Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RESPONSE - RFP - 7657 ATHLETIC FIELD LIGHTING
This information is provided by Musco exclusively for this project. Reproduction or distribution of the enclosed documents or information without the written permission of Musco Sports Lighting, LLC is prohibited. M-1164-enUS-7 MUSCO LIGHTING PROPOSAL PREPARED FOR City of Fort Collins Athletic Field Lighting Project Fort Collins, Colorado June 25, 2014 Project # 150956 SUBMITTED BY Musco Sports Lighting, LLC 2107 Stewart Road PO Box 260 Muscatine, Iowa 52761 Local Phone: 563/263‐2281 Toll Free: 800/756‐1205 Fax: 800/374‐6402 Project Submittal: Table of Contents Edora Park Baseball, Project # 150956 A. SUBMITTAL CHECKLIST B. ON FIELD LIGHTING DESIGN Computer Model – Constant Light Level Scans Drawing #150956B, dated 23‐Jun‐14 C. OFF FIELD LIGHTING DESIGN Computer Model – Spill Light Scans Drawing #150956B, dated 23‐Jun‐14 D. PHOTOMETRIC REPORT E. LIFE CYCLE COST CALCULATION F. LUMINAIRE AIMING SUMMARY Drawing #150956B, dated 24‐Jun‐14 G. STRUCTURAL INFORMATION Drawing #C1, dated 23‐Jun‐14 H. CONTROL & MONITORING SYSTEM Control System Summary – Drawing #150956P1V1‐0624124417, dated 24‐Jun‐14 I. ELECTRICAL DISTRIBUTION PLANS J. PERFORMANCE GUARANTEE K. WARRANTY Musco Constant 25™ Warranty 25‐Year Product Assurance & Warranty Program L. PROJECT REFERENCES M. PRODUCT INFORMATION Light‐Structure Green™ Illustration Parts List/UL Letter N. NON‐COMPLIANCE O. COMPLIANCE Edora Park Baseball, Project # 150956 Project Submittal: Submittal Checklist Tab Item Description A Checklist Listing of all information being submitted must be included on the table of contents. List the name of the manufacturer’s local representative and his/her phone number. Signed submittal checklist to be included. B On Field Lighting Design Lighting design drawing(s) showing: a. Field Name, date, file number, prepared by, and other pertinent data b. Outline of field(s) being lighted, as well as pole locations referenced to the center of the field (x & y),or homeplate for baseball/softball fields. Illuminance levels at grid spacing specified c. Pole height, number of fixtures per pole, as well as luminaire information including wattage, lumens and optics d. Height of light level test meter above field surface e. Summary table showing the number and spacing of grid points; average, minimum and maximum illuminance levels in foot candles (fc); uniformity including maximum to minimum ratio, coefficient of variance and uniformity gradient; number of luminaries, total kilowatts, average tilt factor; light loss factor. f. If bidding constant light, Independent field test report from licensed professional engineer g. Alternate manufacturers shall provide both initial and maintained light scans using a maximum 0.70 Light Loss Factor to calculate maintained values. C Off Field Lighting Design Lighting design drawing showing initial spill light levels in footcandles. D Photometric Report Provide photometric report for a typical luminaire used showing candela tabulations as defined by IESNA Publication LM‐35‐02. Photometric data shall be certified by laboratory with current National Voluntary Laboratory Accreditation Program or an independent testing facility with over 5 years’ experience. E Life Cycle Cost Calculation Document life cycle cost calculations as defined in the specification. Identify energy costs for operating the luminaires, maintenance cost for the system including spot lamp replacement, and group relamping costs. All costs should be based on 25 years. F Luminaire Aiming Summary Document showing each luminaire’s aiming angle and the poles on which the luminaries are mounted. Each aiming point shall identify the type of luminaire. Edora Park Baseball, Project # 150956 Project Submittal: Submittal Checklist G Structural Information Pole structural calculations and foundation design showing foundation shape, depth backfill requirements, rebar and anchor bolts (if required). Pole base reaction forces shall be shown on the foundation drawing along with soil bearing pressures. Design must be stamped by a structural engineer in the state of Colorado. H Control & Monitoring System Manufacturer shall provide written definition and schematics for automated control system to include monitoring. They will also provide examples of system reporting and access for numbers for personal contact to operate the system. I Electrical Distribution Plans Electrical distribution plan including changes to service entrance, panels and wire sizing, signed by a licensed Electrical Engineer I the state of Colorado. Will be provided upon award. J Performance Guarantee Provide performance guarantee including a written commitment to undertake all corrections required to meet the performance requirements noted in these specifications at no expense to the owner. Light levels must be guaranteed per specification for 25 years. K Warranty Provide written warranty information including all terms and conditions. L Project References Manufacturer to provide a list of project references of similar projects completed within the past three years. M Product Information Complete set of product brochures for all components, including a complete parts list, UL Listings. N Non‐Compliance Manufacturer shall list all items that do not comply with the specifications. If in full compliance, tab may be omitted. O Compliance Manufacturer shall sign off that all requirements of the specifications have been met that the manufacturer will be responsible for any future costs incurred to bring their equipment into compliance for all items not meeting specifications and not listed in the item N – Non Compliance. I understand that the information supplied herein shall be used for the purpose of complying with the specifications for Edora Park Baseball. By signing below I agree that all requirements of the specifications have been met and that the manufacturer will be responsible for any future costs incurred to bring their equipment into compliance for all items not meeting specifications and not listed in the Non‐Compliance section. Manufacturer: Musco Sports Lighting _____________ Signature: _____________________________________ Contact Name: Richard Wadlow 720/393‐9412 Date: 6/24/2014 ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2014 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: Treana Drost File # / Date: 150956B 23-Jun-14 C3 C4 D1 D2 A3 A4 B4 B3 38 49 45 46 41 37 29 36 33 26 28 49 57 60 62 52 46 44 43 39 37 34 30 45 61 63 58 52 43 41 42 40 37 37 34 46 62 58 54 45 36 34 35 36 34 34 ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2014 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: Treana Drost File # / Date: 150956B 23-Jun-14 C1 C2 A1 A2 B1 B2 24 26 24 38 47 48 44 46 39 23 34 33 39 51 62 65 59 51 46 25 34 35 43 50 56 62 62 59 44 24 33 32 36 39 44 53 62 65 47 32 28 30 29 33 44 55 62 47 27 27 27 28 29 37 49 51 38 24 23 27 29 36 44 39 24 24 27 27 32 35 31 24 27 31 32 32 29 22 24 26 27 95' 262' 50' 55' 55' 50' 262' 95' 157' 40' 40' 157' SCALE IN FEET 1 : 80 0' 80' 160' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LAMP TYPE QTY / POLE THIS GRID OTHER GRIDS 2 A1-A2 70' - 70' 1500W MZ 4 4 0 2 B1-B2 70' - 70' 1500W MZ 7 7 0 2 C1-C2 60' - 60' 1500W MZ 4 4 0 6 TOTALS 30 30 0 Pole locaƟon(s) dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name: Edora Park Baseball LocaƟon: Fort Collins,CO GRID SUMMARY EQUIPMENT LAYOUT Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2014 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: Treana Drost File # / Date: 150956B 23-Jun-14 Large Field 333'/375'/333' - basepath 90' C3 C4 D1 D2 A3 A4 B4 Small Field C1 270'/275'/270' - basepath 90' C2 A1 A2 B1 B2 B3 SCALE IN FEET 1 : 200 0' 200' 400' Pole locaƟon(s) dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name: Edora Park Baseball LocaƟon: Fort Collins,CO EQUIPMENT LAYOUT INCLUDES: · Large Field · Small Field Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements: Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LAMP TYPE QTY / POLE 4 A1-A2 D1-D2 70' - 70' 1500W MZ 4 2 A3-A4 80' - 80' 1500W MZ 5 2 B1-B2 70' - 70' 1500W MZ 7 2 B3-B4 80' - 80' 1500W MZ 11 2 C1-C2 60' - 60' 1500W MZ 4 2 C3-C4 70' - 70' 1500W MZ 3 14 TOTALS 76 SINGLE LUMINAIRE AMPERAGE DRAW CHART Ballast SpeciĮcaƟons (.90 min power factor) AssessmentofFieldPerformanceofMuscoGreenGenerationLighting®System PreparedbyChristianK.Monrad,P.E.,LEEDAP 23May2014 ExecutiveSummary ThefollowingreportismyassessmentofthefieldperformanceofMusco’sGreenGeneration Lightingsystem;inparticulartheabilitytoprovideilluminationlevelsthatmeetorexceedthe designilluminationlevelsforthedurationoftheusefullamplife.Upon review of representative laboratory and field test data by Musco and my own field evaluations, I find the system utilizes a lumen maintenance control strategy with automated timed power adjustments that is applied such that illumination levels do not fall below target design levels during the useful life of the lamp. Background(Overview) GreenGenerationLightingsystem,oftenreferredtoasLightͲStructureGreen™systemor SportsClusterGreen™system,wasintroducedin2005andhassincebeeninstalledinthousands ofsportsͲlightingfacilitiesaroundtheworld.AnindependentstudybyMosherEngineeringCo., KentMosherP.E.