Lineal Feet 18” VCP/RCP $ $
1,800 Lineal Feet 24” VCP/RCP $ $
200 Lineal Feet 30” VCP/RCP $ $
900 Lineal Feet 36” VCP/RCP $ $
Service Connections 130 $ $
Intruding Taps 20 $
$
Manhole Rehabilitation
(Class A)
35 $ $
1 Each 10” CIPPR 0’-5’ Length $ $
1 Each 10” CIPPR 6’-10’ Length $ $
1 Each 10” CIPPR 11’-15’ Length $ $
1 Each 10” CIPPR 16’-20’ Length $ $
1 Each 12” CIPPR 0’-5’ Length $ $
1 Each 12” CIPPR 6’-10’ Length $ $
1 Each 12” CIPPR 11’-15’ Length $ $
QTY. DESCRIPTION PRICE/UNIT EXTENSION
1 Each 12” CIPPR 16’-20’ Length $ $
1 Each 15” CIPPR 0’-5’ Length $ $
1 Each 15” CIPPR 6’-10’ Length $ $
1 Each 15” CIPPR 11’-15’ Length $ $
1 Each 15” CIPPR 16’-20’ Length $ $
1 Each 18” CIPPR 0’-5’ Length $ $
1 Each 18” CIPPR 6’-10’ Length $ $
1 Each 18” CIPPR 11’-15’ Length $ $
1 Each 18” CIPPR 16’-20’ Length $ $
1 Each 24” CIPPR 0’-5’ Length $ $
1 Each 24” CIPPR 6’-10’ Length $ $
1 Each 24” CIPPR 11’-15’ Length $ $
1 Each 24” CIPPR 16’-20’ Length $ $
1 Each 30” CIPPR 0’-5’ Length $ $
1 Each 30” CIPPR 6’-10’ Length $ $
1 Each 30” CIPPR 11’-15’ Length $ $
1 Each 30” CIPPR 16’-20’ Length $ $
1 Each 36” CIPPR 0’-5’ Length $ $
1 Each 36” CIPPR 6’-10’ Length $ $
1 Each 36” CIPPR 11’-15’ Length $ $
1 Each 36” CIPPR 16’-20’ Length $ $
1 Each 48” CIPPR 0’-5’ Length $ $
1 Each 48” CIPPR 6’-10’ Length
1 Each 48” CIPPR 11’-15’ Length $ $
1 Each 48” CIPPR 16’-20’ Length $ $
Additional Size: Please provide per lineal ft. unit prices on other sizes you can provide and any
additional costs or pricing if quantities differ on those listed above:
DESCRIPTION
$ Per Lineal Foot
$
$
$
$
$
$
$
$
EXHIBIT A
VENDOR STATEMENT
Vendor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and
acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and
other provisions set forth in the RFP. Additionally, Vendor hereby makes the following
representations to City:
a. All of the statements and representations made in this proposal are true to the best of the
Vendor’s knowledge and belief.
b. Vendor commits that it is able to meet the terms provided in this proposal.
c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof.
d. Vendor further agrees that the method of award is acceptable.
e. Vendor also agrees to complete the proposed Agreement with the City of Fort Collins within
30 days of notice of award. If contract is not completed and signed within 30 days, City
reserves the right to cancel and award to the next highest rated firm.
f. Vendor acknowledge receipt of addenda.
Firm Name:
Physical Address:
Remit to Address:
Phone:
Name of Authorized Agent of Firm:
Signature of Authorized Agent:
Primary Contact for Project:
Title: Email Address:
Phone: Cell Phone:
NOTE: VENDOR STATEMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL.
$ -
Combined
Total Completed to Date
Total Contract Amount
Total This Period
Previous Billings
Balance Remaining
Percent Complete
PAY REQUEST
Item # Description Quantity Cost
Remaining
Percent
UOMComplete
Contract Summary This Period Previous Total to Date
Period Ending:
CERTIFICATION
BU
SCOPE OF WORK CHANGE ORDERS
RECONCILIATION CHANGE ORDERS
INVOICE NUMBER
Total Change Order Work to Date:
$ -
$ -
Retainage Previous:
Change in Retainage: