Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9136897DATE: 1-27-14 PROPOSAL SUBMITTED TO: Chad Mapp JOB NAME: FC PAN Remodel ITEMS INCLUDED IN PROPOSAL: Demo, Framing, Drywall and paint PROJECT ESTIMATOR: Josh Kintzley (970) 566-1616 Joshkintzley@4kpaintingdrywall.com Hallway 1. Remove wood strips from existing walls. 2. Repair walls. Total labor and material $1,538.00 Hallway Partition wall 1. Frame wall to enclose electrical equipment. 2. Provide and install 5/8” sheetrock. 3. Tape and finish to match existing. Total labor and material $987.00 Hallway ceiling 1. Remove and replace existing 2x4 tile. Total labor and material $825.00 2. Paint existing ceiling grid white. Total labor and material $387.00 Lobby/ Control/Editing Room 1. Demo existing glass, wood frame and door. Total labor and material $258.00 2. Install 3 door frames and 1 window frame supplied by other. Total labor $400.00 Control/Editing Room Wall 1. Frame wall with 3 5/8” 25G material. 2. Insulate wall with R-11. 3. Provide and install RC-1 on 1 side of wall, 2’ centers. 4. Hang 5/8” sheetrock. 5. Tape and finish wall to match existing. Total labor and material $3,255.00 Control/Editing Ceiling 1. Repair existing ceiling where lights are being removed. 2. Repair holes from existing electrical, humidifier etc. Total labor and material $498.00 Paint 1. Prime new sheetrock and repairs. 2. Paint hallway walls. 3. Paint Lobby walls. 4. Paint walls and ceilings in Control/Editing room. 5. Paint all new and existing door and frames. - Price includes painting control/editing room Flat Black - Price includes 1 color for hallway and lobby walls and 1 door and frame color. Total labor and material $3,895.00 DATE: 1-27-14 PROPOSAL SUBMITTED TO: Chad Mapp JOB NAME: FC PAN Remodel ITEMS INCLUDED IN PROPOSAL: Demo, Framing, Drywall and paint PROJECT ESTIMATOR: Josh Kintzley (970) 566-1616 Joshkintzley@4kpaintingdrywall.com Hallway 1. Remove wood strips from existing walls. 2. Repair walls. Total labor and material $1,538.00 Hallway Partition wall 1. Frame wall to enclose electrical equipment. 2. Provide and install 5/8” sheetrock. 3. Tape and finish to match existing. Total labor and material $987.00 Hallway ceiling 1. Remove and replace existing 2x4 tile. Total labor and material $825.00 2. Paint existing ceiling grid white. Total labor and material $387.00 Lobby/ Control/Editing Room 1. Demo existing glass, wood frame and door. Total labor and material $258.00 2. Install 3 door frames and 1 window frame supplied by other. Total labor $400.00 Control/Editing Room Wall 1. Frame wall with 3 5/8” 25G material. 2. Insulate wall with R-11. 3. Provide and install RC-1 on 1 side of wall, 2’ centers. 4. Hang 5/8” sheetrock. 5. Tape and finish wall to match existing. Total labor and material $3,255.00 Control/Editing Ceiling 1. Repair existing ceiling where lights are being removed. 2. Repair holes from existing electrical, humidifier etc. Total labor and material $498.00 Paint 1. Prime new sheetrock and repairs. 2. Paint hallway walls. 3. Paint Lobby walls. 4. Paint walls and ceilings in Control/Editing room. 5. Paint all new and existing door and frames. - Price includes painting control/editing room Flat Black - Price includes 1 color for hallway and lobby walls and 1 door and frame color. Total labor and material $3,895.00