(deceased2009),provedtheperformanceofthesystemmettheclaimsof maintainingtheilluminationlevelwith+/Ͳ10%ofthedesignlevelforthedurationoftheuseful lamplife,andbeyondto25yearswithproperlampmaintenance. In2010theIESRPͲ6sportslightingcommitteepublishedaclarificationtothedesignguideline formaintainedilluminationlevels.Thenewguidelinestatedthattheilluminationlevelsshall notfallbelowthedesignlevel(maintainedlevel)atanytime.Thisremovesthepreviously understoodandaccepted+/Ͳ10%allowanceinmaintainedandconstantilluminationlevels. Muscohasimplementeddesignchangestoensureallreasonableeffortsaretakentomeetthe newguidelinesofmaintainingilluminationlevelsatorabovethetargetlevel. Methodology Theassessmentofthesystemperformanceincludedreviewof representative data from over 500,000 hours of laboratory and field testing data provided by Musco,reviewofprevious fieldevaluationbyKentMosher,P.E.;andpersonalevaluationoffieldperformanceoffive sportsfieldsinthePhoenix,AZarea. Basedontheprovidedengineeringdataandpreviousfieldstudies,anexpectedfield performancemetricwasformulated.Thiswasthenappliedtothemeasuredperformanceof thefivesportsfieldstoevaluatetheoverallfieldperformance. Results Toaccuratelypredictilluminationlevelsandachieveresultsinthefieldthatcloselymatchthe predictedlevelsischallenging.Itrequiresathoroughunderstandingoftheperformanceofthe light,structuralandelectricalcomponentsofthesystem.Engineeringdataprovidedonthese componentsindicatesMuscounderstandsthelumenmaintenanceoftheir1500wattZͲLamp andaccountsforsuchinthephotometryandadjustsforlumenanddirtdepreciationviatimed poweradjustmentsusingtheirproprietarySmartLamptechnology.Additionally,strictquality controlmeasuresarefollowedtoensureperformance.Assuch,theLightLossFactorsof1.0 usedinMusco’sdesignsisappropriate. InthestudyconductedbyMosherEngineeringin2006,fieldperformanceofthelightingsystem wasconfirmedtomeettheclaimsofilluminationlevelswithin+/Ͳ10%ofthedesignlevelsfor thedurationoftheusefullamplife.Theactualperformanceofthemeasuredfieldinthestudy waswithinͲ5.3%ofthedesignlevel.Thisindicatesanincreaseisneededtoachievenewdesign guidelinesofͲ0%.Recentdesignimprovements,supportedbytheaforementionedengineering data,haveincreasedthelightoutputsuchthatthepreviousdropbelowdesignlevelisnow accountedfor. Fieldmeasuredlightingresultsandevaluationagainstengineeringdataindicatesthefivefields meettheperformanceclaimsofthesystem—constantlightlevelsthataremaintainedator abovethedesignilluminationlevelforthedurationoftheusefullamplife. Conclusion UponcompletionofmyassessmentofthefieldperformanceofMusco’sGreenGeneration systemIamconfidentinstatingthatthesystemdoesperformasclaimed.SportsͲlighting facilityownersshouldexpecttheirilluminationlevelstobemaintainedatorabovethedesign levelforthedurationofthelamplifeandbeyondtotheendofthewarrantyperiod,when properlampmaintenanceisperformed. 5/23/14 EXPIRES 3/31/17 ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2014 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: Treana Drost File # / Date: 150956B 23-Jun-14 C3 C4 D1 D2 A3 A4 B4 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04 0.03 0.03 0.04 0.03 0.03 0.03 0.04 0.03 0.03 0.03 0.04 0.04 0.03 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.06 0.07 0.07 0.07 0.08 0.08 0.09 0.09 ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2014 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: Treana Drost File # / Date: 150956B 23-Jun-14 C3 C4 D1 D2 A3 A4 B4 0.19 0.20 0.20 0.21 0.20 0.19 0.20 0.19 0.19 0.19 0.18 0.18 0.13 0.13 0.13 0.13 0.13 0.12 0.05 0.11 0.13 0.13 0.17 0.18 0.19 0.20 0.21 0.22 0.23 0.24 0.25 0.26 0.28 0.28 0.23 0.24 0.26 0.27 0.29 0.30 0.31 0.31 0.30 0.28 0.28 0.28 0.27 0.27 0.28 0.29 0.28 0.27 0.29 0.30 0.30 0.25 0.26 0.28 0.19 0.21 0.23 0.13 0.15 0.18 0.13 0.13 0.12 0.11 0.08 0.09 0.09 0.13 0.14 0.15 0.17 0.22 0.23 0.26 0.28 0.30 0.33 0.36 0.40 0.43 0.46 0.49 0.51 0.51 0.53 0.58 0.61 0.63 0.64 June 24, 2014 City of Fort Collins Fort Collins, Colorado 80524 RE: Environmental Light Control To whom it may concern: I have attached a letter from Chris Monrad, who is the Vice-President of the Board of Directors for the International Dark-Sky Association (IDA). It is written by him from his engineering practice in Tucson, AZ. The IDA, due to its 501(c) status, can not endorse products unless they are compared to a metric established by the organization. They do have a Fixture Seal of Approval (FSA) program, however, this program looks at luminaire photometry only. Luminaires that are intended to be oriented in a specific manner can be evaluated by this program. Since sports lighting applications typically utilize luminaires that are aimable (not fixed orientations), the FSA can't be used. The IDA intends to create an Installation Seal of Approval (ISA) program, which looks at the actual application of any luminaire to determine if desired results are being achieved. Chris and others feel that the Light-Structure Green technology can achieve desired results when appropriate mounting heights and aiming angles are present in the lighting design. The mounting height variance, that the city is considering, is very important in achieving this requirement. It should be of primary importance that a minimum 25 degree aiming angle is achieved to meet the intent. Chris' contact information: Christian K. Monrad, PE 1926 East Ft. Lowell Road, Suite 200 Tucson, AZ 85719 (520) 884-0045 There are many others with the IDA that feel the same in regards to Light-Structure Green and the ability to reduce glare and unwanted light in the night sky. Let me know if you need any further references. Sincerely, Treana Drost Project Engineer 800-825-6020 treana.drost@musco.com 1926 East Ft. Lowell Road, Suite 200 Tucson, Arizona 85719-2391 (520) 884-0045 Voice (520) 884-0048 Fax CONSULTING ELECTRICAL ENGINEERS BROAD VISION. PROFESSIONALLY MANAGED. PROVEN EXCELLENCE. Principals: Fernando Galvez, P.E., RCDD, CTM Joseph F. Smith, P.E. Christian K. Monrad, P.E., LEED® AP Lawrence E. Monrad, P.E., Emeritus April 8, 2008 Musco Lighting 100 1st Ave. West Oscaloosa, IA 52577 Attn: Brad Schlesselman, Lighting Specialist Re: Southern Arizona Sports Lighting Applications Dear Brad, As discussed, the Musco Light Structure Green (LSG) has been installed in numerous local sports field lighting applications in the metropolitan Tucson area and in the nearby municipality of Sahuarita, Arizona. It is our understanding that Pima County and the Town of Sahuarita have high regard for these various installations and I am impressed with them as well. The night-time sports lighting performance and daytime aesthetics of the LSG offerings with their updated finishes are outstanding, in my opinion. Given proper mounting heights and aiming angles, this system provides excellent glare control, minimal light trespass / spill lighting, and greatly curtails contributions to skyglow from direct uplighting components. Given our progressive local lighting ordinances, these features are critical to successful sports lighting project implementation. The energy efficiency of the Light Structure Green technology compared to other product offerings is also noteworthy. Yours Truly, MONRAD ENGINEERING, INC. Christian K. Monrad, P.E., LE Datasheet: Photometric Report www.musco.com · lighting@musco.com M-1170-en04-3 NVLAP Lab Code 200702-0 Musco Lighting Photometry Laboratory Oskaloosa, Iowa REPORT NUMBER: MGP00734_REV20130528 DATE: 05/24/06 REVISED: 05/28/13 CATALOG NUMBER: G15MZ_AXN_4MXX_30 PAGE 1 OF 6 LUMINAIRE: LSG, Type 4M, 7" Near Field Visor: die cast aluminum reflector housing, specular hammered and specular aluminum inserts around interior of housing, specular aluminum assembly below lamp; clear flat glass enclosure with specular hammered insert within exterior visor LAMP: MH1500/MZ "Z" Lamp, 1500 Watt Metal Halide, Musco Smart Lamp Operating System Rated 134000 Constant Lumens, Clear BT-56 Bulb, Mogul Base Position Oriented, LCL: 9-1/8", Source: 3-7/8" x 1" diameter REPORT IS BASED ON 134000 CONSTANT LUMENS PER MUSCO SMART LAMP OPERATING SYSTEM. FLOODLIGHT CHARACTERISTICS IES TYPE 4H X 4V MAXIMUM CANDLEPOWER 380976. AT 1.0 H, 1.0 V HORIZONTAL BEAM ANGLE (50%) 30.6 deg VERTICAL BEAM ANGLE (50%) 19.1 deg HORIZONTAL FIELD ANGLE (10%) 62.1 deg VERTICAL FIELD ANGLE (10%) 51.2 deg BEAM LUMENS (EFFICIENCY) 35687. ( 26.6 % ) FIELD LUMENS (EFFICIENCY) 90595. ( 67.6 % ) TOTAL LUMENS (EFFICIENCY) 113242. ( 84.5 % ) AXIAL CANDLEPOWER DEG HORIZ. DEG VERT. 90.0 0. 90.0 0. 85.0 11. 85.0 0. 75.0 91. 75.0 0. 65.0 302. 65.0 0. 55.0 896. 55.0 0. 47.5 2305. 47.5 91. 42.5 4382. 42.5 148. 37.5 16645. 37.5 536. 33.0 24234. 33.0 1347. 29.0 41974. 29.0 2328. 25.5 68353. 25.5 5193. 22.5 92849. 22.5 8023. 19.5 118355. 19.5 11766. 17.0 149824. 17.0 17917. 15.0 182748. 15.0 30425. 13.0 220796. 13.0 59274. 11.0 262952. 11.0 110252. 9.0 301428. 9.0 180403. 7.0 330403. 7.0 261143. 5.0 346694. 5.0 329958. 3.0 360565. 3.0 369809. 1.0 375960. 1.0 380468. 0.0 375595. 0.0 375595. -1.0 375960. -1.0 360657. -3.0 360565. -3.0 312064. -5.0 346694. -5.0 273012. -7.0 330403. -7.0 237828. -9.0 301428. -9.0 208043. -11.0 262952. -11.0 181236. -13.0 220796. -13.0 157955. -15.0 182748. -15.0 142925. Edora Park Baseball Fort Collins, CO 06/25/14 Typical Floodlighting Equipment Your Savings Hours Average kW Total kW Metric Tons of CO2 Energy Group Relamp Lamp Maintenance Controls - Energy 25-Year Life-Cycle Cost 7,500 7,500 123.1 71.9 51.2 $36,936 $21,583 $15,353 $23,750 $0 $23,750 $3,750 $0 $3,750 $3,694 $0 $3,694 $68,130 $21,583 $46,546 Assumptions Annual Energy Typical Floodlighting Musco Controls Operating Cost Equipment Green Energy Fixture Field Name Hours per kWh Fixtures Avg kW Fixtures Avg kW Savings Wattage 923,400.0 539,580.0 383,820.0 636.7 372.1 264.7 Large Field 300 $0.04 76 123.1 46 71.9 10.0% 1500W MZ NOTES: Carbon dioxide (CO2) is emitted by the power plant when generating the total kWh used by the lighting system. Generating one kWH of electricity in the United States emits an average of 1.52 lbs. of CO2. One metric ton equals 2,204.6 lbs. Source for CO2 calculations: http://www.epa.gov/cleanenergy/energy-resources/refs.html (10-26-12) Life-cycle costs are based upon the assumptions above per the project specifications. Any variation in this data will change the life-cycle cost proportionately. Typical Floodlighting Equipment total kWh includes base operating hours plus extra kWh consumed if no controls system included. Musco guarantees the average Green Generation Lighting system kW per hour and useful life of the lamp. 2005, 2012 Musco Sports Lighting, LLC M-1052-4 150956 PV17 Crystal Niebaum Edora Park Baseball Fort Collins, CO 06/25/14 Typical Floodlighting Equipment Your Savings Hours Average kW Total kW Metric Tons of CO2 Energy Group Relamp Lamp Maintenance Controls - Energy 25-Year Life-Cycle Cost 7,500 7,500 84.2 46.9 37.3 $25,272 $14,076 $11,196 $16,250 $0 $16,250 $3,750 $0 $3,750 $2,527 $0 $2,527 $47,799 $14,076 $33,723 Assumptions Annual Energy Typical Floodlighting Musco Controls Operating Cost Equipment Green Energy Fixture Field Name Hours per kWh Fixtures Avg kW Fixtures Avg kW Savings Wattage 631,800.0 351,900.0 279,900.0 435.7 242.7 193.0 Small Field 300 $0.04 52 84.2 30 46.9 10.0% 1500W MZ NOTES: Carbon dioxide (CO2) is emitted by the power plant when generating the total kWh used by the lighting system. Generating one kWH of electricity in the United States emits an average of 1.52 lbs. of CO2. One metric ton equals 2,204.6 lbs. Source for CO2 calculations: http://www.epa.gov/cleanenergy/energy-resources/refs.html (10-26-12) Life-cycle costs are based upon the assumptions above per the project specifications. Any variation in this data will change the life-cycle cost proportionately. Typical Floodlighting Equipment total kWh includes base operating hours plus extra kWh consumed if no controls system included. Musco guarantees the average Green Generation Lighting system kW per hour and useful life of the lamp. 2005, 2012 Musco Sports Lighting, LLC M-1052-4 150956 PV16 Crystal Niebaum AIMING SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2014 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: Treana Drost File # / Date: 150956B 24-Jun-14 MY PROJECT Name: Edora Park Baseball LocaƟon: Fort Collins,CO Zone Description Groups Zone1 B Zone2 A,B Zone3 A Pole ID Dimensioned From Pole Location Aiming Point Aiming Angle X Y Light Bank Mounting Height Reflector NEMA Type Number X Y Z HOR VER Group A1 Small Field -55.00 50.00 70.00 5 47 -0.29 -24.73 0.00 R 52.8 37.66 A 4 50 50.84 137.14 0.00 L 38.5 27.19 A 4 48 87.42 18.33 0.00 R 12.1 25.47 A 4 49 88.97 80.18 0.00 L 11.4 25.29 A A2 Small Field 50.00 -55.00 70.00 4 73 137.14 50.84 0.00 R 38.5 27.19 A 5 76 -24.73 -0.29 0.00 L 52.8 37.66 A 4 74 80.18 88.97 0.00 R 11.4 25.29 A 4 75 18.33 87.42 0.00 L 12.1 25.47 A A3 Large Field -55.00 50.00 80.00 5 1 2.56 -24.76 0.00 R 50.9 41.17 B 5 5 38.40 116.98 0.00 L 33.9 35.26 B 4 2 75.99 -10.39 0.00 R 24.0 28.99 B 4 4 102.26 100.92 0.00 L 17.2 25.74 B 4 3 104.24 50.21 0.00 L 0.1 26.50 B A4 Large Field 50.00 -55.00 80.00 5 42 116.98 38.40 0.00 R 33.9 35.26 B 5 46 -26.20 5.02 0.00 L 50.3 40.35 B 4 43 98.07 104.13 0.00 R 16.1 25.61 B 4 45 -11.82 81.54 0.00 L 23.6 28.06 B 4 44 48.78 104.65 0.00 L 0.4 26.44 B B1 Small Field -40.07 157.42 70.00 4 51 40.46 36.72 0.00 R 55.7 26.02 A 4 54 82.74 219.27 0.00 L 25.6 27.09 A 4 52 71.06 72.46 0.00 R 37.2 26.54 A 4 53 104.67 147.59 0.00 R 4.3 25.61 A 4 55 -6.66 25.87 0.00 R 75.7 26.62 A 5 57 8.55 255.95 0.00 L 63.4 31.85 A 4 56 94.17 106.55 0.00 R 20.8 25.05 A B2 Small Field 157.42 -40.07 70.00 4 66 219.27 82.74 0.00 R 25.6 27.09 A 4 69 36.72 40.46 0.00 L 55.7 26.02 A 4 67 147.59 104.67 0.00 L 4.3 25.61 A 4 68 72.46 71.06 0.00 L 37.2 26.54 A 5 70 255.95 8.55 0.00 R 63.4 31.85 A 4 72 25.87 -6.66 0.00 L 75.7 26.62 A 4 71 106.55 94.17 0.00 L 20.8 25.05 A B3 Large Field -45.00 189.00 80.00 4 6 9.23 26.59 0.00 R 71.1 25.53 B 4 11 66.27 318.67 0.00 L 48.2 25.45 B 4 7 82.67 80.00 0.00 R 39.7 25.59 B 4 10 94.16 283.54 0.00 L 33.3 25.50 B 4 8 122.25 166.17 0.00 R 7.4 25.21 B 4 9 123.09 200.01 0.00 L 3.4 25.24 B 4 12 43.64 48.67 0.00 R 57.0 25.35 B 4 16 6.97 331.23 0.00 L 69.5 27.55 B AIMING SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2014 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: Treana Drost File # / Date: 150956B 24-Jun-14 MY PROJECT Name: Edora Park Baseball LocaƟon: Fort Collins,CO Zone Description Groups Zone1 B Zone2 A,B Zone3 A Pole ID Dimensioned From Pole Location Aiming Point Aiming Angle X Y Light Bank Mounting Height Reflector NEMA Type Number X Y Z HOR VER Group 4 32 281.37 99.14 0.00 R 31.8 25.10 B 4 35 80.10 77.94 0.00 L 40.8 26.09 B 4 33 201.33 121.07 0.00 R 3.9 25.50 B 4 34 161.96 123.26 0.00 L 8.8 25.00 B 4 37 331.23 6.97 0.00 R 69.5 27.55 B 4 41 47.75 43.02 0.00 L 57.4 25.29 B 4 38 240.37 110.91 0.00 R 17.5 25.20 B 4 40 123.51 106.00 0.00 L 22.8 25.16 B 6 39 190.51 11.18 0.00 R 1.6 54.01 B C1 Small Field 95.28 261.65 60.00 5 58 -0.62 228.99 0.00 R 50.2 31.05 A 5 61 178.31 184.17 0.00 L 66.5 28.25 A 4 59 48.72 143.34 0.00 R 1.0 25.07 A 4 60 130.63 141.55 0.00 L 36.1 25.51 A C2 Small Field 261.66 95.24 60.00 5 62 187.10 182.57 0.00 R 69.1 27.98 A 5 65 249.72 -3.90 0.00 L 62.5 31.51 A 4 63 144.05 136.65 0.00 R 39.1 25.61 A 4 64 153.40 42.61 0.00 L 5.4 26.32 A C3 Large Field 61.35 348.31 70.00 5 17 -4.23 292.37 0.00 R 59.1 39.46 B 5 19 173.60 296.32 0.00 L 54.7 29.63 B 4 18 59.20 213.23 0.00 R 11.0 27.19 B C4 Large Field 348.51 61.00 70.00 5 28 296.32 173.60 0.00 R 54.7 29.55 B 5 30 292.37 -4.23 0.00 L 58.8 39.50 B 4 29 213.23 59.20 0.00 L 10.8 27.16 B D1 Large Field 187.35 324.77 70.00 5 20 76.06 314.40 0.00 R 64.2 32.51 B 5 23 251.82 233.39 0.00 L 54.4 32.44 B 4 21 131.91 202.06 0.00 R 3.9 27.28 B 4 22 177.45 189.94 0.00 L 15.4 27.23 B D2 Large Field 324.77 187.35 70.00 5 24 233.39 251.82 0.00 R 54.4 32.44 B 5 27 314.40 76.06 0.00 L 64.2 32.51 B 4 25 189.94 177.45 0.00 R 15.4 27.23 B 4 26 202.06 131.91 0.00 L 3.9 27.28 B Control System Summary Project Information Project #: 150956 Project Name: Edora Park Baseball Date: 06/24/14 Project Engineer: TrDrost Sales Representative: Richard Wadlow Control System Type: Control and Monitoring Communication Type: Digital Cellular Scan: 150956B Document ID: 150956P1V1-0624124417 Distribution Panel Location or ID: Service Total # of Distribution Panel Locations for Project: 1 Design Voltage/Hertz/Phase: 480/60/3 Control Voltage: 120 Project Specific Notes: Control-Link Central has trained staff available 24/7 Contact Information: Internet - www.control-link.com Fax - 800-347-3319 Phone - 877-347-3319 Email - schedule@musco.com Materials Checklist Contractor/Customer Supplied: A single control circuit must be supplied per distribution panel location. If the control voltage is NOT available, a control transformer is required. Electrical distribution panel to provide overcurrent protection for circuits Thermal/Magnetic circuit breaker sized per full load amps on Circuit Summary by Zone Chart Wiring: Dedicated control power circuit Power circuit to and from lighting contactors Monitoring circuit from surge protection device to Control and Monitoring cabinet 1 Harnesses for cabinets at remote locations Means of grounding, including lightning ground protection Electrical conduit wireway system Entrance hubs rated NEMA 4: must be die-cast zinc, PVC, or copper-free die-cast aluminum Mounting hardware for cabinets Control circuit lock-on device to prevent unauthorized power interruption to control power Anti-corrosion compound to apply to ends of wire, if necessary Call Control-Link Central(TM) operations center at 877/347-3319 to schedule activation of the control system upon completion of the installation. Note: Activation may take up to 1 1/2 hours Equipment Listing DESCRIPTION APPROXIMATE SIZE Control System Summary Edora Park Baseball / 150956 - 150956B C 1999,2014 Musco Sports Lighting,LLC Service - Page 2 of 4 Form: T-5030-1 T:\150\150956P1V1-0624124417.pdf Control System Summary Edora Park Baseball / 150956 - 150956B C 1999,2014 Musco Sports Lighting,LLC Service - Page 3 of 4 Form: T-5030-1 T:\150\150956P1V1-0624124417.pdf CONTROL POWER CONSUMPTION 120V Single Phase VA loading of Musco Supplied Equipment INRUSH: 4033.0 SEALED: 469.8 SWITCHING SCHEDULE Field/Zone Description Zones Small Field 1 Large Field 2 BALLAST SPECIFICATIONS VOLTAGE: 480v THREE PHASE .90 Minimum Power Factor BALLAST OPERATING VOLTAGE 1500 Watt Metal Halide Lamp Operating line amperage per fixture- maximum 1000 Watt Metal Halide Lamp Operating line amperage per fixture- maximum 208 8.6 6.5 220 8.3 6.4 240 7.5 5.8 277 6.5 4.9 347 5.1 4.0 380 4.7 3.6 480 3.7 2.9 CIRCUIT SUMMARY BY ZONE POLE CIRCUIT DESCRIPTION # OF FIXTURES FULL LOAD AMPS CONTACTOR SIZE (AMPS) CONTACTOR ID ZONE A1 Small Field 4 11.1 30 C1 1 A2 Small Field 4 11.1 30 C2 1 B1 Small Field 7 18.5 30 C3 1 B2 Small Field 7 18.5 30 C4 1 Control System Summary Edora Park Baseball / 150956 - 150956B C 1999,2014 Musco Sports Lighting,LLC Service - Page 4 of 4 Form: T-5030-1 T:\150\150956P1V1-0624124417.pdf PANEL SUMMARY CABINET # CONTROL MODULE LOCATION CONTACTOR ID CIRCUIT DESCRIPTION FULL LOAD AMPS DISTRIBUTION PANEL ID (BY OTHERS) CIRCUIT BREAKER POSITION (BY OTHERS) 1 1 C1 Pole A1 11.10 1 1 C2 Pole A2 11.10 1 1 C3 Pole B1 18.50 1 1 C4 Pole B2 18.50 1 1 C5 Pole C1 11.10 1 1 C6 Pole C2 11.10 1 1 C7 Pole A3 14.80 1 1 C8 Pole A4 14.80 1 1 C9 Pole B3 29.60 1 1 C10 Pole B4 29.60 1 1 C11 Pole C3 7.40 1 1 C12 Pole C4 7.40 2 1 C13 Pole D1 11.10 2 1 C14 Pole D2 11.10 ZONE SCHEDULE CIRCUIT DESCRIPTION ZONE SELECTOR SWITCH ZONE DESCRIPTION POLE ID CONTACTOR ID Zone 1 1 Small Field A1 C1 A2 C2 B1 C3 B2 C4 C1 C5 C2 C6 Zone 2 2 Large Field A3 C7 A4 C8 B3 C9 B4 C10 C3 C11 C4 C12 D1 C13 D2 C14 Edora Park Baseball, Project # 150956 Project Submittal: Electrical Distribution Plans Electrical Distribution Plans will be provided upon award. Edora Park Baseball, Project # 150956 Project Submittal: Performance Guarantee Musco hereby guarantees compliance with the following specifications for your project. Furthermore, Musco guarantees the constant light levels for 25 years. Field Constant Average Illumination Uniformity Lamp Tilt Factor Average kW Demand Infield Outfield Infield Outfield Large Field 50fc 30fc 2.0:1.0 2.5:1.0 1.0 71.94 Small Field 50fc 30fc 2.0:1.0 2.5:1.0 1.0 46.92 This guarantee is dependent upon the following: All test stations matched exactly to the number and location of points supplied with the Musco computer generated light scan for constant light levels. Pole placement must be within 3 feet of Musco recommendation. Voltage supply to the ballast of all fixtures must be no less than 97% of the designed secondary voltage. In the unlikely event that these performance specifications are not met, Musco shall provide necessary corrective action at no expense to the owner. We trust this meets with your approval. Musco Sports Lighting, LLC Luann Ferreira Vice‐President Sales 25-Year Product Assurance & Warranty Program Musco Constant 25 ™ ©2005, 2012 Musco Sports Lighting, LLC M-1291-enUS-8 Musco Sports Lighting, LLC will provide all materials and labor to maintain operation of your lighting system to original design FULWHULDIRU\HDUVRUXQWLOPD[LPXPKRXUVRIFRYHUDJHKDYHDFFXPXODWHGZKLFKHYHUFRPHVÀUVW0XVFRSURGXFWVDQG VHUYLFHVDUHJXDUDQWHHGWRSHUIRUPRQ\RXUSURMHFWDVGHWDLOHGLQWKLVGRFXPHQW Light Average Constant Light™ illumination levels are guaranteed through Musco’s Smart Lamp® power regulator and service technology. Musco will electronically monitor lamp operation and operating hours, and will group re-lamp as described in the Project Details on the following page. ,QGLYLGXDOODPSRXWDJHVWKDWRFFXUGXULQJWKHODPSZDUUDQW\DQGPDLQWHQDQFHSHULRGDUHUHSDLUHGZKHQWKHXVDJHRIDQ\¿HOGLVPDWHULDOO\ impacted. If actual usage exceeds the maximum hours of coverage, the customer will be required to purchase lamp replacements in order to maintain the warranty to the end of 25 years. Energy Consumption Average and maximum energy consumptions for your lighting system are guaranteed. Changes in rates or usage will proportionately change the costs. Monitoring, Maintenance and Control Services 0XVFRVKDOOPRQLWRUWKHSHUIRUPDQFHRI\RXUOLJKWLQJV\VWHPLQFOXGLQJRQRIIVWDWXVKRXUVRIXVDJHDQGODPSRXWDJHV,I¿[WXUHRXWDJHV that affect playability are detected, Musco will contact you and proactively dispatch technicians. On-off control of your lighting system is provided via an easy-to-use web site scheduling system, phone, fax, or email. Our trained Control-Link Central™ service center staff is available toll-free 24/7. Regular usage reports are always available on Control-Link Central’s web site. Structural Integrity Your project has been designed to ________________________________________ . Structural integrity of equipment manufactured by Musco is guaranteed. 0XVFRKDVDWHDPRISHRSOHWRHQVXUHIXOÀOOPHQWRIRXUSURGXFWDQGVHUYLFHVZDUUDQW\DQGPDLQWDLQVÀQDQFLDO UHVHUYHVGHGLFDWHGWRVXSSRUWRXUIXOÀOOPHQWRIWKLVZDUUDQW\3OHDVHNHHSWKLVGRFXPHQWDV\RXUVLJQHGFRQWUDFWJXDUDQWHHLQJ FRPSUHKHQVLYHVHUYLFHIRUWKH\HDUSHULRG - Page 1 of 3 - IBC-C, 2012, V=130 MPH 25-Year Product Assurance & Warranty Program Musco Constant 25 ™ ©2005, 2012 Musco Sports Lighting, LLC M-1291-enUS-8 3URMHFW'HWDLOV 3URMHFW1DPH 3URMHFW1XPEHU 2ZQHU &LW\ 6WDWH 3URGXFW V 25-Year Product Assurance & Warranty Program Musco Constant 25 ™ ©2005, 2012 Musco Sports Lighting, LLC M-1291-enUS-8 Service under this Contract is provided by Musco Sports Lighting, LLC (“Musco”) or an authorized servicer approved by Musco. Services performed under this Contract shall consist of furnishing labor and parts necessary to restore the operation of the Covered Product(s) to original design criteria provided such service is necessitated by failure of the Covered Product(s) during normal usage. This Contract covers Product(s) consisting of Musco’s Green Generation Lighting® with Control-Link® and any additional Musco manufactured product as listed on page 2. “We”, “us” and “our” mean Musco. “You” and “your” mean the purchaser of the Covered Product(s). No one has the authority to change this Contract without the prior written approval of Musco. Musco shall not assume responsibility for their agents or assignees other than as described below. If there is a conflict between the terms of this Contract and information communicated either orally or in writing by one or more of our employees or agents, this Contract shall control. $GGLWLRQDO3URYLVLRQV 1. $YDLODELOLW\RI6HUYLFH Control-Link Central operators shall be available 24/7 via web site, phone, fax, or email. Maintenance service specialists shall be available 8AM to 5PM Central Time, and services shall be rendered during these same hours in your local time zone, Monday through Friday (with the exception of national holidays). Hours of operation are subject to change without notice to you. Musco will exercise all reasonable efforts to perform service under this Contract, but will not be responsible for delays or failure in performing such services caused by adverse weather conditions, acts of any government, failure of transportation, accidents, riots, war, labor actions or strikes or other causes beyond its control. 2. 'HWHUPLQDWLRQRI5HSDLUV Musco will utilize the field monitoring system and any information provided by the customer to determine when the usage of the field is materially impacted. From this information, Musco will determine needed repair and/or replacement of Covered Product(s) and parts. Repair will be with product(s) of like kind and quality. 3. <RXU5HTXLUHPHQWV8QGHUWKLV&RQWUDFW You must meet all electrical and installation requirements as specified by the manufacturer. In addition, you promise and assure: full cooperation with Musco, Musco’s technicians and authorized servicers during telephone diagnosis and repair of the Covered Product(s); reasonable accessibility of the Covered Product(s); a non-threatening and safe environment for service. You agree to check fuses and to replace fuses as needed. Musco provides spare fuses in the lowest alpha-numeric numbered enclosure. Musco will replenish spare fuses used. You agree to keep your Green Generation Lighting system online. This means keeping the required control voltage to the control system at all times. Any deviation from this practice must be discussed with Musco’s Warranty Department. 4. 6HUYLFH /LPLWDWLRQV 7KLV &RQWUDFW GRHV QRW FRYHU Maintenance, repair or replacement necessitated by loss or damage resulting from any external causes such as, but not limited to, theft, environmental conditions, negligence, misuse, abuse, improper electrical/power supply, unauthorized repairs by third parties, attachments, damage to cabinetry, equipment modifications, vandalism, animal or insect infestation, physical damage to Covered Products parts or components, failure of existing structures, supporting electrical systems or any non-Musco equipment, or acts of God/ nature (including, but not limited to: earthquake, flood, tornadoes, typhoons, hurricanes or lightning). 5. &RQWUDFW/LPLWDWLRQV a. EXCLUSIONS FROM COVERAGE: IN NO EVENT WILL MUSCO BE LIABLE FOR ANY SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES WHICH INCLUDE, BUT ARE NOT *Partial Listing Musco Sports Lighting, LLC 2007, 2013 • M‐1064‐enUS‐4 Project Installations: Colorado/Constant 25 Warranty* www.musco.com • lighting@musco.com Baseball Widefield Park Colorado Springs, Colorado Ship Date: 11/5/13 Rodriquez Field Longmont, Colorado Ship Date: 8/30/13 Holly High School Holly, Colorado Ship Date: 4/13/12 Forbes Field Greeley, Colorado Ship Date: 4/2/14 Simillion Field Steamboat Springs, Colorado Ship Date: 9/28/12 Loveland Fairgrounds Park Loveland, Colorado Ship Date: 3/5/13 Sheridan Park Denver, Colorado Ship Date: 2/1/13 Softball Diamond Valley Sports Complex Windsor, Colorado Ship Date: 11/17/11 Rangley Recreation Fields Rangley, Colorado Ship Date: 10/28/11 Quinn Field Idaho Springs, Colorado Ship Date: 3/2/12 www.musco.com · lighting@musco.com ©1993, 2013 Musco Sports Lighting, LLC · M-1606-enUS-3 Light·Structure Green™ Lighting System Leading Technology Cuts operating costs in half Reduces spill light by 50% Includes 100% of maintenance costs for 25 years Provides constant light levels Includes system monitoring and remote on/off control services with 24/7 support All you add is concrete backfill, underground wiring, and a service entrance For your BUDGET, for the ENVIRONMENT. 5 Easy Pieces™ Complete System from Foundation to Poletop Factory wired, aimed, and tested Fast, trouble-free installation Comprehensive corrosion package Integrated lightning ground system 1Precast Concrete Base 5 Poletop Luminaire Assembly 4 Wire Harness 2 Galvanized Steel Pole 3 Electrical Components Enclosure Ground Integrated Line Lightning Ground System Safety: UL Product Certification www.musco.com · lighting@musco.com ©2011, 2014 Musco Sports Lighting, LLC · M-1684-en04-9 UL Product Certification for: Musco Sports Lighting, LLC 100 1st Ave W PO Box 808 Oskaloosa, IA 52577 USA UL Category Covers UL Number High-Intensity Discharge Surface-Mounted Luminaires • SportsCluster Green™ and Light-Structure Green™ luminaires and remote ballast assemblies • Sports Cluster® and SportsCluster-2® luminaires and remote ballast assemblies • Light-Structure 2™ and Light-Structure System™ luminaires and remote ballast assemblies • 1000 W Light-Pak™ and Light-Pak indoor luminaires with Multi-Watt™ control system • 1000 W Show-Light™ and Show-Light Green™ luminaires with hooded light actuator system and remote ballast assemblies • 2000 W Mirtran™ luminaire • Stadium 2K Fixture™ 2000 W luminaire and Hot Restrike Green™ 2000 W hot restrike luminaire E33316 Management Equipment, Energy Lighting control systems for: • Control-Link® control and monitoring system • Control-Link retrofit control system E139944 Industrial Control Panels Control panels and enclosures for: • Control-Link control and monitoring system • Control-Link retrofit control system • Lighting contactor cabinets • Multi-Watt control systems E204954 Emergency Lighting and Power Equipment • Auxiliary Lighting Interface Cabinet (ALIC) E311491 Luminaire Fittings Galvanized steel poles 12 ft (3.7 m) or less for: • Poles for Mirtran luminaire mounting • Rooftop poles • Special applications E132445 Luminaire Pole in Excess of 12 ft (3.7 m) Galvanized steel poles greater than 12 ft (3.7 m) for: • Light-Structure Green system luminaire mounting • Light-Structure system luminaire mounting • Sportspole™ structure or mounting system and special applications E325078 Safety: UL Product Certification www.musco.com · lighting@musco.com ©2011, 2014 Musco Sports Lighting, LLC · M-1684-en04-9 UL Category Covers UL Number Devices, Scaffolding Service platforms for: • Light-Structure Green and Light-Structure System luminaires and remote ballast assemblies • SportsCluster Green and Sports Cluster luminaires and remote ballast assemblies SA7004 Lightning Conductors, Air Terminals, and Fittings • Light-Structure Green pole structure concrete base E337467 Light-Emitting-Diode Surface-Mounted Luminaires • LED luminaires and driver assemblies • LED auxiliary luminaires E338094 A copy of the UL Certificate of Compliance is available upon your request. Edora Park Baseball, Project # 150956 Project Submittal: Non-Compliance Upon investigation of the age of the equipment, Lee Martinez Park was installed in 1979 and Rolland Moore was installed in 1983. Due to the age of the equipment we feel this is outside of our normal range of being able to provide a 10 year Maintenance Agreement. Musco is also not able to provide an extended “warranty” on lighting products other than our Light Structure System (I.E. Fossil Creek Park). 10 Club Service Warranty Program Musco’s Comprehensive 10 Year Extended Warranty Program Musco’s “10Service” “10 Club Service” includes the following: Scheduled group re-lamps of your facility including lamps, labor and lift (Group re-lamps are scheduled according to the annual hourly usage specific to your facility) All labor and materials to maintain the operation of your lighting system for a period of 10 years or until your system reaches the specified number of hours, whichever comes first. Toll free, direct access to our Warranty Specialists. Save Routine Maintenance costs Musco’s “10 Club Service” eliminates the need to budget operating dollars or schedule time for routine maintenance issues. For the next 10 years, Musco provides preventative and spot maintenance as needed, including all parts and labor. Individual lamp outages would be repaired when the usage of the field is materially impacted. Exclusions are vandalism, major storms or lightning, failure of owner’s electrical service, or unauthorized alterations. Owner agrees to check fuses and to replace fuses as needed. Musco provides spare fuses and a fuse puller in the lowest alpha-numeric enclosure. Musco will replenish spare fuses used. Your Musco Warranty specialist is available toll-free for prompt assistance and to schedule our Field Services Team or a qualified contractor in your area. Thank You for Your interest in a Musco’s “10 Club Service”. Rick Van Dusseldorp Lighting Services Sales Representative Musco Lighting LLC Phone-800/825-6020 Fax-888/397-8736 Datasheet: Control-Link® Control System www.musco.com · lighting@musco.com ©2012, 2013 Musco Sports Lighting, LLC · Control-Link® is a registered trademark of Musco Corporation in the United States. U.S. patents issued and pending. · M-1138-enUS-6 1 Overview Control-Link® control system provides flexible remote on/off control of your lighting system. Features Control • Existing Musco or other manufacturer’s lighting system and auxiliary equipment • Customized on/off control via phone, website, smartphone application, email, or fax up to 10 years in advance • Multi-level user security settings • On/off/auto switches allow manual or automated control • Seven controllable lighting zones Management and Support • Control-Link Central™ service center provides support 24 hours a day, 7 days a week for scheduling, monitoring, and reporting • Customized usage reports through website Technical Specifications Ratings UL 508A Listed ...................................... E204954 FCC Part 15 ................................ Class A compliant Operating temperature ......................... -4 ˚F to 140 ˚F (-20 ˚C to 60 ˚C) Weight for control cabinet ........................33 lb (15 kg) Construction • NEMA type 4 cabinet • Powder-coated aluminum 5052 H32 cabinet and panel • Lockable door • External mounting feet • Requires 120 V phase-to-neutral control voltage MKT-3005_A Control (Retro 2) System RWS 22 April 2013 31.75 in (806 mm) 32.98 in (838 mm) 12.00 in (305 mm) 15.75 in (400 mm) 9.88 in (251 mm) 8.63 in (219 mm) 11.69 in (297 mm) 0.44 in dia. (11 mm) Datasheet: Control-Link® Control System 2 www.musco.com · lighting@musco.com ©2012, 2013 Musco Sports Lighting, LLC · Control-Link® is a registered trademark of Musco Corporation in the United States. U.S. patents issued and pending. · M-1138-enUS-6 Internal Details • Factory wired, programmed, and tested • Internally fused • Control power terminal blocks provided • Interposing relays provided to interface with existing contactors Control Module Receives and stores schedules from Control-Link Central™ service center, operates your equipment, and verifies schedules were carried out. • Stores and executes schedules for up to 7 days • Reboots automatically and executes current schedule when power is restored, in case of power interruption Communication Module Integrated communication system provides two-way reliable, high speed communication to Control-Link Central service center with no additional monthly charges during warranty period. Interposing Relays Interposing relays control existing contactors. • 10 A contacts • 120 V coil COMPANY PROFILE Notre Dame University South Bend, Indiana Losail International Circuit Doha, Qatar Yankee Stadium Bronx, New York Chongqing Olympic Center Chongqing, China APM Terminals Portsmouth, Virginia ©2001, 2011 Musco Sports Lighting, LLC · B-1350-8 Introduction For more than 30 years, Musco Lighting has specialized in lighting systems for sports and large areas. Musco pioneered dramatic improvements in energy efficiency and affordable ways to control spill light and glare. Permanent and temporary lighting services range from neighborhood Little League® fields to Olympic Games. Headquarters: Oskaloosa, Iowa Manufacturing: Muscatine, Iowa; Shanghai, China Global Offices: Australia, Canada, China, Cyprus, Dubai, Greece, Ireland, Korea, United Kingdom, Poland Special Projects* • Olympic Games — Vancouver, 2010; • Citi Field, NY Mets Athens, 2004; Sydney, 2000; • Yankees Stadium, NY Yankees Atlanta, 1996; LA, 1984 • Yas Marina F1 Circuit • “Battle”: Tiger Woods Golf, 2000 – 2004 • Nationals Park, Washington Nationals • Disney’s Wide World of Sports™ Complex • Dodger Stadium, LA Dodgers • Daytona International Speedway • Comerica Park, Detroit Tigers • Losail International Circuit • Lamade Stadium, Home of the • Wimbledon Centre Court Little League® World Series • 02 World Arena — Berlin • NFL Super Bowls XVII, XIX, XXI, • Tianjin TEDA Soccer Stadium XXVII, XXX, XXXV, XXXVIII, XL, XLII,XLIII, XLIV Major Innovations 1982 “The night the lights went on at Notre Dame Stadium,” said Keith Jackson, broadcaster. Made television history by taking sports lighting on the road with Musco mobile™ lighting systems for broadcast of Notre Dame vs. Michigan prime time college football game 1987 Made significant technical advancements in providing affordable light control with Level-8™ and Total Light Control™ 1991 Introduced the industry’s first sports-lighting system complete from foundation to pole top: Light-Structure System™ 1992 Revolutionized NASCAR broadcasts by making night racing at the Winston Cup level possible. Mirtran™ systems were first used at Charlotte (now Lowe’s) Motor Speedway and as of 2008, are in place at 16 speedways, including the granddaddy of them all, Daytona International Speedway 1996 Introduced cost-effective, quality lighting for dramatic player introductions and special effects in large indoor arenas. ShowLight™ systems were first used at Charlotte Coliseum and are now installed throughout U.S., England, and Ireland 1999 Introduced technology to dramatically advance on/off capability and facility management. Control·Link® allows facility managers to control their lighting systems remotely as well as perform critical management reports 2005 Revolutionized sports lighting with the introduction of Light-Structure Green™, cutting energy costs in half, reducing spill light by 50%, and eliminating maintenance costs for 25 years 2005 Introduced industry-leading 25-year warranty guaranteeing customers’ lights will perform at design light levels: Constant 25™ Television Credits ABC, CBS, NBC, TBS, TNN, ESPN, ESPN2, FOX, FoxSports, SkyTV, CBC, and Channel 9 (Australia) have relied on Musco to provide quality AWARDS AND PARTNERSHIPS ©1998, 2010 Musco Sports Lighting, LLC · B-1400-7 Academy Award The Academy of Motion Picture Arts and Sciences awarded Musco an Academy Award for scientific and engineering achievement in film lighting. Emmy Award Musco was awarded an Emmy by the Academy of Television Arts and Sciences for lighting NCAA football telecasts. Paul Waterbury Award The 1993 Paul Waterbury Award of Excellence for Outdoor Lighting, one of two presented worldwide, was awarded to Musco for innovative lighting design at Charlotte (now Lowe’s) Motor Speedway. Little League® Baseball and Softball As the Official Sports-Lighting System of Little League® Baseball and Softball, Musco has worked with Little League to develop lighting guidelines and ASAP, A Safety and Awareness Program, which has reduced injuries by 80% through grassroots safety awareness. Disney’s Wide World of Sports™ Complex Musco was selected to light Disney’s Wide World of Sports complex, a state-of-the-art, 200-acre complex with facilities for more than 30 sports. Amateur Softball Association As the Official Lighting Supplier of the Amateur Softball Association, Musco partnered with ASA to establish a lighting program that will assist leagues in lighting their facilities to meet ASA Lighting Guidelines. Babe Ruth League® As the Official Lighting Supplier of Babe Ruth League, Musco joined Babe Ruth to establish lighting standards and help leagues develop facilities that are safe, affordable, and fun. US Soccer Foundation™ Musco is proud to have been selected as a US Soccer Foundation Resource Center Partner. The United States Soccer Foundation is an organization dedicated to helping meet the growing needs of soccer in the United States. National Recreation and Park Association As a Major Partner, Musco helped fulfill the challenge of developing the Ahrens National Recreation and Park Association Institute, a research and education center at the NRPA national headquarters. Musco is proud to serve as the sole sponsor of NRPA’s annual National Gold Medal Awards for Excellence in Park and Recreation Management program. European Hockey Federation Musco was selected as the Approved Lighting of the European Hockey Federation, an organization with a proud history serving hockey interests across the European Union, to provide quality, affordable lighting systems to its member clubs. 800/825-6030 www.musco.com Musco Sports Lighting, LLC 2009, 2013 1 M-1290-enUS-5 Fort Collins City Parks Athletic Field Lighting Fort Collins, CO Date: June 25, 2014 Bid Quote Quotation Price – Cost for Full ball field replacement for Small field (90’270’/275’/270’) Musco’s Light Structure Green™ lighting system $160,000 per field Quotation Price – Cost for Full ball field replacement for Large field (90”/333’/375’/333’ Musco’s Light Structure Green™ lighting system $257,000 per field Quotation Price – Cost for Small field relamping and conversion to wireless controls system Existing field - 10 year warranty $17,150 City Park North $21,350 City Park South Quotation Price – Cost for Large field relamping and conversion to wireless controls system Existing Field - Warranty not available for these fields due to age of equipment $13,120 per field Rolland Moore $15,420 per field Lee Martinez Quotation Price – Cost for Edora East Ball field full replacement, conversion to control system/ 25 year warranty Musco’s Light Structure Green™ lighting system $160,000 Quotation Price – Cost by hour for Lighting technician $94.00 per hour (8 hr. minimum) Quotation Price – Daily Lift Charge $1500.00 per day Quotation Price – Cost for 1500 watt Metal Halide Straight Lamp cost including lamp disposal $ 50.00 EA Straight Lamp $ 70.00 EA Z Lamp Quotation Price – Cost Fossil Creek addition of Parking Lot Lighting to Controls System $1200.00 Zone Addition Quotation Price – Cost for Small field retrofitting to Musco’s SCG/ conversion to wireless controls system/10 yr warranty Per addendum 1 $97,000 per field Quotation Price – Cost for Large field retrofitting Musco’s SCG/ conversion to wireless controls system/10 yr warranty Per addendum 1 $135,000 per field Quote Musco Sports Lighting, LLC 2009, 2013 2 M-1290-enUS-5 Quotation Price – Upgrading to intercollegiate level play light levels and relamping with 10 year warranty and installation of wireless control system on 1 ballfield. City Park South $97,000 Pricing furnished is effective for 90 days unless otherwise noted and is considered confidential. Equipment Description – Edora East Ball field Full replacement (Small Field) Light Structure Green™ System delivered to your site in Five Easy Pieces™ Pre-cast concrete bases Galvanized steel poles Electrical component enclosures Pole length wire harness Factory-aimed and assembled luminaires Also Includes: Energy savings of more than 50% over a standard lighting system 50% less spill and glare light than Musco’s prior industry leading technology Musco Constant 25™ product assurance and warranty program that eliminates 100% of your maintenance costs for 25 years, including labor and materials Guaranteed constant light level of 50 footcandles Infield and 30 footcandles Outfield for 25 years One group re-lamp at the end of the lamps’ rated life, 5000 hours Reduced energy consumption with an average of 46.9 kW per hour Control Link® Control & Monitoring System for flexible control and solid management of your lighting system Lighting Contactors sized for 480 Volt 3 phase Sales tax, labor, and unloading of the equipment are not included as part of this quote. Divulging technical or pricing information to competitive vendors will result in removal from the bid list. Payment Terms Per Musco Credit Department approved terms Musco will make every effort to coordinate shipment so that delivery corresponds with the customer’s payment schedule. We will expect payment within the terms described above unless there is a written statement from Musco’s corporate headquarters stating the acceptance of different terms. Delivery to the job site from the time of order, submittal approval, and confirmation of order details including voltage and phase, pole locations is approximately 30-45 days. Due to the built-in custom light control per luminaire, pole locations need to be confirmed prior to production. Changes to pole locations after the product is sent to production could result in additional charges. Notes Quote is based on: Shipment of entire project together to one location Field size of (90’270’/275’/270’) for Baseball Field 480 Volt, 3 Phase electrical system requirement Structural code and wind speed = 2009 IBC, V=100 MPH and 2012 IBC V=130 MPH. Confirmation of pole locations prior to production Thank you for considering Musco for your sports lighting needs. Please contact me with any questions Richard Wadlow Musco Field Sales Rep Colorado 720/393-9412 lighting to meet broadcast requirements. www.musco.com *Partial Listing LIMITED TO, ANY DELAY IN RENDERING SERVICE OR LOSS OF USE DURING THE REPAIR PERIOD OF THE COVERED PRODUCT(S) OR WHILE OTHERWISE AWAITING PARTS. b. Limitation of Liability: To the extent permitted by applicable law, the liability of Musco, if any, for any allegedly defective Covered Product(s) or components shall be limited to repair or replacement of the Covered Product(s) or components at Musco’s option. THIS CONTRACT IS YOUR SOLE EXPRESS WARRANTY WITH RESPECT TO THE COVERED PRODUCT(S). ALL IMPLIED WARRANTIES WITH RESPECT TO THE COVERED PRODUCT(S) INCLUDING, BUT NOT LIMITED TO, IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ARE HEREBY EXPRESSLY EXCLUDED. c. For the purposes of and by your acceptance of this Contract you acknowledge and agree that if a surety bond (“Bond”) is provided the warranty and/or maintenance guarantee provided for in this Contract and any corresponding liability on behalf of the issuing surety under the Bond is limited to the first twelve (12) months of said warranty and/or maintenance guarantee coverage period. Any warranty and/or guarantee coverage period in excess of said initial 12 month period does not fall within the scope of the Bond and shall be the sole responsibility of Musco. d. Musco requires reasonable access for a crane or man lift equipment to service the lighting system. Musco will not be responsible for damage from operating the vehicle on the property when the equipment is operated in the prescribed manner over the designated access route. 6. 7UDQVIHU DQG $VVLJQPHQW Except to owners, you shall not have the right to assign or otherwise transfer your rights and obligations under this Contract except with the prior written consent of Musco; however, a successor in interest by merger, operation of law, assignment or purchase or otherwise of your entire business shall acquire all of your interests under this Contract. 7. *RYHUQLQJ /DZ Unless otherwise governed by applicable state law, the Contract shall be interpreted and enforced according to the laws of the State of Iowa. 8. 6XEURJDWLRQ In the event Musco repairs or replaces any Covered Product(s), parts or components due to any defect for which the manufacturer or its agents or suppliers may be legally responsible, you agree to assign your rights of recovery to Musco. You will be reimbursed for any reasonable costs and expenses you may incur in connection with the assignment of your rights. You will be made whole before Musco retains any amounts it may recover. 6LJQDWXUH ___________________________________________ 9LFH3UHVLGHQWRI6DOHV - Page 3 of 3 - Terms and Conditions &RYHUHG 'DWH,VVXHG ([SLUDWLRQ __________________________________________ RUPD[LPXPKRXUVRIFRYHUDJHQRWHGEHORZZKLFKHYHURFFXUVÀUVW 7RWDO$YHUDJHN:SHUKRXUBBBBBBBB7RWDO0D[LPXPN:SHUKRXUBBBBBBBB 0XVFRSURGXFWVDQGVHUYLFHVDUHJXDUDQWHHGWRSHUIRUPRQ\RXUSURMHFWDVIROORZV - Page 2 of 3 - Field/Zone Fixture Quantity Lamp Type/ Lamp Hours Average Target Constant Light Level Uniformity Max/Min Total Relamps Included Estimated Annual/25- Year Estimated Usage Hours Maximum Hours of Coverage Edora Park Baseball 150956 City of Fort Collins Fort Collins CO Light-Structure Green™ System date of shipment date of shipment + 25 years 118.9 129.2 Large Field 46 1500W MZ / 5,000 50fc infield 30fc outfield 2.0:1.0 / 2.5:1.0 1 300 / 7,500 10,000 Small Field 30 1500W MZ / 5,000 50fc infield 30fc outfield 2.0:1.0 / 2.5:1.0 1 300 / 7,500 10,000 C1 Small Field 4 11.1 30 C5 1 C2 Small Field 4 11.1 30 C6 1 A3 Large Field 5 14.8 30 C7 2 A4 Large Field 5 14.8 30 C8 2 B3 Large Field 11 29.6 30 C9 2 B4 Large Field 11 29.6 30 C10 2 C3 Large Field 3 7.4 30 C11 2 C4 Large Field 3 7.4 30 C12 2 D1 Large Field 4 11.1 30 C13 2 D2 Large Field 4 11.1 30 C14 2 1.Control and Monitoring Cabinet 24 X 72 2.Control and Monitoring Cabinet 24 X 48 3.Surge Protection Device 6 X 10 QTY SIZE Total Contactors 14 30 AMP Total Off/On/Auto Switches: 2 IMPORTANT NOTES 1. Please confirm that the design voltage listed above is accurate for this facility. Design voltage/phase is defined as the voltage/phase being connected and utilized at each lighting pole's ballast enclosure disconnect. Inaccurate design voltage/phase can result in additional costs and delays. Contact your Musco sales representative to confirm this item. 2. In a 3 phase design, all 3 phases are to be run to each pole. When a 3 phase design is used Musco's single phase luminaires come pre-wired to utilize all 3 phases across the entire facility. 3. One contactor is required for each pole. When a pole has multiple circuits, one contactor is required for each circuit. All contactors are UL 100% rated for the published continuous load. All contactors are 3 pole. 4. If the lighting system will be fed from more than one distribution location, additional equipment may be required. Contact your Musco sales representative. 5. A single control circuit must be supplied per control system. 6. Size overcurrent devices using the full load amps column of the Circuit Summary By Zone chart- Minimum power factor is 0.9. NOTE: Refer to Installation Instructions for more details on equipment information and the installation requirements C 1999,2014 Musco Sports Lighting,LLC Form: T-5030-1 T:\150\150956P1V1-0624124417.pdf 4 13 107.21 124.39 0.00 R 22.3 25.06 B 4 15 110.85 240.54 0.00 L 17.6 25.20 B 6 14 12.83 191.43 0.00 L 2.4 53.20 B B4 Large Field 189.00 -45.00 80.00 4 31 320.78 67.92 0.00 R 48.3 25.10 B 4 36 27.21 9.64 0.00 L 70.9 25.59 B -17.0 149824. -17.0 130748. -19.5 118355. -19.5 116700. -22.5 92849. -22.5 98658. -25.5 68353. -25.5 82179. -29.0 41974. -29.0 66179. -33.0 24234. -33.0 49734. -37.5 16645. -37.5 35572. -42.5 4382. -42.5 24547. -47.5 2305. -47.5 17780. -55.0 896. -55.0 9541. -65.0 302. -65.0 1849. -75.0 91. -75.0 913. -85.0 11. -85.0 422. -90.0 0. -90.0 0. Accredited by the National Voluntary Laboratory Accreditation Program for specific scope of accreditation under Lab Code 200702-0. This NVLAP logo does not imply endorsement by NVLAP, NIST, or any agency of the U.S. Government and this account must not be used to claim such endorsement. This technical data is the confidential property of Musco Sports Lighting, LLC. Any reproduction or use of this information in whole or part for anything other than its limited, intended purpose for this project, without the written permission of Musco, is prohibited. Report made in accordance with IESNA LM-35-02, with a test distance of 48 feet. All candela and lumen values in this report are based on relative photometry with an ANSI M48 commercially available ballast. The results listed herein relate only to the item tested. _REV20130528 removed field performance note and added electronic signature. Approved Checked JTS Jason T. Schutz 0.64 0.62 0.62 0.54 0.48 0.43 0.39 0.35 0.32 0.29 0.26 0.24 0.22 0.20 0.12 C1 C2 A1 A2 B1 B2 B3 SCALE IN FEET 1 : 200 0' 200' 400' Pole locaƟon(s) dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name: Edora Park Baseball LocaƟon: Fort Collins,CO GRID SUMMARY Name: Property Line - 20' Oīset Spacing: 30.0' Height: 3.0' above grade CONSTANT ILLUMINATION SUMMARY MAX VERTICAL FOOTCANDLES EnƟre Grid Scan Average: 0.1633 Maximum: 0.64 Minimum: 0.00 No. of Points: 287 LUMINAIRE INFORMATION Luminaire Type: Green GeneraƟon Rated Lamp Life: 5,000 hours Design Lumens: 134,000 Avg Lamp Tilt Factor: 1.000 No. of Luminaires: 76 Avg KW: 118.86 (129.2 max) Guaranteed Performance: The CONSTANT ILLUMINATION described above is guaranteed for the rated life of the lamp. Field Measurements: IlluminaƟon measured in accordance with IESNA LM-5-04 and CIBSE LG4. Individual values may vary. See the Warranty document for details. Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements: Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. 0.09 0.09 0.09 0.07 0.06 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.02 0.01 C1 C2 A1 A2 B1 B2 B3 SCALE IN FEET 1 : 200 0' 200' 400' Pole locaƟon(s) dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name: Edora Park Baseball LocaƟon: Fort Collins,CO GRID SUMMARY Name: Property Line - 20' Oīset Spacing: 30.0' Height: 3.0' above grade CONSTANT ILLUMINATION SUMMARY HORIZONTAL FOOTCANDLES EnƟre Grid Scan Average: 0.0174 Maximum: 0.09 Minimum: 0.00 No. of Points: 287 LUMINAIRE INFORMATION Luminaire Type: Green GeneraƟon Rated Lamp Life: 5,000 hours Design Lumens: 134,000 Avg Lamp Tilt Factor: 1.000 No. of Luminaires: 76 Avg KW: 118.86 (129.2 max) Guaranteed Performance: The CONSTANT ILLUMINATION described above is guaranteed for the rated life of the lamp. Field Measurements: IlluminaƟon measured in accordance with IESNA LM-5-04 and CIBSE LG4. Individual values may vary. See the Warranty document for details. Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements: Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. Line Amperage Per Luminaire (max draw) Single Phase Voltage 208 (60) 220 (60) 240 (60) 277 (60) 347 (60) 380 (60) 480 (60) 1500 waƩ MZ 8.6 8.3 7.5 6.5 5.1 4.7 3.7 Name: Small Field Size: 270'/275'/270' - basepath 90' Spacing: 30.0' x 30.0' Height: 3.0' above grade CONSTANT ILLUMINATION SUMMARY HORIZONTAL FOOTCANDLES InĮeld Ouƞield Guaranteed Average: 50 30 Scan Average: 52.15 31.67 Maximum: 65 51 Minimum: 33 22 Avg / Min: 1.58 1.42 Guaranteed Max / Min: 2 2.5 Max / Min: 1.98 2.28 UG (adjacent pts): 1.37 1.65 CU: 0.69 CV: 0.17 0.23 No. of Points: 25 56 LUMINAIRE INFORMATION Luminaire Type: Green GeneraƟon Rated Lamp Life: 5,000 hours Design Lumens: 134,000 Avg Lamp Tilt Factor: 1.000 No. of Luminaires: 30 Avg KW: 46.92 (51.0 max) Guaranteed Performance: The Guaranteed Average CONSTANT ILLUMINATION described above is guaranteed for the rated life of the lamp. Field Measurements: IlluminaƟon measured in accordance with IESNA LM-5-04 and CIBSE LG4. Individual values may vary. See the Warranty document for details. Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements: Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. 33 41 52 52 44 37 31 29 30 30 29 28 32 37 47 43 36 31 26 25 27 28 25 29 30 29 45 41 34 30 25 24 26 26 28 30 24 36 43 41 34 30 27 27 27 24 25 29 33 39 40 35 30 28 27 24 26 29 24 26 36 37 34 28 25 27 25 29 27 28 34 37 33 27 28 30 28 24 30 34 33 32 30 24 348' 61' 61' 349' 325' 187' 187' 325' 50' 55' 55' 50' 45' 189' 189' 45' SCALE IN FEET 1 : 80 0' 80' 160' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LAMP TYPE QTY / POLE THIS GRID OTHER GRIDS 2 A3-A4 80' - 80' 1500W MZ 5 5 0 2 B3-B4 80' - 80' 1500W MZ 11 11 0 2 C3-C4 70' - 70' 1500W MZ 3 3 0 2 D1-D2 70' - 70' 1500W MZ 4 4 0 8 TOTALS 46 46 0 Pole locaƟon(s) dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name: Edora Park Baseball LocaƟon: Fort Collins,CO GRID SUMMARY Name: Large Field Size: 333'/375'/333' - basepath 90' Spacing: 30.0' x 30.0' Height: 3.0' above grade CONSTANT ILLUMINATION SUMMARY HORIZONTAL FOOTCANDLES InĮeld Ouƞield Guaranteed Average: 50 30 Scan Average: 50.80 31.96 Maximum: 63 47 Minimum: 37 24 Avg / Min: 1.36 1.33 Guaranteed Max / Min: 2 2.5 Max / Min: 1.68 1.94 UG (adjacent pts): 1.35 1.55 CU: 0.68 CV: 0.15 0.18 No. of Points: 25 105 LUMINAIRE INFORMATION Luminaire Type: Green GeneraƟon Rated Lamp Life: 5,000 hours Design Lumens: 134,000 Avg Lamp Tilt Factor: 1.000 No. of Luminaires: 46 Avg KW: 71.94 (78.2 max) Guaranteed Performance: The Guaranteed Average CONSTANT ILLUMINATION described above is guaranteed for the rated life of the lamp. Field Measurements: IlluminaƟon measured in accordance with IESNA LM-5-04 and CIBSE LG4. Individual values may vary. See the Warranty document for details. Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements: Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons.